Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID 848618
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
4 848618 Conference Center Drain Construction Dewatering Project Domestic Site NEC 471 East Ventura Camarillo, CA, 93010 Ventura

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
10195 Organization Camarillo City Owner and Operator City Agency 06/28/2018
556529 Person David Klotzle Contact 06/28/2018
Total Related Parties: 2

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
422356 Enrollee - WDR 4 WDRNONMUNIPRCS 2003-0003-DWQ 4A567700031 12/20/2018 04/30/2023 Historical N
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
1080503 07/30/2020 LREP 2Q 2020: The report was due on 7/30/2020 and received on 10/20/2020. The report was 82 days late. Violation B Report
1080502 04/30/2020 LREP 1Q 2020: The report was due on 4/30/2020 and received on 10/20/2020. The report was 173 days late. Violation B Report
1080500 01/30/2020 LREP 4Q 2019: The report was due on 1/30/2020 and received on 10/20/2020. The report was 264 days late. Violation B Report
1080501 01/30/2020 LREP Annual 2019: The report was due on 1/30/2020 and received on 10/20/2020. The report was 264 days late. Violation B Report
1080499 10/30/2019 LREP 3Q 2019: The report was due on 10/30/2019 and received on 10/20/2020. The report was 356 days late. Violation B Report
1080498 07/30/2019 LREP 2Q 2019: The report was due on 7/30/2019 and received on 10/20/2020. The report was 448 days late. Violation B Report
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 6 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
LREP = Late Report

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
Total Enf Actions: 0

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
41960826 B Type compliance inspection Woonhoe Kim 10/28/2020 N 0 Download
33558605 Prerequirement inspection Don Tsai 07/27/2018 Y 0 Download
Total Inspections: 2 Last Inspection: 10/28/2020
  
The current report was generated with data as of: 05/20/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page