1140075 |
10/30/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 8460 gallons of sewage to spill from Force Main at SB Airport Abandon ARV Adaptor to Drainage Conveyance System |
Repaired Facilities or Replaced Defect,Other (specify below). See Attachment Response for Response #10 and Update Response. |
Violation |
B |
SSO |
1140812 |
10/30/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 8460 gallons of sewage to spill from Force Main at SB Airport Abandon ARV Adaptor to Drainage Conveyance System |
Other (specify below),Repaired Facilities or Replaced Defect. See Attachment Response for Response #10 and Update Response. |
Violation |
B |
SSO |
1135965 |
10/30/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 8460 gallons of sewage to spill from Force Main at SB Airport Abandon ARV Adaptor to Drainage Conveyance System but not surface waters. |
Discharger collected and estimated 6,000 gallons during spill response immediately following discovery, and on 11/20 and 11/22/24 secured clearance from Santa Barbara Airport to return and collect another estimated 3,000 gallons that had backed up into the stormwater conveyance. Repaired Facilities or Replaced Defect,Other (specify below). See Attachment Response for Response #10 |
Violation |
B |
SSO |
1124851 |
02/17/2024 |
SSOS |
Sewage discharge of approximately 1,022,500 gallons to waters of the United States |
Discharger properly responded and reported the SSO. Discharger submitted required 45-Day Technical Report on 4/2/24. |
Violation |
A |
Report |
1133534 |
02/16/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 1140657 gallons of sewage to spill from Force Main at Airport Force Main 24 to Drainage Conveyance System that discharges to surface water |
Repaired Facilities or Replaced Defect. See attachment to #10.
In addition to details in attachment to #10, District has completed updates to its force main recommissioning SOP, received training on its updated SERP, set up temporary inflow monitoring and updated its integration of GSD’s flow data with the District’s SCADA, updated its contingency plan, replaced coupling bolts to reduce any other potential failure point, pressure tested the 24” line prior to recommissioning with engineers, and recommissioned the line successfully on 5/1. District retained additional compliance support over next several months to ensure highest standard of operations. More corrective action details in 4/2 Technical Report and 5/17 Update to Technical Report. |
Violation |
A |
SSO |