Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID S911626
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
4 S911626 GLC Santa Fe Springs Building 4 Facility 10840 Norwalk Blvd Santa Fe Springs, CA, 90670 Los Angeles

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
S680550 Organization Goodman Santa Fe Springs SPE LLC N/A Private Business 03/22/2023
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
S559727 Construction 4 CONSTW 2009-0009-DWQ 4 19C400322 04/10/2023 Active
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
S888803 03/07/2024 Deficient BMP Implementation Track out observed leaving the site onto Norwalk Boulevard. Violation B Inspection
S888603 02/20/2024 Incomplete/Insufficient SWPPP • Post-Construction BMP Plan needs to be uploaded into SMARTS. • Responsible Parties information needs to be updated • Contractors list needs to be updated and included in the SWPPP • Construction schedule needs to be updated and included in the SWPPP • The discharger failed to update the QSP information in the SWPPP and SMARTS Violation B Inspection
S888602 02/20/2024 Deficient BMP Implementation • The discharger failed to minimize or prevent pollutants in stormwater discharges through the use of controls, structures, and management practices that achieve BAT for toxic and non-conventional pollutants and BCT for conventional pollutants. • The discharger failed to cover and berm loose stockpiled construction materials that were not actively being used (i.e., soil, spoils, aggregate, fly-ash, stucco, hydrated lime, etc.). • The discharger failed to ensure the effectiveness of existing BMPs to reduce or prevent pollutants in stormwater discharges. • The discharger failed to provide effective soil cover for inactive areas and all finished slopes. • The discharger failed to establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site. • The discharger failed to effectively manage all run-on, runoff within the site, and all runoff that discharges off the site. Run-on from off-site shall be directed away from all disturbed areas or site runoff shall collectively be in compliance with the effluent limitations in this General Permit. Violation B Inspection
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 3 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient BMP Implementation = Deficient BMP Implementation Incomplete/Insufficient SWPPP = Incomplete/Insufficient SWPPP

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
Total Enf Actions: 0

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
S2063867 Enforcement Follow-up Andrew Veloz 03/07/2024 N 1 N/A
S2063702 A Type compliance Andrew Veloz 02/20/2024 N 0 N/A
S2063699 B Type compliance Andrew Veloz 02/20/2024 N 2 N/A
Total Inspections: 3 Last Inspection: 03/07/2024
  
The current report was generated with data as of: 05/17/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page