| 1149071 |
10/20/2025 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 4089 gallons of sewage to spill from Force Main at Parker Pump Station to Drainage Conveyance System that discharges to surface water,Unpaved Surface |
Plan Rehabilitation or Replacement of Sewer,Repaired Facilities or Replaced Defect. Site under construction, expected to be completed within the next 3-4 months. A new section of force main will replace the repaired section. |
Violation |
A |
SSO |
| 1148467 |
10/20/2025 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 6636 gallons of sewage to spill from Force Main at Parker Pump Station to Drainage Conveyance System that discharges to surface water,Unpaved Surface |
Repaired Facilities or Replaced Defect,Plan Rehabilitation or Replacement of Sewer. Site under construction, expected to be completed within the next 3-4 months. A new section of force main will replace the repaired section. |
Violation |
A |
SSO |
| 1144718 |
07/08/2025 |
LREP |
Category 1 Draft Spill Report due 7/7/2025. Notification of late report sent 7/8/2025. Report uploaded 7/9/2025. |
|
Violation |
B |
Report |
| 1144837 |
07/01/2025 |
SSOS |
Type: Category 1 Spill; Air Relief Valve (ARV)/ Blow-Off Valve (BOV) Failure caused 1273 gallons of sewage to spill from Other Sewer System Structure at Cays Main Pump Station Air Release Valve to Street/Curb and Gutter (2 3),Drainage Conveyance System that discharges to surface water |
Plan Rehabilitation or Replacement of Sewer. Valve replacement added to an existing CIP, currently in design. |
Violation |
A |
SSO |
| 1134038 |
02/07/2024 |
SSOS |
Type: Category 1 Spill; Flow Exceeded Capacity (Separate Collection System Only), Other (specify below) caused 15300 gallons of sewage to spill from Force Main, Manhole at Embarcadero North Park to Paved Surface, Surface Water, Unpaved Surface |
Other (specify below). Defer to City of San Diego for their operating system repair schedule.
City of Coronado, San Diego and Port District met several time to improve notification and response coordination. Future meeting dates are pending. |
Violation |
A |
SSO |
| 1150080 |
02/07/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below),Flow Exceeded Capacity (Separate Collection System Only) caused 38250 gallons of sewage to spill from Manhole,Force Main at Embarcadero North Park to Unpaved Surface,Surface Water,Paved Surface |
Other (specify below). Defer to City of San Diego for their operating system repair schedule.
City of Coronado, San Diego and Port District met several time to improve notification and response coordination. Future meeting dates are pending. |
Violation |
A |
SSO |
| 1134037 |
02/06/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 170898 gallons of sewage to spill from Force Main, Manhole at Embarcadero North Park to Drainage Conveyance System that discharges to surface water, Paved Surface, Surface Water, Unpaved Surface |
Other (specify below). Defer to the City of San Diego for pump station 2 repair schedule. Spill notification and response coordination meetings occured with San Diego and Port District. Commitment to revisit discussions to maintain open communication channels. See Technical Report. |
Violation |
A |
SSO |
| 1150081 |
02/06/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 589305 gallons of sewage to spill from Force Main,Manhole at Embarcadero North Park to Paved Surface,Surface Water,Unpaved Surface,Drainage Conveyance System that discharges to surface water |
Other (specify below). Defer to the City of San Diego for pump station 2 repair schedule. Spill notification and response coordination meetings occured with San Diego and Port District. Commitment to revisit discussions to maintain open communication channels. See Technical Report. |
Violation |
A |
SSO |
| 1134036 |
01/22/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only), Surcharged Pipe (Combined Collection System Only) caused 147200 gallons of sewage to spill from Manhole, Other (specify below) at Country Club Area to Drainage Conveyance System, Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water |
Other (specify below), Plan Rehabilitation or Replacement of Sewer, Repaired Facilities or Replaced Defect. The sewer wetwell manhole lid was bolted down with an additional cross bar and will remain until the new station is in use - approximately mid-2025. |
Violation |
A |
SSO |
| 1150083 |
01/22/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only),Surcharged Pipe (Combined Collection System Only) caused 4252047 gallons of sewage to spill from Manhole,Other (specify below) at Country Club Area to Street/Curb and Gutter (2 3),Drainage Conveyance System,Surface Water,Drainage Conveyance System that discharges to surface water,Paved Surface |
Repaired Facilities or Replaced Defect,Other (specify below),Plan Rehabilitation or Replacement of Sewer. The sewer wetwell manhole lid was bolted down with an additional cross bar and will remain until the new station is in use - approximately mid-2025. |
Violation |
A |
SSO |
| 1150082 |
01/22/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 1227585 gallons of sewage to spill from Force Main,Manhole at Embarcadero Park to Unpaved Surface,Drainage Conveyance System that discharges to surface water,Street/Curb and Gutter (2 3),Surface Water,Paved Surface |
Other (specify below). Defer to City of San Diego for station 2 repair scheudle. Spill notificationa nd response coordination meetings occured with San Diego and Port District. Commitment to maintain open communication and continually update response coordiantion and contact lists. |
Violation |
A |
SSO |
| 1134035 |
01/22/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 380551 gallons of sewage to spill from Force Main, Manhole at Embarcadero Park to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Other (specify below). Defer to City of San Diego for station 2 repair scheudle. Spill notificationa nd response coordination meetings occured with San Diego and Port District. Commitment to maintain open communication and continually update response coordiantion and contact lists. |
Violation |
A |
SSO |
|