Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
1139950 |
02/04/2025 |
SSOS |
Type: Category 1 Spill; Debris-wipes/Non-disposables caused 750 gallons of sewage to spill from Lateral Clean Out (Private) at 1552 Holman Road, Oakland Ca to Street/Curb and Gutter (2 3),Drainage Conveyance System that discharges to surface water |
Added Sewer to Preventive Maintenance Program,Post Spill CCTV. Sewer main was added to the three-month hydro high frequency program. W.O. 1579127. |
Violation |
A |
SSO |
1138712 |
12/30/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG),Root Intrusion caused 2325 gallons of sewage to spill from Lateral Clean Out (Private) at 606 Alma Ave, Oakland, CA to Drainage Conveyance System that discharges to surface water,Unpaved Surface,Paved Surface,Street/Curb and Gutter (2 3) |
Added Sewer to Preventive Maintenance Program,Inspected Sewer Using CCTV to Determine Cause. Sewer line was added to the six-month Power Rodder, and Hydro Flusher high frequency preventive maintenance. W.O. # 1582975, W.O. # 1546224 |
Violation |
A |
SSO |
1138770 |
12/29/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 15490 gallons of sewage to spill from Manhole at 5115 Saddlebrook Dr, Oakland, CA to Surface Water,Drainage Conveyance System that discharges to surface water,Street/Curb and Gutter (2 3) |
Inspected Sewer Using CCTV to Determine Cause,Adjusted Schedule/Method of Preventive Maintenance. Sewer line was adjusted to 3-month hydro high frequency preventative maintenance program. W.O. # 1527053. |
Violation |
A |
SSO |
1138588 |
12/24/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 597 gallons of sewage to spill from Manhole at 4437 Saint Andrews Rd, Oakland, CA to Street/Curb and Gutter (2 3),Drainage Conveyance System that discharges to surface water |
Added Sewer to Preventive Maintenance Program. Sewer was added to six-month preventative maintenance hydro cleaning program. W.O. 1583109. |
Violation |
A |
SSO |
1138593 |
12/24/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 5685 gallons of sewage to spill from Manhole at Moraga Ave. & La Salle Ave., Oakland Ca to Street/Curb and Gutter (2 3),Drainage Conveyance System that discharges to surface water |
Inspected Sewer Using CCTV to Determine Cause,Adjusted Schedule/Method of Preventive Maintenance. Line was adjusted to three-month hydro high frequency. W.O. 1545773 |
Violation |
A |
SSO |
1138582 |
12/19/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 800 gallons of sewage to spill from Manhole at 2960 Peralta Oaks, Oakland Ca to Drainage Conveyance System that discharges to surface water,Unpaved Surface |
Adjusted Schedule/Method of Preventive Maintenance,Inspected Sewer Using CCTV to Determine Cause. Line was adjusted from six months to three months high frequency preventive maintenance. W.O. 757115 |
Violation |
A |
SSO |
1137782 |
12/07/2024 |
SSOS |
Type: Category 1 Spill; Debris-Rags,Fats, Oil and Grease (FOG) caused 384 gallons of sewage to spill from Manhole at 46th Avenue & East 12th Street, Oakland Ca to Drainage Conveyance System,Street/Curb and Gutter (2 3) |
Added Sewer to Preventive Maintenance Program,Inspected Sewer Using CCTV to Determine Cause,Post Spill CCTV. CCTV inspection caused grease and rags to have been the cause of the overflow. |
Violation |
A |
SSO |
1137130 |
12/02/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 640 gallons of sewage to spill from Manhole at 110 Hiller Drive, Oakland Ca to Drainage Conveyance System that discharges to surface water,Street/Curb and Gutter (2 3),Paved Surface |
Adjusted Schedule/Method of Preventive Maintenance. Sewer main was adjusted to 3-month hydro high frequency maintenance program. W.O. # 1536250. |
