Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID S908593
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
9 S908593 Pure Water Program Morena Conveyance South & Middle Facility Sherman St & Custer St San Diego, CA, 92110 San Diego

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
S605183 Organization City of San Diego Engineering & Capital Projects N/A City/Town Agency 10/31/2022
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
S555446 Construction 9 CONSTW 2009-0009-DWQ 9 37C399325 12/14/2022 Active
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
S890685 12/09/2024 Deficient BMP Implementation Failure to implement construction entrance BMPs, maintenance of storm water conveyance system, properly manage waste, failure to protect construction materials, failure to implement erosion controls, and failure to provide correct information in SWPPP. Violation B Inspection
S890667 11/18/2024 Incomplete/Insufficient SWPPP CGP Attachment A. section K. Failure to provide necessary and correct information. Violation B Inspection
S890666 11/18/2024 Deficient BMP Implementation 1. CGP Attachment A, section J.1.ii. Failure to implement Best Management Practices (BMPs) to minimize or prevent pollutants in storm water discharges. 2. CGP Attachment A, section J.2.a.iv. Failure to minimize exposure of construction materials to precipitation. 3. CGP Attachment A, section J.2.a.v. Failure to implement BMPs to control off-site tracking of loose construction and landscape materials. 4. CGP Attachment A, section J.2.b.v. Failure to prevent discharges from waste disposal containers to the storm water drainage system or receiving water. 5. CGP Attachment A, section J.2.c.i. and ii. Failure to implement BMPs to prevent vehicle oil, grease, or fuel from leaking into the ground, storm drains or surface waters. 6. CGP Attachment A, section J.4.b. Failure to provide effective soil cover. 7. CGP Attachment A. section J.5.a. Failure to implement perimeter control BMPs. 8. CGP Attachment A. section J.5.c. Failure to implement linear sediment control BMPs. Violation B Inspection
S890668 11/17/2024 EFF Citizen complaint documented unauthorized trench dewatering discharge to the City of San Diego's MS4. Violation B Inspection
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 4 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient BMP Implementation = Deficient BMP Implementation EFF = Effluent
Incomplete/Insufficient SWPPP = Incomplete/Insufficient SWPPP

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
S455347 Staff Enforcement Letter 12/09/2024 Historical
S455333 Staff Enforcement Letter 12/03/2024 Historical
Total Enf Actions: 2

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
S2066399 B Type compliance Frank Melbourn 12/09/2024 N 1 N/A
S2066341 B Type compliance Frank Melbourn 11/18/2024 N 3 N/A
Total Inspections: 2 Last Inspection: 12/09/2024
  
The current report was generated with data as of: 05/23/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page