Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID S932661
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
1 S932661 43640 Dr Fine Bridge Replacement Facility DN 101 PM36 2022 CGP Fort Dick, CA, 95531 Del Norte

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
S611983 Organization Caltrans District 01 N/A State Agency 06/26/2025
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
S586453 Caltrans Construction 1 CONSTW 2009-009-DWQ 1 08C408333 08/19/2025 Active
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
S903868 12/16/2025 Deficient BMP Implementation Failure to implement required BMPs, failure to improve BMPs after NAL exceedance, discharge to waters of the state, discharge in exceedance of NAL to waters of the US Violation B Inspection
S903816 11/05/2025 Deficient BMP Implementation 1. Failure to implement required minimum BMPs, 2. Failure to implement Additional Risk Level 2 and 3 requirements, including failure to install linear sediment control BMPs at the toe of slopes, 3. Failure to improve BMPs after an NAL exceedance, 4. Failure to amend the SWPPP to reflect current conditions, 5. Failure to perform required monitoring and/or sampling, 6. Unpermitted discharges and/or threatened discharges of earthen material or other construction related pollutants into waters of the state and waters of the United States. Violation B Inspection
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 2 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient BMP Implementation = Deficient BMP Implementation

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
S469720 Notice of Violation 03/09/2026 Active
S469719 Notice of Violation 01/21/2026 Active
Total Enf Actions: 2

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
S2069938 B Type compliance Walt Dragaloski 12/16/2025 N 1 N/A
S2069468 B Type compliance Walt Dragaloski 11/05/2025 N 1 N/A
Total Inspections: 2 Last Inspection: 12/16/2025
  
The current report was generated with data as of: 05/08/2026
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page