Violation |
A |
SSO |
1136803 |
11/19/2024 |
SSOS |
Type: Category 1 Spill; Pipe Structural Problem/Failure - Controls caused 79 gallons of sewage to spill from Gravity Mainline at 23rd Avenue & East 27th Street, Oakland Ca to Drainage Conveyance System,Street/Curb and Gutter (2 3) |
Inspected Sewer Using CCTV to Determine Cause,Repaired Facilities or Replaced Defect,Post Spill CCTV. Sewer staff cleared blockage to restore flow; created work request to repair pipe defect. |
Violation |
A |
SSO |
1136567 |
11/16/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 477 gallons of sewage to spill from Lateral Clean Out (Private),Manhole at 6516 Moraga Avenue, Oakland Ca to Drainage Conveyance System that discharges to surface water,Street/Curb and Gutter (2 3) |
Inspected Sewer Using CCTV to Determine Cause,Added Sewer to Preventive Maintenance Program. Sewer main was added to 3-month hydro high frequency maintenance program. |
Violation |
A |
SSO |
1136566 |
11/13/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 2880 gallons of sewage to spill from Manhole at Mountain Blvd. & Moraga Avenue, Oakland Ca to Street/Curb and Gutter (2 3),Drainage Conveyance System that discharges to surface water |
Inspected Sewer Using CCTV to Determine Cause,Added Sewer to Preventive Maintenance Program. Sewer main was added the three-month hydro Maintenace program. W.O. #1545773. |
Violation |
A |
SSO |
1136565 |
11/11/2024 |
SSOS |
Type: Category 1 Spill; Damage by Others Not Related to Collection System Construction/Maintenance caused 9346 gallons of sewage to spill from Manhole at 755 Apple Street, Oakland Ca to Drainage Conveyance System |
Added Sewer to Preventive Maintenance Program,Inspected Sewer Using CCTV to Determine Cause. Mainline has been added to 6-month hydro high frequency maintenance program. |
Violation |
A |
SSO |
1135846 |
11/01/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 188 gallons of sewage to spill from Other Sewer System Structure,Manhole at 1200 Lakeshore Avenue, Oakland Ca to Drainage Conveyance System that discharges to surface water |
Inspected Sewer Using CCTV to Determine Cause,Added Sewer to Preventive Maintenance Program. Sewer main was added to the three-month high frequency hydro. W.O. 1543496 |
Violation |
A |
SSO |
1135713 |
11/01/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 5070 gallons of sewage to spill from Manhole at 1875 Tunnel Road, Oakland Ca to Drainage Conveyance System,Unpaved Surface,Street/Curb and Gutter (2 3) |
Inspected Sewer Using CCTV to Determine Cause,Added Sewer to Preventive Maintenance Program. Sewer main line was placed on six-month high frequency cleaning and inspection. |
Violation |
A |
SSO |
1134939 |
10/18/2024 |
SSOS |
Type: Category 1 Spill; Debris-wipes/Non-disposables caused 225 gallons of sewage to spill from Lateral Clean Out (Private) at 7120 Hawley Street, Oakland Ca to Drainage Conveyance System,Street/Curb and Gutter (2 3) |
Inspected Sewer Using CCTV to Determine Cause,Adjusted Schedule/Method of Preventive Maintenance. Line was adjusted to the three-month high frequency hydro program. W.O. 1567296 |
Violation |
A |
SSO |
1134518 |
10/01/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 479 gallons of sewage to spill from Lateral Clean Out (Private) at 12079 Broadway Terrace, Oakland Ca to Street/Curb and Gutter (2 3),Drainage Conveyance System,Building or Structure |
Post Spill CCTV,Inspected Sewer Using CCTV to Determine Cause,Added Sewer to Preventive Maintenance Program. Sewer line has been added to a six-month power rodder preventive maintenance program, W.O. # 1563715. Sewer line has been added to a six-month hydro preventive maintenance program, W.O. # 1563718.
