Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID S878959
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
4 S878959 Tract 5984 Facility Wooley Road Oxnard, CA, 93030 Ventura

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
S605498 Organization Williams Homes Inc N/A Private Business 01/28/2020
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
S516980 Construction 4 CONSTW 2009-0009-DWQ 4 56C389406 02/07/2020 Terminated
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
S880938 12/30/2021 Incomplete/Insufficient SWPPP SWPPP Violations: 1. The discharger failed to update the Risk Assessment for the project when the date for construction completion changed; the construction end date identified in SMARTS is December 31, 2021. A new Risk Assessment is required for the revised construction end date; the permittee needs to complete a revised Risk Assessment. 2. The SWPPP (in SMARTS) did not include the list of names of all contractors, subcontractors, and individuals who will be directed by the QSP. 3. The discharger failed to upload a Post-Construction BMP Plan. T 4. The discharger failed to submit the 2020-2021 Annual Report due on September 1, 2021. 5. The discharger failed to provide BMP weekly, pre-storm, during-storm, and post-storm inspection reports when requested by Staff on December 30, 2021. Violation B Inspection
S880937 12/30/2021 Deficient BMP Implementation BMP Violations: 1. The discharger failed to minimize or prevent pollutants in stormwater discharges through the use of controls, structures, and best management practices. 2. The discharger failed to provide adequate sediment and erosion control BMPs throughout the Site during a forecasted qualifying storm event (QSE). 3. Poor housekeeping was observed. Trash and concrete/stucco piles, debris, and spilled waste materials were observed throughout the Site without proper BMP measures in place. Violation B Inspection
S874630 10/22/2020 Deficient BMP Implementation Silt fence needs repair on SHarbor and W Wooley Road (dirt piles are outside of fencing) Drain cover needs repair on S Harbor and W Wooley Road Concrete pile needs to be covered Concrete debris around poured forms should be removed Track-out observed (Please show that street- sweeping is conducted) Stabilized entrance was observed to have rock in front of rumble plate but none on the side Violation B Inspection
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 3 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient BMP Implementation = Deficient BMP Implementation Incomplete/Insufficient SWPPP = Incomplete/Insufficient SWPPP

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
S446157 Notice of Violation 02/09/2022 Historical
S438427 Verbal Communication 10/29/2020 Historical
Total Enf Actions: 2

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
S2060908 NOT Andrew Veloz 06/29/2023 N 0 N/A
S2055871 Enforcement Follow-up Andrew Veloz 05/05/2022 N 0 N/A
S2055218 Enforcement Follow-up Andrew Veloz 03/11/2022 N 0 N/A
S2055217 Enforcement Follow-up Andrew Veloz 01/25/2022 N 0 N/A
S2054640 Enforcement Follow-up Andrew Veloz 01/19/2022 N 0 N/A
S2054639 Enforcement Follow-up Andrew Veloz 01/11/2022 N 0 N/A
S2054638 Enforcement Follow-up Andrew Veloz 01/06/2022 N 0 N/A
S2054637 B Type compliance Andrew Veloz 12/30/2021 N 2 N/A
S2049822 Inspection from Vehicle Lesley Walther 10/22/2020 N 0 N/A
Total Inspections: 9 Last Inspection: 06/29/2023
  
The current report was generated with data as of: 06/16/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page