| Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
| 1152573 |
03/11/2026 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 40 gallons of sewage to spill from Manhole at 2728 Hartnell to Surface Water,Paved Surface,Unpaved Surface |
Post Spill CCTV. CCTV viewing did not lead to the discovery of notable pipe defects. In addition, the wastewater utility performed post spill jetting of the pipe to ensure no road base was remaining within system. This event was due to an unusual circumstance. |
Violation |
A |
SSO |
| 1150209 |
12/22/2025 |
SSOS |
Type: Category 1 Spill; Natural Disaster (specify below) caused 315 gallons of sewage to spill from Gravity Mainline at Puma Trail to Surface Water |
Other (specify below). Temporary repairs have been completed. Permanent repairs are scheduled to be performed prior to June 30. Visual inspection of this sewer segment will be performed after significant rain events. |
Violation |
A |
SSO |
| 1150206 |
12/21/2025 |
SSOS |
Type: Category 1 Spill; Natural Disaster (specify below) caused 17281 gallons of sewage to spill from Manhole at East Cypress to Street/Curb and Gutter (2 3),Drainage Conveyance System that discharges to surface water,Paved Surface |
Other (specify below). Schedule a serious of smoke tests to eliminate sources of inflow. |
Violation |
A |
SSO |
| 1150228 |
12/21/2025 |
SSOS |
Type: Category 1 Spill; Natural Disaster (specify below) caused 25055 gallons of sewage to spill from Manhole at Irwin to Street/Curb and Gutter (2 3),Drainage Conveyance System that discharges to surface water,Paved Surface |
Other (specify below),Repaired Facilities or Replaced Defect. Schedule a serious of smoke tests to eliminate sources of inflow. |
Violation |
A |
SSO |
| 1150205 |
12/21/2025 |
SSOS |
Type: Category 1 Spill; Natural Disaster (specify below) caused 25055 gallons of sewage to spill from Manhole at Irwin to Street/Curb and Gutter (2 3),Paved Surface,Drainage Conveyance System that discharges to surface water |
Other (specify below),Repaired Facilities or Replaced Defect. Schedule a serious of smoke tests to eliminate sources of inflow. |
Violation |
A |
SSO |
| 1133262 |
02/04/2024 |
UAUTHDISC |
Type: Category 1 Spill; Pump Station Failure - Controls, Pump Station Failure - Mechanical, Pump Station Failure - Power caused 859494 gallons of sewage to spill from Other Sewer System Structure at Clear Creek Wastewater Treatment Plant to Other (specify below) |
Adjusted Schedule/Method of Preventive Maintenance, Other (specify below). Install level sensor in influent structure to identify high level independently of wet well level, as an extra back-up. This sensor will be used as the override to start the "E-Run" process. |
Violation |
A |
SSO |
| 1110843 |
11/30/2022 |
SSOS |
Type: Category 1. Damage by Others Not Related to CS Construction/Maintenance (Specify Below);The spill was caused by damage to the sewer pipe by vandals, most likely from the nearby homeless encampments. The sewer pipe was broken by being beat with a blunt object from above. caused 1500.0 gallons of sewage to spill from Gravity Mainline;The spill originated from a section of pipe that was damaged by vandals who broke the pipe open using a blunt object, such as rock or hammer. at 888 Blackstone Ct. to Drainage Channel;The spill entered Sulfur Creek from the broken pipe. It was impeded by a rock pile which acted as a dam. From there flow entered a concrete tunnel under the train tracks. Once out of the tunnel the flow entered a vegetated channel flowing south before the channel ran dry.. Surface water body affected (Sacramento River). |
Cleaned-Up;Mitigated Effects of Spill;Contained all or portion of spill;Restored flow;Returned Portion of Spill to Sanitary Sewer System;Other Enforcement Agency Notified. ;The spill response included repairing the broken section of pipe. Laying temporary bags of cement over the exposed area. Pumping contaminated water back into the collections system. Sampling. Posting signs for public safety. Notifying regulators and agencies to ensure public safety. |
Violation |
B |
SSO |
| 1103640 |
04/28/2022 |
SSOS |
Type: Category 1. Debris from Construction;A 6 inch ball of concrete was discovered via closed circuit TV inspection in the 6 inch sewer line between manhole K9-12 and K9-15. The concrete is believed to have entered the system near Maraglia St. where a paving and manhole improvement project has been recently completed. caused 300.0 gallons of sewage to spill from Manhole;Spill appeared from Manhole K9-48 at 2731 Bechelli Lane to Drainage Channel;The final destination of the spill was storm drain outfall 2967 (Redding GIS) which discharges into Henderson ditch. The outfall is a 48 inch pipe. There was a wood stump and queen size mattress lodged in the outfall which dammed a mojority of the flow.. Surface water body affected (Henderson ditch to Sacramento River). |
Cleaned-Up;Mitigated Effects of Spill;Contained all or portion of spill;Restored flow;Returned Portion of Spill to Sanitary Sewer System;Other Enforcement Agency Notified. ;In response to the spill City of Redding used sandbags and waddles to dam the ditch near Outfall 2967. From the spill appearance, staff cleaned the street and gutter, flushed the storm drain to a storm drain vault on the west side of Bechelli Lane where it was collected using a Vac-Con truck. Then using a pump staff collected all the contaminated water and rinsed the area within the Henderson ditch. To complete this the wood stump and mattress had to be winched out of the ditch. |
Violation |
B |
SSO |
|
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|