Mainline has been CCTV inspected and found root intrusion to had been the potential cause of the overflow. W.O. # 1563869.
|
Violation |
A |
SSO |
1134470 |
09/29/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 300 gallons of sewage to spill from Lateral Clean Out (Private) at 12079 Broadway Terrace, Oakland Ca to Drainage Conveyance System |
Added Sewer to Preventive Maintenance Program,Inspected Sewer Using CCTV to Determine Cause. Line was added to six months power rod high frequency maintenance program, W.O. # 1563715. Line was added to six months hydro high frequency maintenance program, W.O. # 1563718. |
Violation |
A |
SSO |
1134415 |
09/28/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 219 gallons of sewage to spill from Other (specify below) at 4550 Heafey Road, Oakland Ca to Street/Curb and Gutter (2 3),Surface Water |
Added Sewer to Preventive Maintenance Program,Inspected Sewer Using CCTV to Determine Cause. CCTV inspection of the sewer line showed fats oils and grease to be the potential cause of the overflow. Main line has been placed on six-month high frequency hydro program. W.O. 1560927 |
Violation |
A |
SSO |
1131557 |
08/25/2024 |
SSOS |
Type: Category 1 Spill; Damage by Others Not Related to Collection System Construction/Maintenance caused 232 gallons of sewage to spill from Manhole at El Centro Ave. & Glendome Circle, Oakland Ca to Street/Curb and Gutter (2 3),Drainage Conveyance System |
Inspected Sewer Using CCTV to Determine Cause,Added Sewer to Preventive Maintenance Program. Staff added line to six-month hydro high frequency. CCTV inspection was completed on 8/26/24. |
Violation |
U |
SSO |
1131237 |
08/19/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG),Debris-Rags caused 238 gallons of sewage to spill from Manhole at East 8th Street & Park Way, Oakland Ca to Drainage Conveyance System,Street/Curb and Gutter (2 3) |
Inspected Sewer Using CCTV to Determine Cause,Added Sewer to Preventive Maintenance Program. Mainline has added to six-month high frequency maintenance program. WO # 1551843. |
Violation |
U |
SSO |
1134216 |
08/08/2024 |
SSOS |
Type: Category 1 Spill; Vandalism (specify below) caused 9180 gallons of sewage to spill from Manhole at 265 Elysian Fields, Oakland Ca to Surface Water, Unpaved Surface |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Added to six-month hydro preventive maintenance program. # 1512664 |
Violation |
A |
SSO |
1134208 |
06/18/2024 |
SSOS |
Type: Category 1 Spill; Pipe Structural Problem/Failure - Installation caused 120 gallons of sewage to spill from Other Sewer System Structure at 6800 Gunn Drive, Oakland Ca to Paved Surface, Street/Curb and Gutter (2 3), Surface Water |
Adjusted Schedule/Method of Preventive Maintenance, Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer, Repaired Facilities or Replaced Defect. Sewer line was temporarily repaired for now, W.O. 1534264. Line was placed CIP, W.O 1474878. Adjusted high frequency maintenance program to three months hydro, W.O. 1474300. |
Violation |
A |
SSO |
1134205 |
05/31/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 655 gallons of sewage to spill from Inside Building or Structure, Manhole at 311 Oak Street, Oakland Ca to Building or Structure, Surface Water |
Adjusted Schedule/Method of Preventive Maintenance. Adjusted to 3-month hydro high frequency maintenance program. WO. #1511933. |
Violation |
A |
SSO |
1134201 |
05/05/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 1720 gallons of sewage to spill from Other Sewer System Structure at 5758 Romany Road, Oakland Ca to Drainage Conveyance System, Other (specify below) |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Sewer line was added to the six-month high frequency maintenance program. |
Violation |
A |
SSO |
1134200 |
05/04/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 810 gallons of sewage to spill from Lateral Clean Out (Private) at 463 63rd Street, Oakland Ca to Drainage Conveyance System that discharges to surface water |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Sewer line was added to High frequency maintenance program. |
Violation |
A |
SSO |
1134196 |
04/11/2024 |
SSOS |
