General Information
|
Region |
Place ID |
Place Name |
Place Type |
Place Address |
Place County |
4 |
S876898 |
Willow and Harmony at The Grove |
Facility |
11850 Whittier Blvd Whittier, CA, 90601 |
Los Angeles |
|
|
Related Parties
|
|
Total Related Parties: 1
|
|
|
Regulatory Measures
|
|
Total Reg Measures: 1
|
|
|
Violations
|
Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
S874345 |
04/29/2020 |
Deficient BMP Implementation |
BMP Deficiencies:
• meter controls were observed inadequate in some perimeter areas of the project site
• Sediment track-out observed on the streets without proper BMPs in place
|
|
Violation |
B |
Inspection |
S874344 |
04/29/2020 |
Incomplete/Insufficient SWPPP |
SWPPP Deficiencies:
• The SWPPP does not include information about the Post-Construction Requirements
• Contractors list needs to be updated and placed in the SWPPP and uploaded to SMARTS
• Construction schedule needs to be updated and placed in the SWPPP and uploaded to SMARTS
|
|
Violation |
B |
Inspection |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|
|
Total Violations: 2
|
Priority Violations: 0
|
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.
|
Violation Types |
Deficient BMP Implementation = Deficient BMP Implementation
|
Incomplete/Insufficient SWPPP = Incomplete/Insufficient SWPPP
|
|
|
|
Enforcement Actions
|
|
Total Enf Actions: 1
|
|
|
Inspections
|
|
Total Inspections: 3 |
Last Inspection: 08/17/2022 |
|