Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
1147150 |
03/02/2024 |
Deficient Reporting |
Incomplete 2024 Annual M&R; inconsistencies with septic tank reporting requirements |
|
Violation |
B |
Report |
1147154 |
03/02/2024 |
LREP |
Late submittal of 2024 Annual M&R; due 03/01/2024 received 8/1/2024 |
|
Violation |
B |
Report |
1147158 |
03/02/2024 |
OEV |
Flow Daily Maximum limit is 1250 GPD and reported value was 1500 GPD. |
|
Violation |
B |
Report |
1119821 |
08/08/2023 |
UAUTHDISC |
The RO treated cannabis cultivation wastewater is currently being used for landscape irrigation around the building and untreated cannabis cultivation wastewater is suspected to have been discharged to the ground likely from cannabis wastewater holding tank overflow. The site has not filed a Report of Waste Discharge (ROWD) with the Lahontan Water Board to obtain coverage under waste discharge requirements (WDR) or a waiver of WDRs to reuse cannabis cultivation wastewater for landscape irrigation or to dispose cannabis cultivation wastewater to the ground. |
Permittee must provide waste hauling records for brine water and untreated cannabis cultivation water, construction plumbing plans, and treated cultivation wastewater analytical laboratory report (s).
Permittee can share the waste hauling records, construction plumbing plans, and treated cultivation wastewater analytical laboratory report (s) with inspection staff prior to implementing the CAP. A CAP must be provided to inspectors no less than 30 days from receipt of this inspection report. |
Violation |
B |
Inspection |
1147149 |
03/02/2023 |
Deficient Reporting |
Incomplete 2023 Annual M&R; inconsistencies with septic tank reporting requirements |
|
Violation |
B |
Report |
1147153 |
03/02/2023 |
LREP |
Late submittal of 2023 Annual M&R; due 03/01/2023 received 8/1/2023 |
|
Violation |
B |
Report |
1147157 |
03/02/2023 |
OEV |
Flow Daily Maximum limit is 1250 GPD and reported value was 1500 GPD. |
|
Violation |
B |
Report |
1147148 |
03/02/2022 |
Deficient Reporting |
Incomplete 2022 Annual M&R; inconsistencies with septic tank reporting requirements |
|
Violation |
B |
Report |
1147152 |
03/02/2022 |
LREP |
Late submittal of 2022 Annual M&R; due 03/01/2022, received 08/01/2022 |
|
Violation |
B |
Report |
1147156 |
03/02/2022 |
OEV |
Flow Daily Maximum limit is 1250 GPD and reported value was 1500 GPD. |
|
Violation |
B |
Report |
1147147 |
03/02/2021 |
Deficient Reporting |
Incomplete 2021 Annual M&R; the report indicates that pumping was conducted but does not provide the required information; date of cleanout, nature of service, service company name, and service company license number |
|
Violation |
B |
Report |
1147151 |
03/02/2021 |
LREP |
Late submittal of 2021 Annual M&R; due 03/01/2021 received 8/1/2021 |
|
Violation |
B |
Report |
1147155 |
03/02/2021 |
OEV |
Flow Daily Maximum limit is 1250 GPD and reported value was 1500 GPD. |
|
Violation |
B |
Report |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|