Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
1135146 |
08/03/2024 |
DMON |
After an extended shutdown at San Juan Capistrano GW TP(M-001E) for emergency maintenance the plant was brought online at the end of the sampling week. The Weekly monitoring for Turbidity, TDS and Settleable Solids samples that are scheduled and normally sampled at the start of the week were not collected. |
We will ensure that samples will be collected when needed. |
Violation |
U |
eSMR |
1122938 |
11/18/2023 |
DMON |
The 5-day-a-week monitoring requirement was not met at M-001E(San Juan Capistrano GW TP) for TSS and pH for the week ending on 11/18/23.
Discharger Comment-The plant was turned off on 11/16/23 at 6:30 am and was turned back on 11/17/23 at 5:30 pm. TSS and pH were sampled on 11/16 and 11/19 before and after shutdown. |
Operators will ensure that samples are taken before and after shutdowns.
SMWD will meet with SOCWA to clarify requirements of the permit.
|
Violation |
U |
eSMR |
1121399 |
09/16/2023 |
DMON |
The SS monitoring for M-001E, San Juan Capistrano Groundwater Treatment Plant was missed due to miscommunication where two operators thought the other operator had completed the task and both were in error. |
A checklist has been created to ensure all sampling events occur at designated times. |
Violation |
U |
eSMR |
1128149 |
08/02/2023 |
LREP |
The June 2023 eSMRs was submitted on August 2, 2023, 1 day after the due date of August 1, 2023. |
|
Violation |
B |
Report |
1112954 |
12/31/2022 |
DMON |
Monthly Effluent Oil and Grease was not monitored in December 2022 for location M-001E(San Juan Capistrano Groundwater Treatment Plant) due to the unanticipated catastrophic failure leading to an emergency shutdown on 12/5/22. It was discovered that the clearwell had experienced significant corrosion which led to structural failures of numerous roof beams, roof panels, and floor sections. The clearwell is a critical component to the entire treatment process and does not have redundancy. Treatment plant is offline and not discharging until appropriate repairs are completed. |
In late January 2023, the District anticipates awarding a contract for the removal of the 300,000 gallon bolt up steel tank. We anticipate the work to start three weeks after the award. We are also out to bid for a welded steel tank and anticipate it will take 20 weeks to construct including preparation of shop drawing, manufacturing the steel plates, and assembling the tank. This would put the Plant back into service in the summer of 2023. Sampling will resume when the plant is back in service anticipated Summer 2023. |
Violation |
U |
eSMR |
1103746 |
03/31/2022 |
CAT1 |
Oil and Grease Monthly Average limit is 25 mg/L and reported value was 57 mg/L at M-001E. |
All samplers will review and adhere to our sampling protocols to ensure future problems do not reoccur. |
Violation |
U |
eSMR |
1103744 |
03/12/2022 |
CAT1 |
Oil and Grease Weekly Average limit is 40 mg/L and reported value was 57 mg/L at M-001E. |
All samplers will review and adhere to our sampling protocols to ensure future problems do not reoccur. |
Violation |
U |
eSMR |
1080916 |
09/01/2020 |
DMON |
Missed monitoring for the whole month of September. Parameters include: TSS, turbidity, pH, O&G, settleable solids, conductivity, |
A checklist has been created to ensure sample dates are not missed and personnel have received training on utilizing the checklist. |
Violation |
B |
eSMR |
1079963 |
03/07/2020 |
Deficient Reporting |
For the week of March 1, 2020, SOCWA only reported four out of the five required monitoring results for TSS, SS, pH, and CBOD for monitoring location M-001B. Note: SOCWA reported zero flow from monitoring location M-001B on March 5, 2020. |
|
Violation |
B |
Report |
1079959 |
02/22/2020 |
LREP |
Report was submitted on February 22, 2020, three days after the due date of February 19. |
|
Violation |
B |
Report |
1079957 |
02/03/2020 |
LREP |
Report was submitted on February 3, 2020, two days after the due date of February 1. |
|
Violation |
B |
Report |
1079958 |
02/03/2020 |
LREP |
Report was submitted on February 3, 2020, two days after the due date of February 1. |
|
Violation |
B |
Report |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|