Effluent Concentrations (mg/l),,,,,,,,,,,,,,,,,,,, Novato Sanitary District,,,,,,,,,,,,,,,,,,,, "Sandeep Karkal, Manager-Engineer, (415) 892-1694, sandeepk@novatosan.com",,,,,,,,,,,,,,,,,,,, "Quarter of Year (Q1, Q2, Q3, Q4 YYYY)",Date,Peak Flow Event (Y/N),Flow (MGD),,TN (mg/L),TDN (mg/L),TKN (mg/L),SKN (mg/L),NO3 (mg/L),NO2 (mg/L),Total NH3 (mg/L),Urea* (mg/L),TP (mg/L),TDP (mg/L),DRP** (mg/L),pH (s.u.),,Temp (oC),,TSS (mg/L) ,(mm/dd/yyyy),,Ave Daily,Peak,TKN+NO3+NO2,SKN+NO3+NO2,,,,,,,,,Grab or composite,Min,Max,Min,Max, Q3 2012,7/10/2012,N,4.23,8.15,14.08,13.78,1.8,1.5,12,0.28,0.53,,0.25,0.16,0.028,7.1,,23,,2.5 Q4 2012,11/8/2012,N,4.55,7.74,14.51,14.51,1.4,1.4,13,0.11,0.32,,0.15,0.095,0.027,7.1,,21.1,,0.5 Q4 2012,11/14/2012,N,4.23,13.25,13.436,13.036,1.4,1,12,0.036,0.11,,0.17,0.097,0.02,7,,20.7,,2.2 Q4 2012,12/13/2012,N,5.07,13.11,10.602,10.602,1.3,1.3,9.3,0.002,0.12,,0.74,0.68,0.85,7.2,,18.3,,1.1 Q4 2012,12/19/2012,N,5.34,8.11,10.211,10.011,1.3,1.1,8.9,0.011,0.1,,0.64,0.58,0.91,7.2,,17.5,,1.1 Q1 2013,1/11/2013,N,5.68,8.97,11.519,10.999,1.5,0.98,10,0.019,0.1,,1.6,1.5,1.6,7.2,,16.4,,3.1 Q1 2013,1/22/2013,N,5,8.6,11.11,11.11,1.3,1.3,9.6,0.21,0.13,,0.69,0.62,0.51,7.2,,17.2,,2.9 Q1 2013,2/13/2013,N,4.86,11.25,14.34,13.74,1.8,1.2,12,0.54,0.16,,1.2,1.1,0.61,7.1,,17.5,,5 Q1 2013,2/22/2013,N,4.72,8.14,18.34,17.74,5.4,4.8,12,0.94,2.9,,2.8,2.5,2.9,7,,17.3,,13.2 Q1 2013,3/6/2013,N,5.86,9.61,17.79,15.99,5.8,4,11,0.99,3.55,,2.6,2.6,2.5,7.1,,17.3,,16 Q1 2013,3/20/2013,N,4.91,7.64,13.97,14.12,0.77,0.92,13,0.2,0.18,,2.4,2.3,2.8,7.1,,18.4,,2.6 Q2 2013,4/3/2013,N,5.27,7.35,13.017,11.557,2,0.54,11,0.017,0.11,,2.2,1.9,2.2,7.1,,19.6,,4.4 Q2 2013,4/23/2013,N,4.01,6.99,17.529,17.829,1.5,1.8,16,0.029,0.1,,2.5,2.5,2.5,7.1,,21.5,,5.4 Q2 2013,5/10/2013,N,4.01,7.86,16.216,15.516,2.2,1.5,14,0.016,0.1,,0.54,0.48,0.61,7,,21.5,,4 Q2 2013,5/16/2013,N,4.05,7.14,14.208,13.508,2.2,1.5,12,0.008,0.1,,0.16,0.11,0.028,7.1,,21.4,,4.2 Q3 2013,7/18/2013,N,3.53,5.5,14.55,13.35,2.2,1,12,0.35,1.29,,0.13,0.075,0.012,7,,23.1,,1.4 Q4 2013,10/17/2013,N,4.43,9.91,14.19,13.62,1.1,0.53,13,0.09,0.14,,0.61,0.55,0.27,6.9,,22.8,,2.3 Q42013,10/25/2013,N,4.22,7.34,13.95,13.15,1.8,1,12,0.15,0.51,,1.4,1.4,1.2,6.9,,22.2,,3.9 Q42013,11/15/2013,N,4.13,6.69,14.382,13.212,1.3,0.13,13,0.082,0.18,,0.24,0.093,0.061,7,,21.6,,3.2 Q42013,11/22/2013,N,4,7.67,11.914,11.384,0.88,0.35,11,0.034,0.1,,0.2,0.13,0.029,7,,20.8,,4.3 Q4 2013,12/6/20013,N,4.27,9.05,15.03,14.5,1.5,0.97,13,0.53,0.86,,0.22,0.13,0.023,7,,18.7,,3.2 