Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID S844369
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
4 S844369 CORDOVA CONSTRUCTION SERVICES INC Facility 12506 MONTAGUE ST Pacoima, CA, 91331 Los Angeles

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
S640049 Organization CORDOVA CONSTRUCTION SERVICES INC N/A Private Business 02/08/2016
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
S469432 Industrial 4 INDSTW 2014-0057-DWQ 4 19I026456 02/23/2016 Active
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
S881438 03/16/2022 LREP late level 2 tech Violation B Internal Report
S880366 09/15/2021 Deficient BMP Implementation Lack of tracking and dust controls. The facility ground, adjacent sidewalk, and street were covered by dust/sediment. Violation B Inspection
S880365 09/15/2021 Incomplete/Insufficient SWPPP ¿ The Ad Hoc report for the 3/13/2020 sampling/rain event is not certified/submitted in SMARTS. ¿ Nitrate, Nitrite, and N+N should be monitored because they handle significant amount of wood/mulch and green wastes. Violation B Inspection
S876280 02/11/2021 LREP FAILURE TO SUBMIT THE LEVEL 2 EXCEEDANCE RESPONSE ACTION (ERA) TECHNICAL REPORT Violation B Report
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 4 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient BMP Implementation = Deficient BMP Implementation Incomplete/Insufficient SWPPP = Incomplete/Insufficient SWPPP
LREP = Late Report

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
S446234 Notice of Violation 03/16/2022 Historical
S444295 Verbal Communication 09/29/2021 Historical
S440008 Notice of Violation 02/11/2021 Withdrawn
S436257 Notice of Violation 02/18/2020 Historical
Total Enf Actions: 4

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
S2054140 B Type compliance Harumi Goya 09/15/2021 N 2 N/A
Total Inspections: 1 Last Inspection: 09/15/2021
  
The current report was generated with data as of: 11/07/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page