Place ID 824400
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
3 824400 Cayucos SD WWTP Wastewater Treatment Facility 800 Toro Creek Morro Bay, CA, 93442 San Luis Obispo

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
524612 Person Katie DiSimone Case Worker 01/29/2021
594956 Person Sarah Hooper Is Onsite Manager For 12/18/2020
359110 Organization Cayucos SD Owner and Operator Special District 06/03/2020
137759 Organization Central Coast Regional Water Quality Control Board Regulating Waterboard 06/03/2020
604290 Person Rick Koon Contact 06/03/2020
Total Related Parties: 5

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
435501 NPDES Permit 3 NPDMUNIOTH R3-2020-0004 3 401019759 12/01/2020 11/30/2025 Active N
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
1123436 01/09/2023 DMON Due to local flooding and numerous road closures, we were unable to deliver the Total Coliform sample to an Accredited Laboratory that day. This particular situation was out of our control. Violation U eSMR
1113560 01/09/2023 DMON Total Coliform Sample was not analyzed on this day. Flooding in County prevented delivery of sample to a certified Lab within the holding period of the sample, due to closed roads and highways. Since this was a natural event, there is no corrective action. Violation U eSMR
1112350 12/04/2022 Order Conditions This report concerns an unauthorized discharge that occurred at the Cayucos Water Resource Recovery Facility at 800 Toro Creek Road, Morro Bay, California on December 4, 2022. Partially treated wastewater flowed out of our Aeration Basins and Membrane Tanks and ran to a capture basin on-site. All the wastewater was captured and was re-treated. During a period of rainy weather, one of our membrane tanks had a valve that failed to open. That valve failure shut down that Membrane Tank at 00:06 hours. We have determined that the reason for the valve failure was water in the electrical conduit, and have removed the water and re-sealed the conduit. The other two Membrane Tanks onsite were unable to keep up with influent flow, and also shut down, at 00:44 and 00:45 hours. One alarm was sent for each membrane tank failure. These alarms were not acknowledged by the operator on standby. During the time that all three Membrane Tanks were offline the average influent flow was 424 gallons per minute. From 00:45 to 05:28 hours, the flow was 120,541 gallons. At 05:28 hours, influent flow was stopped by turning off influent pumps. These flows were abnormally high for that time of the night due to the ongoing rain event. We pumped the overflow back from the capture basin to our Equalization Basin, where it was then sent back through the treatment system. The water was pumped to the Equalization Basin by end of day, Thursday, December 8th. The retreatment process was completed on December 15, 2022. To prevent a reoccurrence of this unauthorized discharge, we completed the repairs on the Membrane Tank valve on December 8, 2022. We have also changed the number of alarms that the standby operator receives from one for a failure to multiple alarms to ensure proper notification and timely response. A total of 130,785 gallons was recovered and reprocessed through the plant. This total includes washdown water. Violation B eSMR
1106605 06/05/2022 DMON 2nd influent flowmeter failed on June 5, 2022. Total flow data was provided by totalizers, which were still functioning. However, maximum flow rates are unable to be determined for the period of June 5-24, 2022. Repaired flowmeter; installed and sending data on June 25, 2022. Violation B eSMR
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 4 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
DMON = Deficient Monitoring Order Conditions = Order Conditions

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
Total Enf Actions: 0

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
54958203 B Type compliance inspection Audrey Liebhaber (Multiple) 02/22/2024 N 0 [Attachments]
Total Inspections: 1 Last Inspection: 02/22/2024
  
The current report was generated with data as of: 05/15/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.