Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID S923262
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
6B S923262 West Creek - Tract 17111 Facility NWC Mojave Drive and Amethyst Road Victorville, CA, 92394 San Bernardino

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
S605779 Organization DR Horton Los Angeles Holding Company N/A Private Business 07/03/2024
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
S574964 Construction 6V CONSTW 2009-0009-DWQ 6B36C404651 08/09/2024 Active
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
S891099 03/25/2025 Deficient BMP Implementation Temporary stockpiles were not protected - Violates Permit Attachments C, D, and E, Section B.1.b Violation B Inspection
S891114 03/25/2025 DREP Dewatering Plan needs to be signed by designated personnel Violation B Inspection
S891102 03/25/2025 Deficient BMP Implementation Waste material was not contained and securely stockpiled from wind and rain at all times, unless actively being used - Violates Attachment C, D, and E B.2g Violation B Inspection
S891110 03/25/2025 Deficient BMP Implementation A section of the channel on the north side of the property was impacted during the construction and installation of a manhole. This area falls outside of the designated construction project boundaries outlined in the design plans, located in the SWPPP. Streambed alteration and/or discharge of fill material to a surface water would require a CWA, section 401 water quality certification for impacts to federal waters (waters of the U.S.), or dredge and fill waste discharge requirements for impacts to non-federal waters. Violation B Inspection
S891100 03/25/2025 Deficient BMP Implementation BMPs are not implemented to prevent the tracking of loose construction and landscape materials- Violates Attachment C, D and E B.1.e Violation B Inspection
S891101 03/25/2025 Deficient BMP Implementation Wash water was not captured and properly managed - Violates Attachment C, D, and E B.2.a Violation B Inspection
S891105 03/25/2025 Deficient BMP Implementation Equipment/vehicles were not stored in a designated area fitted with appropriate BMPs - Violates Attachment C, D, and E B.3.b Violation B Inspection
S891106 03/25/2025 Deficient BMP Implementation Measures have not been implemented to control all non-stormwater discharges - Permit Attachment C, D, and E Section C.1 Violation B Inspection
S891111 03/25/2025 DREP The contractors and subcontractors were not identified in the SWPPP - Permit Order Section VII.B.5 Violation B Inspection
S891113 03/25/2025 DREP Spill Response Plan needs to be signed by designated personnel Violation B Inspection
S891104 03/25/2025 Deficient BMP Implementation Washout areas were not contained to prevent discharges into the underlying soil and onto underlying areas - Violates Attachment C, D, and E B.2.1 Violation B Inspection
S891107 03/25/2025 Deficient BMP Implementation Linear sediment controls were not installed along the toe, face, and at grade breaks of exposed slopes - Violates Permit Attachment D, E Section E.4 Violation B Inspection
S891108 03/25/2025 DREP Stormwater discharge samples have not been collected - Violates Permit Attachment E Section I.4.f Violation B Inspection
S891109 03/25/2025 DREP Non-visible pollutant monitoring has not been conducted - Permit Attachment D and E Section I.11.a Violation B Inspection
S891112 03/25/2025 DREP Needs to udate WDID in SWPPP Violation B Inspection
S891103 03/25/2025 Deficient BMP Implementation The Site does not have a spill kit - Violates Attachment C, D, and E B.2.h.i Violation B Inspection
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 16 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient BMP Implementation = Deficient BMP Implementation DREP = Deficient Report

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
S455966 Verbal Communication 03/25/2025 Historical
S455965 Verbal Communication 03/25/2025 Historical
Total Enf Actions: 2

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
S2067437 B Type compliance Tiara Crucius 03/25/2025 N 13 N/A
Total Inspections: 1 Last Inspection: 03/25/2025
  
The current report was generated with data as of: 06/26/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page