| 1160537 |
09/27/2026 |
DMON |
3. The plant was running for a short period in the early morning, from approximately 12:00 a.m. to 3:00 a.m. After completing our weekly maintenance cleaning, we were unable to get the plant back online. We were also occupied with installing a flow meter, which prevented us from getting the plant running in time for the lab to collect a sample that day. |
3. We had several callouts that day, which left us short-staffed. In the future, we will plan additional work more carefully and schedule it for days when staffing levels are sufficient. |
Violation |
U |
eSMR |
| 1160535 |
07/21/2026 |
DMON |
2. There was a power outage, and the emergency generator failed to start. As a result, the incubator temperature dropped below its set point for approximately 10 minutes. |
2. We had our maintenance technician repair the issue with the emergency generator. |
Violation |
U |
eSMR |
| 1160536 |
07/15/2026 |
DMON |
1. An operator failed to rotate the alum tanks when the level got low, despite signing off that the task had been completed. As a result, the plant went into a rolling count. The plant continued operating during the first part of the day until we were able to collect a sample and our 550 gate closed. We did have a sample from the previous 24 hours, but it was not collected on the same day as the incident. |
1. We spoke with the operator about the importance of accurately signing off on completed tasks and ensuring that work is actually performed before documenting it. This is to help prevent similar incidents from happening again. We also had our instrumentation technician investigate why the alarm did not call out sooner. |
Violation |
U |
eSMR |
| 1145437 |
05/12/2025 |
OEV |
Total Coliform Daily Maximum limit is 23 MPN/100 mL and reported value was 42.6 MPN/100 mL at EFF-001. |
Operations staff implemented the contingency plan:
¿ Closed the 550 gate
¿ Checked for torn panels
¿ Deep-cleaned the UV channel and filled it with chlorinated water
After the third exceedance, the Collections crew cleaned out the channel coming from the disc filters due to a significant buildup of settled solids. Operations staff also re-checked for torn panels and drained the UV channel.
|
Violation |
U |
eSMR |
| 1145438 |
05/08/2025 |
OEV |
Total Coliform 7-Day Median limit is 2.2 MPN/100 mL and reported value was 4.1 MPN/100 mL at EFF-001. |
Operations staff implemented the contingency plan:
¿ Closed the 550 gate
¿ Checked for torn panels
¿ Deep-cleaned the UV channel and filled it with chlorinated water
After the third daily maximum exceedance reported for this quarter, the Collections crew cleaned out the channel coming from the disc filters due to a significant buildup of settled solids. Operations staff also re-checked for torn panels and drained the UV channel.
|
Violation |
U |
eSMR |
| 1145436 |
05/02/2025 |
OEV |
Total Coliform Daily Maximum limit is 23 MPN/100 mL and reported value was 108.6 MPN/100 mL at EFF-001. |
Operations staff implemented the contingency plan:
¿ Closed the 550 gate
¿ Checked for torn panels
¿ Deep-cleaned the UV channel and filled it with chlorinated water
After the third exceedance, the Collections crew cleaned out the channel coming from the disc filters due to a significant buildup of settled solids. Operations staff also re-checked for torn panels and drained the UV channel.
|
Violation |
U |
eSMR |
| 1145435 |
04/29/2025 |
OEV |
Total Coliform Daily Maximum limit is 23 MPN/100 mL and reported value was 29.8 MPN/100 mL at EFF-001. |
Operations staff implemented the contingency plan:
¿ Closed the 550 gate
¿ Checked for torn panels
¿ Deep-cleaned the UV channel and filled it with chlorinated water
After the third exceedance, the Collections crew cleaned out the channel coming from the disc filters due to a significant buildup of settled solids. Operations staff also re-checked for torn panels and drained the UV channel.
|
Violation |
U |
eSMR |
| 1142364 |
02/12/2025 |
Order Conditions |
Tertiary Influent, Total Nitrogen, 24-hour composite (monthly), lab instrument failure on 2/12 led to planned resample on 2/26 which did not occur as planned. |
1. Letter of reprimand placed in the responsible employee's personnel file.
2. Changed the planning and management of the monthly samples to subcontract the required testing immediately when an instrument fails.
3. Lab to plan on performing the monthly samples two times per month to provide redundancy in the lab's monitoring and reporting program plan. |
Violation |
U |
eSMR |
| 1142365 |
02/12/2025 |
Order Conditions |
Tertiary effluent, Nitrate (as N), grab sample (monthly), lab instrument failure on 2/12 led to planned resample on 2/26 which did not occur. |
1. Letter of reprimand placed in the responsible employee's personnel file.
2. Changed the planning and management of the monthly samples to subcontract the required testing immediately when an instrument fails.
3. Lab to plan on performing the monthly samples two times per month to provide redundancy in the lab's monitoring and reporting program plan. |
Violation |
U |
eSMR |
| 1142366 |
02/12/2025 |
Order Conditions |
Tertiary effluent, total nitrogen, grab sample (monthly), lab instrument failure on 2/12 led to planned resample on 2/26 which did not occur. |
1. Letter of reprimand placed in the responsible employee's personnel file.
2. Changed the planning and management of the monthly samples to subcontract the required testing immediately when an instrument fails.
3. Lab to plan on performing the monthly samples two times per month to provide redundancy in the lab's monitoring and reporting program plan. |
Violation |
U |
eSMR |
| 1118667 |
06/10/2023 |
OEV |
Total Coliform Other limit is 0 MPN/100 mL and reported value was 0 MPN/100 mL at EFF-001. |
Written reprimand in the responsible employee¿s file. |
Violation |
U |
eSMR |
| 1106466 |
07/05/2022 |
OEV |
Total Coliform Instantaneous Maximum limit is 240 MPN/100 mL and reported value was 2419.6 MPN/100 mL at EFF-001. |
Torn disk filter panels were identified and replaced. |