Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID 631179
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
7 631179 Calipatria Municipal CS Collection_System 106 Lindsey Calipatria, CA, 92233 Imperial

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
549244 Person Raul Bernal Is Onsite Manager For 08/20/2015
82173 Person Ruben E Mireles Is Onsite Manager For 10/25/2010 01/21/2020
354885 Person Romualdo Medina Is Onsite Manager For 12/12/2006 01/10/2025
7483 Organization Calipatria City Owner City Agency 04/04/2006
Total Related Parties: 4

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
300422 Enrollee 7 SSOMUNISML 2022-0103-DWQ 7SSO10516 11/22/2006 Active N
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
1158062 07/27/2026 SSOS Type: Category 1 Spill; Damage by Others Not Related to Collection System Construction/Maintenance caused 800 gallons of sewage to spill from Force Main at Calipatria, CA. Corner of English Rd and Lindsey Rd. to Drainage Conveyance System that discharges to surface water Repaired Facilities or Replaced Defect. Two 10-in mechanical joint couplings were installed to control/eliminate the leak from the PVC pipe. A small section of new PVC pipe was installed between the mechanical couplings. After the repair, the force main was pressurized to test and observe any potential leak. No leaks were observed. A better coordination between the IID/contractors and the City of Calipatria PWD was emphasized. The information of the exact location of the force main is a priority factor before start digging. Violation A SSO
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 1 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
SSOS = Sanitary Sewer Overflow/Spill/

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
378409 Notice of Violation 07/20/2010 Historical
Total Enf Actions: 1

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
10386536 Complaint inspection Jose Cortez 11/07/2012 N 0 [Attachments]
Total Inspections: 1 Last Inspection: 11/07/2012
  
The current report was generated with data as of: 09/10/2026
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page