Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID 851209
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
2 851209 Toley Farms Cannabis Site Petaluma, CA, 94954 Sonoma

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
584660 Organization Dan Bullene Operator Privately-Owned Business 09/24/2018
584659 Person Daniel Bullene Contact 09/24/2018
Total Related Parties: 2

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
425365 Enrollee - WDR 2 IRRICANNABIS 2023-0102-DWQ 2_49CC404438 04/23/2019 11/07/2028 Active N
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
1067338 09/27/2019 BMP The cultivator must evaluate the erosion controls on the road and augment them as necessary before the winter period begins on November 15, 2019, to prevent discharge of sediment to the unnamed channels adjacent to the road. Violation B Inspection
1067340 09/27/2019 HMOD By December 20, 2019, the cultivator must consult with Nicole Fairley (nicole.fairley@waterboards.ca.gov or 510-622-2424) to determine whether to apply for a Clean Water Act section 401 water quality certification and/or waste discharge requirements from the Regional Water Board for the culvert work related to the onsite stream crossings. The current culverts appear to be undersized thus restricting the passage of water. Violation B Inspection
1067341 09/27/2019 LREP The cultivator must site management plan to the Regional Water Board by December 20, 2019, to avoid enforcement by the original due date of December 23, 2018. Violation B Inspection
1067339 09/27/2019 UAUTHDISC The cultivator is immediately prohibited from discharging reverse osmosis reject water, irrigation tailwater, or any other waste stream to the ground without a separate permit. Violation B Inspection
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 4 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
BMP = BMP HMOD = Hydro Modification
LREP = Late Report UAUTHDISC = Unauthorized Discharge

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
Total Enf Actions: 0

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
38503959 B Type compliance inspection Joshua Hoeflich (Multiple) 09/27/2019 N 4 [Attachments]
Total Inspections: 1 Last Inspection: 09/27/2019
  
The current report was generated with data as of: 05/20/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page