Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   ESMR At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Reporting Year 0
  
  
DRILLDOWN HISTORY:      [GO BACK TO ESMR AT-A-GLANCE LIST]  
Report Annual SMR ( MONNPDES ) report for 2017
  
  
  
  
  
General Information
Contract All Sections Expand All Sections
Agency Facility Reporting Period Due Date Date Received Certified By
Novato Sanitary District Novato and Ignacio WWTP 01/01/2017 to 12/31/2017 02/01/2018 01/31/2018 John Bailey
  
  
  
  
Expand/Contract Monitoring Locations
Monitoring Locations
Name Type Lat/Long Associated Discharge Point Receiving Water Description(-)
E-003 Effluent Monitoring None Novato Discharge Point 001 N/A At a point in the outfall from the Novato Plant between the point of discharge and the point at which all waste tributary to that outfall is present.
EFF-001 Effluent Monitoring None Novato Discharge Point 001 N/A At any point in the Novato Plant?s outfall between the point of discharge and the point at which all waste tributary to that outfall is present (located at the WWTP).
EFF-001P Effluent Monitoring None Novato Discharge Point 001 N/A At a point where all water from the pond to the outfall is present upstream of the connection to the common outfall.
EFF-001REC Recycled Water Monitoring None Novato Discharge Point 001 N/A A point in the plant at which all treatment phases are complete, including disinfection (formerly E-002). Effluent flow may be monitored at any location representative of the total flow to reclamation facilities (including recycled water).
INF-001 Influent Monitoring None Novato Discharge Point 001 N/A At any point in the Novato Plant headworks after the influent bar screens at which all waste tributary to the system is present.
Total Monitoring Locations: 5
  
  
  
  
Expand/Contract No Discharge Dates
No Discharge Dates
Discharge Point Name Description(+) Dates of No Discharge Comments
  
  
  
  
Expand/Contract Analytical Data
Data Summary-Analytical
Monitoring Point Parameter Analytical Method Qualifier Result Units Sample Date MDL ML RL Comments
Total Analytical Data Points: 0
  
  
  
  
Expand/Contract Calculated Data
Data Summary-Calculated
Monitoring Point Parameter Analytical Method Qualifier Result Units Sample Date Comments
Total Calculated Data Points: 0
  
  
  
  
Expand/Contract Calculated Data
Violations
Violation ID Violation Date Violation Type Description(+) Corrective Action Created By Last Modified By
Total Violations: 0
  
  
  
  
Expand/Contract Attachment Data
Attachments
File Name Description Size
2017 Annual Recycled Water.pdf 2017 Recycled Water Report 2.34 MB
Appendix A - Facilities Evaluation 2017.pdf 2017 - Reliability and Facilities Evaluation 48 KB
Appendix B - List of Approved Analyses 2017.pdf 2017 - Approved Analysis, Laboratory 63 KB
Appendix C - Process Diagrams & Sample Locations.pdf Process Diagrams and Sample Locations 1.54 MB
Appendix D - Mercury Load to Bay 2017.pdf 2017 - Mercury Loading to Bay 59 KB
Appendix E - BACWA RMP Participation Letter 2017.pdf 2017 - Regional Monitoring Plan Participation 108 KB
Appendix F - Collection System Overflows 2017.pdf 2017 - Collection System Report 16 KB
Total Attachments: 7
  
  
  
  
Expand/Contract Cover Letter
Cover Letter
File Name
2017 Annual SMR.pdf
Total No. of Cover Letter Files: 1      Cover Leter Text: No
  
  
The current report was generated with data as of: 12/10/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page