Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID S883368
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
5F S883368 Tract 6241 Facility Armstrong south of Clinton Fresno, CA, 93727 Fresno

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
S605105 Organization Wilson Homes N/A Private Business 06/26/2020
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
S522742 Construction 5F CONSTW 2009-0009-DWQ 5F10C391232 08/25/2020 Active
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
S885571 11/15/2022 Deficient BMP Implementation Violation #2 Per the inspection report, the eastern and southern portions of the Project site all have disturbed soils. Board Staff did not observe adequate BMPs in place to prevent sediment runoff in case of a storm event. Attachment C, Section E.1. Sediment Controls, which states: Risk Level 1 dischargers shall establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site. Violation B Inspection
S885572 11/15/2022 Deficient BMP Implementation Violation #1 Concrete residue and excess concrete piles were observed on bare soil surfaces and surrounding areas throughout the project site. Attachment C, Section B.2.i, Good Site Management "Housekeeping", which states: Ensure the containment of concrete washout areas and other washout areas that may contain additional pollutants so there is no discharge into the underlying soil and onto the surrounding areas. Violation S Inspection
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 2 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient BMP Implementation = Deficient BMP Implementation

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
S450343 Notice of Violation 11/15/2022 Active
Total Enf Actions: 1

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
S2057543 B Type compliance Ernesto Garcia 09/01/2022 N 2 N/A
Total Inspections: 1 Last Inspection: 09/01/2022
  
The current report was generated with data as of: 06/06/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page