 |
|
Facility At-A-Glance Report |
|
|
[VIEW PRINTER FRIENDLY VERSION]
[EXPORT THIS REPORT TO EXCEL]
|
|
|
[REFINE SEARCH]
[NEW SEARCH]
[GLOSSARY]
Place ID S885855
|
|
|
|
|
|
General Information
|
Region |
Place ID |
Place Name |
Place Type |
Place Address |
Place County |
4 |
S885855 |
San Pedro HS Comprehensive Modernization |
Facility |
1001 W 15th St San Pedro, CA, 90731 |
Los Angeles |
|
|
Related Parties
|
|
Total Related Parties: 1
|
|
|
Regulatory Measures
|
|
Total Reg Measures: 1
|
|
|
Violations
|
Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
S888419 |
02/01/2024 |
Deficient BMP Implementation |
1. The discharger failed to minimize or prevent pollutants in stormwater discharges through the use of controls, structures, and management practices that achieve BAT for toxic and non-conventional pollutants and BCT for conventional pollutants.
2. The discharger failed to cover and berm loose stockpiled construction materials that were not actively being used (i.e., soil, spoils, aggregate, fly-ash, stucco, hydrated lime, etc.).
3. The discharger failed to ensure the effectiveness of existing BMPs to reduce or prevent pollutants in stormwater discharges.
4. The discharger failed to provide effective soil cover for inactive areas and all finished slopes
5. The discharger failed to establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site.
6. The discharger failed to effectively manage all run-on, all runoff within the site, and all runoff that discharges off the site. Run-on from off-site shall be directed away from all disturbed areas or shall collectively be in compliance with the effluent limitations in this General Permit.
|
|
Violation |
B |
Inspection |
S888418 |
02/01/2024 |
Incomplete/Insufficient SWPPP |
1. The discharger failed to upload a copy of the Post-Construction BMP Plan into SMARTS.
2. The discharger failed to update the contractors’ list in the SWPPP.
3. Failed to provide training information in the Annual Reports
|
|
Violation |
B |
Inspection |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|
|
Total Violations: 2
|
Priority Violations: 0
|
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.
|
Violation Types |
Deficient BMP Implementation = Deficient BMP Implementation
|
Incomplete/Insufficient SWPPP = Incomplete/Insufficient SWPPP
|
|
|
|
Enforcement Actions
|
|
Total Enf Actions: 1
|
|
|
Inspections
|
|
Total Inspections: 2 |
Last Inspection: 02/15/2024 |
|
|
|
|
 |
The current report was generated with data as of: 05/16/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
|
 |
Back to Main Page
|
Back to Top of Page
|
|
|
|
|