Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID 809465
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
6B 809465 Fort Irwin Waterworks Surface Impoundment 4800 Goldtsone Fort Irwin, CA, 92310 San Bernardino

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
608707 Person Jonathan M Green Is Onsite Manager For 05/14/2020
16461 Organization Fort Irwin National Training Center Owner Federal Agency 09/29/2014
Total Related Parties: 2

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
398263 WDR 6V LNDISPOTH R6V-2015-0004 6B361409017 02/11/2015 02/11/2025 Active N
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
1099776 08/29/2021 Order Conditions Freeboard Daily Minimum limit is 24 inches and reported value was 22 inches. Violation B Report
1084240 10/15/2020 LREP Submitted 3rd Qtr. Report 60 days Late Violating Board Order R6V-2015-0004 MRP IV. B. 03/23/2021 Discharger responded to violations, please see attachment Dated March 23, 2021. Violation B Report
1087929 09/23/2020 Order Conditions LCRS readings exceeded the Permit action rate for Chloride (>10,000), Sodium (>10,000), and Specific Conductance (>12,500 μmhos/cm). Violating Board order R6V-2015-0004, WDR section II.D. Table 6. The team is continuously observing the chloride, sodium and specific conductance level and water pumped in LCRS to make sure they are in compliance with the permit (Board Order No. R6V-2015-0004). Violation B Report
1087930 07/13/2020 GWAT Exceeded MCL limits for Arsenic (0.010mg/L or 10 µg/L), Violating Board Order R6V-2015-0004 Section WDR I.4.B.1.a.&b. The background arsenic level in monitoring wells (GW-02, GW-03, GW-04, GW-06 and GW-07) were near or above 10 ug/L in the initial operation period (2013 to 2016). The arsenic sampled in 2020 third quarter were similar to the level in the initial operation period. Please refer to Appendix A for the highlighted background arsenic levels. We will include this observation in the future reports. Violation B Report
1077068 01/16/2020 Order Conditions VZMS readings exceeded the Permit action rate for Chloride (>5,000), Sodium (>5,000), and Specific Conductance (>12,500). Violating Board order R6V-2015-0004, WDR section II.D. Table 6. LCRS and VZMS were pumped monthly and calculated leakage rates for each pond did not show evidence of exceeding the permit`s action leakage rate of 15.6 gallons per day per day. On 16 January 2020, Discharger pumped 10.5 gallons from VZMS (Pond 7) which was placed out of service until further notice. Jacobs has developed an action plan to further examine Pond 3, 5 and Pond 7 accordingly. Discharger will report progress on the following quarterly report. Violation B Report
1077030 01/15/2020 LREP Report was 27 days late. Violating Board Order RV6-20155-0004 MRP section IV.C. Discharger did not propose or identify any corrective action taken. Violation B Report
1077035 01/15/2020 LREP Report was 27 days late. Violating Board Order RV6-20155-0004 MRP section IV.C. Violation B Report
1077079 01/12/2020 Order Conditions Freeboard Daily Minimum limit is 24 inches and reported value was 16 inches. Discharger did not propose nor identify any corrective actions. Violation B Report
1077067 12/31/2019 Deficient Reporting Failed to provide several parameters related to groundwater monitoring, effluent results. Violating Board Order R6V-2015-0004 General Provisions 1. & 2. Discharger did not propose or identify any corrective actions taken. Violation B Report
1077044 07/25/2019 Order Conditions VZMS readings exceeded the Permit action rate for Chloride (>5,000), Sodium (>5,000), and Specific Conductance (>12,500). Violating Board order R6V-2015-0004, WDR section II.D. Table 6. LCRS and VZMS were pumped monthly and calculated leakage rates for each pond did not show evidence of exceeding the permit`s action leakage rate of 15.6 gallons per day per day. On 16 January 2020, Discharger pumped 10.5 gallons from VZMS (Pond 7) which was placed out of service until further notice. Jacobs has developed an action plan to further examine Pond 3, 5 and Pond 7 accordingly. Discharger will report progress on the following quarterly report. Violation B Report
1077048 07/05/2019 Order Conditions Freeboard Daily Minimum limit is 24 inches and reported value was 23 inches. Discharger did not propose nor identify any corrective actions taken. Violation B Report
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 11 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient Reporting = Deficient Reporting GWAT = Groundwater
LREP = Late Report Order Conditions = Order Conditions

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
442738 Oral Communication 03/18/2021 Historical
415678 Oral Communication R6V-2015-0004 08/09/2017 Historical
411891 Oral Communication 02/17/2017 Historical
Total Enf Actions: 3

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
55471856 B Type compliance inspection Christopher Avalos 04/05/2024 N 0 [Attachments]
47787243 B Type compliance inspection Christopher Avalos 05/18/2022 N 0 Download
40710882 B Type compliance inspection Christopher Avalos 06/25/2020 N 0 Download
32502672 B Type compliance inspection Christopher Avalos 05/10/2018 N 0 Download
26085409 Miscellaneous inspection Alonzo Poach 10/13/2016 N 0 N/A
24447675 Miscellaneous inspection Alonzo Poach 04/25/2016 N 0 N/A
21713483 Field Oversight Alonzo Poach 09/10/2015 N 0 N/A
20096450 Miscellaneous inspection William Muir 03/10/2015 N 0 Download
Total Inspections: 8 Last Inspection: 04/05/2024
  
The current report was generated with data as of: 05/31/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page