Type: Category 1 Spill; Debris from Construction caused 575 gallons of sewage to spill from Manhole at 500 Westfield Way, Oakland Ca to Drainage Conveyance System that discharges to surface water, Paved Surface |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Sewer line was added to six-month high frequency program. W.O. 1458119. |
Violation |
A |
SSO |
1134195 |
04/06/2024 |
SSOS |
Type: Category 1 Spill; Debris from Construction caused 169 gallons of sewage to spill from Lateral Clean Out (Private) at 1 Westview Place, Oakland Ca to Drainage Conveyance System |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Sewer main was to six-month high frequency program. W. O. 1516547. |
Violation |
A |
SSO |
1134191 |
03/15/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 900 gallons of sewage to spill from Lateral Clean Out (Private) at 4521 San Carlos Avenue, Oakland Ca to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Unpaved Surface |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Mainline has been added to six-month high frequence maintenance program. Work # 1511191. |
Violation |
A |
SSO |
1134189 |
03/07/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below), Root Intrusion caused 7815 gallons of sewage to spill from Inside Building or Structure at 6000 Rockridge Blvd., Oakland Ca to Drainage Conveyance System that discharges to surface water, Paved Surface, Unpaved Surface |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Sewer line was added to a six-month high frequency preventive maintenance program. Work #1509280 |
Violation |
A |
SSO |
1134188 |
03/05/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 260 gallons of sewage to spill from Other (specify below) at Monan Street & Ziegler Avenue, Oakland Ca to Drainage Conveyance System, Paved Surface |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Line was added to six-month hydro high frequency maintenance program. # 1508983. |
Violation |
A |
SSO |
1134187 |
03/04/2024 |
SSOS |
Type: Category 1 Spill; Damage by Others Not Related to Collection System Construction/Maintenance caused 1200 gallons of sewage to spill from Other (specify below) at 4450 Ziegler Avenue, Oakland Ca to Drainage Conveyance System that discharges to surface water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause. Due to cause of the spill, there was no need to place line on a high frequency schedule. Rock gravel and dirt entered the line through the lamp hole when construction was performed. |
Violation |
A |
SSO |
1134182 |
02/16/2024 |
SSOS |
Type: Category 1 Spill; Pipe Structural Problem/Failure - Installation caused 697 gallons of sewage to spill from Other (specify below) at 6336 Buena Ventura Avenue, Oakland Ca to Drainage Conveyance System that discharges to surface water, Street/Curb and Gutter (2 3), Unpaved Surface |
Plan Rehabilitation or Replacement of Sewer. Construction work order #1504012 was created to repair the lamp hole. |
Violation |
A |
SSO |
1134181 |
02/15/2024 |
SSOS |
Type: Category 1 Spill; Debris-General, Fats, Oil and Grease (FOG) caused 684 gallons of sewage to spill from Manhole at 1200 Lakeshore Avenue, Oakland Ca to Surface Water |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. High level flow monitor will be installed. Sewer line was placed on three-month hydro high frequency. |
Violation |
A |
SSO |
1134180 |
02/08/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 5345 gallons of sewage to spill from Manhole at 20 Binnacle Hill, Oakland Ca to Drainage Conveyance System that discharges to surface water |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Main line was added to six-month high preventive maintenance plan. |
Violation |
A |
SSO |
1134185 |
02/07/2024 |
SSOS |
Type: Category 1 Spill; Natural Disaster (specify below) caused 1880 gallons of sewage to spill from Gravity Mainline at 2627 Nicol Avenue, Oakland Ca to Surface Water |
Plan Rehabilitation or Replacement of Sewer. Plan rehabilitation or replacement of sewer. |
Violation |
A |
SSO |
1134179 |
02/02/2024 |
SSOS |
Type: Category 1 Spill; Debris-wipes/Non-disposables, Fats, Oil and Grease (FOG) caused 480 gallons of sewage to spill from Other (specify below) at 7867 Bancroft Ave. to Drainage Conveyance System, Street/Curb and Gutter (2 3), Unpaved Surface |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Sewer line was added to the six-month hydro high frequency maintenance program. WO # 1499334. |
