General Information
|
Region |
Place ID |
Place Name |
Place Type |
Place Address |
Place County |
9 |
S885259 |
Market St 47th to Euclid Ave Street Water & Sewer Replacement Project |
Facility |
Market St 47th to Euclid Ave San Diego CA 92102 San Diego, CA, 92102 |
San Diego |
|
|
Related Parties
|
|
Total Related Parties: 1
|
|
|
Regulatory Measures
|
|
Total Reg Measures: 1
|
|
|
Violations
|
Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
S876796 |
04/16/2021 |
Deficient BMP Implementation |
Inspection in response to a complaint. I observed two construction site entrances that were not stabilized. There were multiple areas/locations along the construction project alignment that were not stabilized. I observed lack of implementation of erosion controls, linear sediment controls. and perimeter controls per CGP Risk Level 1 requirements. City of SD has issued a Stop Work Order. See attached photos. |
|
Violation |
B |
Inspection |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|
|
Total Violations: 1
|
Priority Violations: 0
|
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.
|
Violation Types |
Deficient BMP Implementation = Deficient BMP Implementation
|
|
|
|
Enforcement Actions
|
|
Total Enf Actions: 1
|
|
|
Inspections
|
|
Total Inspections: 1 |
Last Inspection: 04/16/2021 |
|