Q4 2013,12/16/2013,N,4.01,7.34,15.69,15.39,5.2,4.9,9.6,0.89,3.89,,0.27,0.18,0.025,7,,19,,3.8 Q1 2014,1/10/2014,N,4.21,6.4,14.065,13.165,4,3.1,10,0.065,1.7,,0.44,0.35,0.027,6.9,,18.7,,3 Q1 2014,1/24/2014,N,4.39,7.5,14.1,14.7,3.4,4,7.3,3.4,3.5,,0.57,0.5,0.039,7,,18.3,,3 Q1 2014,2/12/2014,N,4.57,7,10,10.6,1.5,2.1,8.3,0.2,1.03,,0.3,0.2,0.026,7,,17.6,,3 Q1 2014,3/8/2014,N,5.05,7.8,9.97,10.34,0.07,0.44,9.884,0.016,0.1,,0.22,0.19,0.041,,,,,3 Q1 2014,3/19/2014,N,4.35,6,17.529,17.399,0.44,0.31,17,0.089,0.19,,4.1,4.2,5.1,6.9,,19.5,,3 Q2 2014,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0,,,,,,,,,,,,,, ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 ,,,,,0,0 THINGS TO DO,,,,,, "Only enter numbers in the cells for concentrations; or leave blank if no data (do not enter ""NA"")",,,,,, Delete red striked-through numbers under TN/TKN after all the data for that date are entered; leave the cell blank.,,,,,, THINGS NOT TO DO,,,,,, Do not report zero for non-detected values or DNQ(J) values;,,,,,, Do not put text before the number to indicate it is ND or DNQ.,,,,,, Do not report combined result for NO3+ NO2 under both parameters (see footnote ** below),,,,,, Quarter of Year definition,,,,,, Q3 2012 - July - September 2012,,,,,, Q4 2012: October - December 2012,,,,,, Q1 2013: January - March 2013,,,,,, Q2 2013: April - June 2013 Q3 2013: July - September 2013 Q4 2013: October - December 2013 Q1 2014: January - March 2014 Q2 2014: April - June 2014 "For seasonal dischargers, effluent sampling is not required in May/June 2014. However, if a prior dry weather sampling event is not conducted, " then the discharger shall make up the missed sampling event during May-June 2014; unless other arrangements have been made. Cells are conditionally formatted as explained below: "1. when a date is entered, the row is highlighted in orange; " "2. When a text is entered, the cell is shaded in blue; remove the text (""ND"", ""DNQ"", etc.), report a number." "3. If TKN or both NO3/NO2 conc. is missing, the calculated TN result is shown in red strike-through number. " " That means this TN result is not complete, deleted that TN, leave the cell blank." Footnotes for Table "* Urea monitoring is only required for the five largest POTWs: CCCSD, EBDA, EBMUD, SF Southeast, SJSC" **Collect DRP sample as a grab or composite in accordance with your agency's Sample Analysis Plan How to report non-detected (ND) /DNQ results "For NDs, i.e.,