Violation |
A |
SSO |
1134176 |
01/21/2024 |
SSOS |
Type: Category 1 Spill; Debris from Construction caused 393 gallons of sewage to spill from Manhole at 4058 Edwards Avenue, Oakland Ca to Drainage Conveyance System that discharges to surface water |
Added Sewer to Preventive Maintenance Program. Line was placed on six-month hydro maintenance program. |
Violation |
A |
SSO |
1134175 |
01/21/2024 |
SSOS |
Type: Category 1 Spill; Debris-Rags caused 30296 gallons of sewage to spill from Lateral Clean Out (Private), Manhole at 1527 80th avenue, Oakland Ca to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3) |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Segment of pip was placed on sewer preventive maintenance program. |
Violation |
A |
SSO |
1134173 |
01/17/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 300 gallons of sewage to spill from Other (specify below) at 1232 33rd. Avenue, Oakland Ca to Other (specify below), Street/Curb and Gutter (2 3) |
Added Sewer to Preventive Maintenance Program. Line was placed on hydro six-month frequency program. |
Violation |
A |
SSO |
1134172 |
01/16/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 750 gallons of sewage to spill from Manhole at 8000 Birch Street, Oakland Ca to Paved Surface, Surface Water |
Added Sewer to Preventive Maintenance Program. Line was placed on sewer preventive maintenance program. |
Violation |
A |
SSO |
1134174 |
01/16/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 4840 gallons of sewage to spill from Other (specify below) at 1 West View Place, Oakland Ca to Surface Water |
Plan Rehabilitation or Replacement of Sewer. Line was placed on the capital improvement project list. Work Order# 1494227 |
Violation |
A |
SSO |
1134171 |
01/14/2024 |
SSOS |
Type: Category 1 Spill; Debris-wipes/Non-disposables, Other (specify below) caused 1625 gallons of sewage to spill from Other (specify below) at 1107 89th Avenue, Oakland Ca to Other (specify below), Surface Water |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Staff wrote up five spot repairs and placed line on capital improvement project list. Work order # 1494744. |
Violation |
A |
SSO |
1134168 |
01/02/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 900 gallons of sewage to spill from Other (specify below) at 2906 Carmel st to Drainage Conveyance System, Street/Curb and Gutter (2 3) |
Other (specify below). Spill occurred from stormwater collection system. |
Violation |
A |
SSO |
1134167 |
01/02/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 784 gallons of sewage to spill from Manhole at 3500 Mountain Blvd to Drainage Conveyance System, Paved Surface, Unpaved Surface |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Line was added to the sewer preventive maintenance program. |
Violation |
A |
SSO |
1134165 |
12/25/2023 |
SSOS |
Type: Category 1 Spill; Debris-Rags, Debris-wipes/Non-disposables caused 821 gallons of sewage to spill from Manhole at 6690 Bancroft Ave. Oakland Ca to Street/Curb and Gutter (2 3), Surface Water |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Line was paced on our preventative maintenance schedule. |
Violation |
A |
SSO |
1134162 |
11/29/2023 |
SSOS |
Type: Category 1 Spill; Debris-wipes/Non-disposables, Fats, Oil and Grease (FOG) caused 3159 gallons of sewage to spill from Other Sewer System Structure at 1020 51st. Avenue, Oakland Ca to Building or Structure, Drainage Conveyance System that discharges to surface water, Paved Surface |
Added Sewer to Preventive Maintenance Program. Line was placed on six-month high frequency program. |
Violation |
A |
SSO |
1134157 |
11/15/2023 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 1350 gallons of sewage to spill from Manhole at 4100 Redwood Road, Oakland Ca to Drainage Conveyance System that discharges to surface water, Paved Surface |
Added Sewer to Preventive Maintenance Program. Line has been placed on a six-month high preventative maintenance program. |
Violation |
A |
SSO |
1134158 |
11/15/2023 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 2250 gallons of sewage to spill from Manhole at Broadway & Clifton St, Oakland CA to Drainage Conveyance System that discharges to surface water |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Main line has been added to six-month preventative maintenance program. |
