Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID S857232
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
9 S857232 Phase I MS4 Facility - -, CA, - San Diego

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
S648262 Organization Oceanside City N/A City/Town Agency 06/27/2013
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
S488803 Phase I MS4 9 MNSTW1 R9-2013-0001 9 37M1000316 06/27/2013 Active
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
S887916 01/31/2022 MS4 Order Condition The Responsible Copermittees include the cities of Oceanside and Vista and the County of San Diego. The Responsible Copermittees in the San Luis Rey WMA failed to properly calculate the dry weather single sample maximum exceedance frequencies in accordance with Specific Provision 6.d.(1)(c)(i) of Attachment E to the Order as part of the 2020-2021 WQIP Annual Report. The Responsible Copermittees failed to report dry weather SSM exceedance frequencies for the entire monitoring year (October 1, 2020, to September 30, 2021) in one table. Violation B Report
S879983 09/21/2021 Deficient BMP Implementation Failure to implement BMPs to reduce pollutants in stormwater discharges to the MEP and effectively prohibit non-stormwater discharges associated with the application herbicides at an existing municipal facility. Pursuant to provision E.5.b.1.(d) of the Order Violation B Inspection
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 2 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient BMP Implementation = Deficient BMP Implementation MS4 Order Condition = MS4 Order Condition

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
S453175 Time Schedule Order R9-2024-0010 03/13/2024 Active
S452691 Notice of Violation 12/15/2023 Active
S443876 Notice of Violation 10/28/2021 Historical
Total Enf Actions: 3

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
S2063693 Complaint Nicholas White 02/15/2024 N 0 N/A
S2063692 Complaint Nicholas White 01/30/2024 N 0 N/A
S2053964 Complaint Erica Ryan 10/28/2021 N 1 N/A
Total Inspections: 3 Last Inspection: 02/15/2024
  
The current report was generated with data as of: 05/17/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page