Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID S922465
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
8 S922465 Ascension Cemetery Expansion Facility 24754 Trabuco Rd Lake Forest, CA, 92630 Orange

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
S465625 Organization Roman Catholic Bishop of Orange N/A Other 06/04/2024
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
S573958 Construction 8 CONSTW 2009-0009-DWQ 8 30C404246 06/25/2024 Terminated
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
S890699 12/19/2024 Deficient BMP Implementation Failure to implement BMPs to control the off-site tracking of sediment, keep debris or trash in waste containers, cover waste disposal containers, secure and contain concrete washout areas and other washout areas that may contain additional pollutants to minimize discharge into the underlying soil and onto surrounding areas, contain fuel, grease, and oil from vehicles leaking into the ground, immediately clean leaks from vehicles, implement effective wind erosion control, minimize the disturbance of steep slopes, initiate stabilization for disturbed areas whenever earth disturbing activities ceased on any portion of the site and will not resume for a period exceeding 14 calendar days, stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site, install linear sediment controls along the toe of the slope, face of the slope, and at the grade breaks of exposed slopes, maintain and protect all storm drain inlets, maintain, repair, and/or implement design changes to BMPs after identification of failures or other shortcomings, have a QSP or delegate verify all BMP maintenance and repairs were appropriately implemented, and update the contact information for the Legally Responsible Person in SMARTS when the Legally Responsible Person changes. Violation B Inspection
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 1 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient BMP Implementation = Deficient BMP Implementation

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
S455393 Notice of Violation 12/31/2024 Historical
Total Enf Actions: 1

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
S2070263 NOT Caitlin Ruelas 01/27/2026 N 0 N/A
S2066616 B Type compliance Steven Stephansen 12/19/2024 N 1 N/A
Total Inspections: 2 Last Inspection: 01/27/2026
  
The current report was generated with data as of: 05/14/2026
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page