Violation |
A |
SSO |
1134156 |
11/04/2023 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 21600 gallons of sewage to spill from Manhole at 3514 Butters Drive, Oakland Ca to Other (specify below) |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Sewer manhole was placed on six-month high frequency cleaning. |
Violation |
A |
SSO |
1134155 |
11/01/2023 |
SSOS |
Type: Category 1 Spill; Pipe Structural Problem/Failure - Installation caused 15150 gallons of sewage to spill from Manhole at 6800 Gunn Drive, Oakland Ca to Drainage Conveyance System, Paved Surface |
Added Sewer to Preventive Maintenance Program, Plan Rehabilitation or Replacement of Sewer. CIP was requested to rehab main sewer line. |
Violation |
A |
SSO |
1134151 |
10/28/2023 |
SSOS |
Type: Category 1 Spill; Damage by Others Not Related to Collection System Construction/Maintenance caused 635 gallons of sewage to spill from Other (specify below) at Escher drive & Westover Drive, Oakland Ca to Drainage Conveyance System that discharges to surface water |
Repaired Facilities or Replaced Defect. A construction work order was created to reset the Lamp-Hole casting and cover. |
Violation |
A |
SSO |
1134149 |
10/19/2023 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 358 gallons of sewage to spill from Lateral Clean Out (Private) at 50 Hiller Drive, Oakland Ca to Surface Water |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Dig tag work order #1470583 has been created to repair the sewer main. |
Violation |
A |
SSO |
1134148 |
10/18/2023 |
SSOS |
Type: Category 1 Spill; Debris from Construction caused 1564 gallons of sewage to spill from Manhole at 51st Avenue & Foothill Blvd, Oaklan Ca to Drainage Conveyance System |
Inspected Sewer Using CCTV to Determine Cause. N/A. We don't know if the cause was done by vandalism. |
Violation |
A |
SSO |
1134142 |
09/23/2023 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG), Root Intrusion caused 3472 gallons of sewage to spill from Inside Building or Structure, Lateral Clean Out (Private) at 287 Elysean Fields Drive, Oakland, Ca to Building or Structure, Street/Curb and Gutter (2 3), Surface Water |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Sewer line will be placed on a six-month high frequency cleaning routine.
Work Order # 1464156. Work order # 1464166 for root removal and inspection every six months. |
Violation |
A |
SSO |
1134138 |
09/01/2023 |
SSOS |
Type: Category 1 Spill; Debris-General, Fats, Oil and Grease (FOG), Root Intrusion caused 677 gallons of sewage to spill from Lateral Clean Out (Private), Manhole at 4800 East 12th Street, Oakland Ca 94609 to Drainage Conveyance System that discharges to surface water |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Line has been placed on schedule to mechanically cleaned. |
Violation |
A |
SSO |
1134137 |
08/18/2023 |
SSOS |
Type: Category 1 Spill; Vandalism (specify below) caused 23400 gallons of sewage to spill from Lateral Clean Out (Private) at 3775 Alameda Avenue to Drainage Conveyance System that discharges to surface water |
Added Sewer to Preventive Maintenance Program. Main failure was not the cause of the overflow. Vandalism was the cause.
Line will be placed on a six-month high frequency cleaning. |
Violation |
A |
SSO |
1134135 |
08/15/2023 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 1100 gallons of sewage to spill from Other (specify below) at 1542 96th Avenue to Drainage Conveyance System, Street/Curb and Gutter (2 3) |
Adjusted Schedule/Method of Preventive Maintenance. High frequency hydro flush maintenance is changed from six-month routine to three-month routine. |
Violation |
A |
SSO |
1134127 |
06/25/2023 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 2925 gallons of sewage to spill from Lateral Clean Out (Public) at 42nd ave & Foothill blvd to Drainage Conveyance System that discharges to surface water, Street/Curb and Gutter (2 3), Surface Water |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. Line will be placed on a three-month high frequency program; line will also be televised for further obstructions or abnormalities in the sewer main. |
Violation |
A |
SSO |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|