Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   ESMR At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Reporting Year 0
  
  
DRILLDOWN HISTORY:      [GO BACK TO ESMR AT-A-GLANCE LIST]  
Report Annual SMR ( MONNPDES ) report for 2018
  
  
  
  
  
General Information
Contract All Sections Expand All Sections
Agency Facility Reporting Period Due Date Date Received Certified By
Novato Sanitary District Novato and Ignacio WWTP 01/01/2018 to 12/31/2018 02/01/2019 01/31/2019 John Bailey
  
  
  
  
Expand/Contract Monitoring Locations
Monitoring Locations
Name Type Lat/Long Associated Discharge Point Receiving Water Description(+)
E-003 Effluent Monitoring None Novato Discharge Point 001 N/A At a point in the outfall from the Novato Plant between the point of discharge
EFF-001 Effluent Monitoring None Novato Discharge Point 001 N/A At any point in the Novato Plant?s outfall between the point of discharge and t
EFF-001P Effluent Monitoring None Novato Discharge Point 001 N/A At a point where all water from the pond to the outfall is present upstream of
EFF-001REC Recycled Water Monitoring None Novato Discharge Point 001 N/A A point in the plant at which all treatment phases are complete, including disin
INF-001 Influent Monitoring None Novato Discharge Point 001 N/A At any point in the Novato Plant headworks after the influent bar screens at whi
Total Monitoring Locations: 5
  
  
  
  
Expand/Contract No Discharge Dates
No Discharge Dates
Discharge Point Name Description(+) Dates of No Discharge Comments
  
  
  
  
Expand/Contract Analytical Data
Data Summary-Analytical
Monitoring Point Parameter Analytical Method Qualifier Result Units Sample Date MDL ML RL Comments
Total Analytical Data Points: 0
  
  
  
  
Expand/Contract Calculated Data
Data Summary-Calculated
Monitoring Point Parameter Analytical Method Qualifier Result Units Sample Date Comments
Total Calculated Data Points: 0
  
  
  
  
Expand/Contract Calculated Data
Violations
Violation ID Violation Date Violation Type Description(+) Corrective Action Created By Last Modified By
Total Violations: 0
  
  
  
  
Expand/Contract Attachment Data
Attachments
File Name Description Size
Appendix A-Facilities Evaluation 2018.pdf 2018-Reliability and Facilities Evaluation 38 KB
Appendix B- List of Approved Analyses 2018.pdf 2018-Approved Analysis,Laboratory 18 KB
Appendix C - Process Diagrams & Sample Locations.pdf Process Diagrams and Sample Locations 1.54 MB
Appendix D-Mercury Load to Bay 2018.pdf 2018-Mercury Load to Bay 59 KB
Appendix E-BACWA NPDES Permit Letter with SFEI Letter attached 1-23-19.pdf 2018 BACWA and RMP Participation Letters 312 KB
Appendix F-Collection System Totals 2018.pdf 2018 Collection System Report 32 KB
Appendix G-Effluent Characterization.pdf 2018-Effluent Characterization Study and Report 72 KB
Total Attachments: 7
  
  
  
  
Expand/Contract Cover Letter
Cover Letter
File Name
2018 - SMR.pdf
Total No. of Cover Letter Files: 1      Cover Leter Text: No
  
  
The current report was generated with data as of: 12/30/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page