Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID S823986
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
5R S823986 Phase II Small MS4 Facility - Red Bluff, CA, - Tehama

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
S614353 Organization City of Red Bluff N/A City/Town Agency 06/20/2013
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
S438851 Phase II Small MS4 5R MNSTW2 2013-0001-DWQ 5R52M2000247 07/08/2014 Active
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
S873396 07/13/2020 Deficient BMP Implementation MS4 is a source of pyrethroid pesticides to surface waters. Violation B Internal Report
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 1 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient BMP Implementation = Deficient BMP Implementation

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
S436967 13267 Letter/Order 07/13/2020 Active
Total Enf Actions: 1

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
S2058868 MS4 Audit Type Elizabeth Lee 01/05/2023 N 0 N/A
S2048900 MS4 Audit Type Elizabeth Lee 09/10/2020 N 0 N/A
Total Inspections: 2 Last Inspection: 01/05/2023
  
The current report was generated with data as of: 05/17/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page