Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID S924126
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
8 S924126 Meadowlark Tract 20473 Facility 1630 E. San Bernardino Ave Redlands, CA, 92374 San Bernardino

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
S637400 Organization Tri Pointe Homes IE SD Inc N/A Private Business 08/06/2024
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
S576007 Construction 8 CONSTW 2009-0009-DWQ 8 36C404727 08/15/2024 Active
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
S891447 05/21/2025 Deficient BMP Implementation Sediment was present on San Bernardino Avenue, Capri Avenue, and along curbing throughout the project; Trash was present on the ground in numerous locations throughout the project site, including overflow from trash containers; Lids for all trash containers were not being used on a daily basis; Stockpiled waste material and debris onsite were not utilizing BMPs; Staining was present underneath numerous vehicles onsite; Leaks from machinery had not been immediately cleaned; Vehicles driving over soil stirred up large amounts of dust into the air; No perimeter BMPs were in use onsite in accordance with the site plan, which depicts silt fence around the perimeter of the entire project area; Tire tracks of sediment were present leading to/from the site onto the roadways; Construction vehicles were using gaps in chain link fencing to access the site instead of utilizing a stabilized construction entrance; Storm drain inlets did not have BMPs installed; Sediment was present on roadways surrounding the site, as well as roadways constructed as part of the project; Inspection reports failed to identify when the site had a discharge; and, No sampling report data was available for review onsite, nor were sampling results uploaded to SMARTS. Violation B Inspection
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 1 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient BMP Implementation = Deficient BMP Implementation

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
S456573 Notice of Violation 07/10/2025 Historical
S456357 Notice of Violation 06/10/2025 Historical
Total Enf Actions: 2

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
S2068085 B Type compliance Steven Stephansen 05/21/2025 N 1 N/A
Total Inspections: 1 Last Inspection: 05/21/2025
  
The current report was generated with data as of: 11/13/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page