Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID 825810
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
2 825810 Facebook Hibiscus Domestic Site NEC 307-309 Constitution Menlo Park, CA, 94025 San Mateo

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
554849 Person Marcos De la Cruz Case Worker 10/19/2016
545978 Person Marinus Lamprecht Contact 07/21/2016
557389 Person Peter M Krasnoff Is A Data Submitter For 06/30/2016
137758 Organization San Francisco Bay Regional Water Quality Control Board Regulating Waterboard 06/30/2016
557388 Organization Hibiscus Properties, LLC Owner and Operator Privately-Owned Business 06/30/2016
545978 Person Marinus Lamprecht Is Onsite Manager For 06/30/2016
Total Related Parties: 6

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
407832 Enrollee - NPDES 2 NPDNONMUNIPRCS R2-2017-0048 2 417210001 07/21/2016 09/01/2022 Historical N
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
1080469 03/06/2020 LREP Violation of Attachment E section IX.D.3 - submittal of 5-day permit violation report for January 29, 2020 effluent limit exceedance event. The Discharger provided 24-hr notification of the exceedance on February 4, 2020. Permit violation report was due at the latest on February 9, 2020. The report including description of this violation was submitted on March 6, 2020. The Discharger did not submit the 5-day permit violation report until March 6, 2020. Violation B Report
1080472 03/06/2020 LREP Violation of Attachment E section IX.D.3 - submittal of permit violation report within 5 days of notifying the Water Board. On February 27, 2020, the Discharger received a laboratory report identifying effluent limit violations corresponding to its February 26, 2020, sampling event. The Discharger didn''t notify the permit violations to the Water Board until March 5, 2020. The 5-day report was due on March 5, 2020, and it was submitted the following day. No deadline extension requests were received by the Water Board. The Discharger did not identify this violation on its March 6, 2020, permit violation report. Violation B Report
1080471 03/05/2020 Failure to Notify Violation of Attachment E section IX.D.1 - notify permit violations to the Water Board within 24-hrs of becoming aware of them. On February 27, 2020, the Discharger received a laboratory report identifying effluent limit violations corresponding to its February 26, 2020, sampling event. The Discharger didn''t notify the Water Board of the permit violations until March 5, 2020. The Discharger did not identify this violation on its March 6, 2020, permit violation report. Violation B Report
1080473 02/28/2020 DMON Violation of Attachment section VII (specifically Table E-2) - receiving water monitoring of exceeded parameters, pH, dissolved oxygen, hardness, salinity, standard observations. The Discharger conducted effluent and receiving water monitoring sampling for the exceeded parameters (Feb. 26, 2020 permit violation event) without monitoring the other parameters. The Discharger did not identify this violation on its March 6, 2020, permit violation report. Violation B Report
1078315 02/28/2020 CAT2 Toluene Daily Maximum limit is 0.5 ug/L and reported value was 1.03 ug/L. Positive confirmation sampling results from this event led the Discharger to replace the last set of lag parallel GAC vessels on March 2, 2020, because they were determined to be contaminated. Before resuming discharge, the Discharger confirmed that effluent concentrations from GAC vessels were non-detect. To avoid similar events, the Discharger plans to test the effluent of all GAC vessels following installation or replacement. Violation B Report
1078316 02/28/2020 CAT2 Xylenes, Total Daily Maximum limit is 0.5 ug/L and reported value was 1.22 ug/L. Positive confirmation sampling results from this event led the Discharger to replace the last set of lag parallel GAC vessels on March 2, 2020, because they were determined to be contaminated. Before resuming discharge, the Discharger confirmed that effluent concentrations from GAC vessels were non-detect. To avoid similar events, the Discharger plans to test the effluent of all GAC vessels following installation or replacement. Violation B Report
1078313 02/26/2020 CAT2 1,1,2-Trichloroethane Daily Maximum limit is 0.5 ug/L and reported value was 1.15 ug/L. Positive confirmation sampling results from this event led the Discharger to replace the last set of lag parallel GAC vessels on March 2, 2020, because they were determined to be contaminated. Before resuming discharge, the Discharger confirmed that effluent concentrations from GAC vessels were non-detect. To avoid similar events, the Discharger plans to test the effluent of all GAC vessels following installation or replacement. Violation B Report
1078314 02/26/2020 CAT2 Ethylbenzene Daily Maximum limit is 0.5 ug/L and reported value was 0.65 ug/L. Positive confirmation sampling results from this event led the Discharger to replace the last set of lag parallel GAC vessels on March 2, 2020, because they were determined to be contaminated. Before resuming discharge, the Discharger confirmed that effluent concentrations from GAC vessels were non-detect. To avoid similar events, the Discharger plans to test the effluent of all GAC vessels following installation or replacement. Violation B Report
1078309 02/26/2020 CAT2 Toluene Daily Maximum limit is 0.5 ug/L and reported value was 1.48 ug/L. Positive confirmation sampling results from this event led the Discharger to replace the last set of lag parallel GAC vessels on March 2, 2020, because they were determined to be contaminated. Before resuming discharge, the Discharger confirmed that effluent concentrations from GAC vessels were non-detect. To avoid similar events, the Discharger plans to test the effluent of all GAC vessels following installation or replacement. Violation B Report
1078312 02/26/2020 CAT2 Xylenes, Total Daily Maximum limit is 0.5 ug/L and reported value was 2.69 ug/L. Positive confirmation sampling results from this event led the Discharger to replace the last set of lag parallel GAC vessels on March 2, 2020, because they were determined to be contaminated. Before resuming discharge, the Discharger confirmed that effluent concentrations from GAC vessels were non-detect. To avoid similar events, the Discharger plans to test the effluent of all GAC vessels following installation or replacement. Violation B Report
1080470 02/03/2020 DMON Violation of Attachment E section VII (specifically Table E-2) - receiving water monitoring for exceeded parameters (toluene, xylene), pH, dissolved oxygen, hardness, salinity, and standard observations. The discharger only conducted effluent confirmation sampling on February 3, 2020, but did not monitor the receiving water. No corrective actions were identified in the Discharger's March 6, 2020, 5-day permit violation report. Violation B Report
1078306 01/29/2020 CAT2 Toluene Daily Maximum limit is 0.5 ug/L and reported value was 0.830 ug/L. The discharger conducted confirmation sampling on February 3, 2020, upon notification by the laboratory on the same day. The results were non-detect. The discharger continued to discharge without corrective actions. Notification of the effluent limit exceedance was provided to the Water Board on February 4, 2020. Violation B Report
1078307 01/29/2020 CAT2 Xylenes, Total Daily Maximum limit is 0.5 ug/L and reported value was 0.640 ug/L. The discharger conducted confirmation sampling February 3, 2020, upon notification by the laboratory on the same day. The results were non-detect. The discharger continued to discharge without corrective actions. Notification of the effluent limit exceedance was provided to the Water Board on February 4, 2020. Violation B Report
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 13 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
CAT2 = Category 2 Pollutant (Effluent Violation for Group 2 Pollutant) DMON = Deficient Monitoring
Failure to Notify = Failure to Notify LREP = Late Report

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
442193 Admin Civil Liability R2-2021-1016 06/03/2021 Historical
415779 Admin Civil Liability R2-2017-1030 09/28/2017 Historical
Total Enf Actions: 2

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
Total Inspections: 0 Last Inspection: None
  
The current report was generated with data as of: 06/26/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page