1108584 |
04/04/2022 |
Order Conditions |
Trash from the Project's water diversion structure observed in the LA River |
|
Violation |
B |
Complaint |
1108789 |
03/14/2022 |
Order Conditions |
failed to restore areas of temporary impact (i.e., water diversion) to pre-contour conditions as required by the Certification section XII.H.1, which states that the City “shall restore all areas of temporary impacts to waters of the state and all Project site upland areas of temporary disturbance which could result in a discharge of waters of the state…”. |
|
Violation |
B |
Inspection |
1094374 |
08/20/2021 |
BMP |
The City failed to implement adequate perimeter controls. This is a CGP violation for WDID 4 19C386458. |
|
Violation |
B |
Inspection |
1094375 |
08/20/2021 |
LREP |
The City submitted the Annual Report for the Reporting Year 2019-2020 past the due date.The Annual Report was due on September 1, 2020 but was submitted on March 15, 2021. This is a CGP violation for WDID 4 19C386458. |
|
Violation |
B |
Report |
1094237 |
05/07/2021 |
LREP |
The Commencement of Construction Report and Annual Reports for 2019 and 2020 were not submitted. The Commencement of Construction Report was due at least seven days prior to start of initial ground disturbance activities, and the Annual Reports were due each year on the anniversary of the Project effective date, which were March 14, 2019 and March 14, 2020; however, the reports have not been submitted as of May 7, 2021. |
|
Violation |
B |
Report |
1108790 |
11/15/2020 |
LREP |
The City failed to submit water quality monitoring reports by the 15th day of each
subsequent sampling month in 2021 and 2022. This is a violation of the Certification section
XII.C.3. |
|
Violation |
B |
Report |
1094242 |
09/24/2020 |
BPP |
Monitoring reports show instances where Basin Plan water quality objectives were not met: turbidity levels in the Los Angeles River downstream of the Project were above 20% of the turbidity levels upstream of the Project; pH levels downstream of the Project exceeded past the permitted 8.5 upper range; and dissolved oxygen (DO) levels fell short of the 5 mg/L objective downstream of the Project. |
|
Violation |
B |
Report |
1094231 |
07/09/2019 |
BMP |
Soil ramps were without steel plates |
|
Violation |
B |
Inspection |
1094235 |
07/09/2019 |
Order Conditions |
Project footprint exceeded the area permitted by the WQC. |
|
Violation |
B |
Inspection |
1094226 |
07/09/2019 |
UAUTHDISC |
Groundwater that surfaced from excavation activities was allowed to flow through the active Project area and discharge into the Los Angeles River. |
|
Violation |
B |
Inspection |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|