Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID S894451
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
5F S894451 Park Crossing Phase 2 Facility Southeast Corner of North Friant Road & East Audubon Drive Fresno, CA, 93720 Fresno

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
S618658 Organization Zinkin Development N/A Private Business 06/02/2021
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
S536723 Construction 5F CONSTW 2009-0009-DWQ 5F10C395233 09/27/2021 Terminated
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
S894977 09/02/2025 FOP Failure to obtain coverage under the 2022 CGP by 09/01/2025. Violation B Internal Report
S885565 11/02/2022 Deficient BMP Implementation Attachment D, Part E.1. Sediment Controls, which states: Risk Level 2 dischargers shall establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site. Violation B Inspection
S885564 11/02/2022 DREP Section VIII. Risk Determination, which states: The discharger shall calculate the site's sediment risk and receiving water risk during periods of soil exposure (i.e. grading and site stabilization) and use the calculated risks to determine a Risk Level(s) using the methodology in Appendix 1. For any site that spans two or more planning watersheds,13 the discharger shall calculate a separate Risk Level for each planning watershed. The discharger shall notify the State Water Board of the site’s Risk Level determination(s) and shall include this determination as a part of submitting the PRDs. If a discharger ends up with more than one Risk Level determination, the Regional Water Board may choose to break the project into separate levels of implementation. Violation B Internal Report
S885566 11/02/2022 Deficient BMP Implementation Attachment D, Part E.6. Sediment Controls, which states: Additional Risk Level 2 Requirement: Risk Level 2 dischargers shall ensure that all storm drain inlets and perimeter controls, runoff control BMPs, and pollutant controls at entrances and exits (e.g. tire washoff locations) are maintained and protected from activities that reduce their effectiveness. Violation B Inspection
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 4 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient BMP Implementation = Deficient BMP Implementation DREP = Deficient Report
FOP = Failure to Obtain Permit

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
S459826 Notice of Violation 09/05/2025 Active
S450340 Notice of Violation 05/19/2023 Active
Total Enf Actions: 2

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
S2058778 B Type compliance Ernesto Garcia 11/02/2022 N 0 N/A
Total Inspections: 1 Last Inspection: 11/02/2022
  
The current report was generated with data as of: 04/10/2026
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page