| Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
| 1142224 |
03/14/2025 |
SSOS |
Type: Category 1 Spill; Other (specify below),Pipe Structural Problem/Failure - Controls caused 4691 gallons of sewage to spill from Manhole at Jewell and Eucalyptus Intersection to Surface Water |
Other (specify below),Plan Rehabilitation or Replacement of Sewer,Inspected Sewer Using CCTV to Determine Cause. Currently talking to contractors for quotes to replace the pipe with the void |
Violation |
B |
SSO |
| 1141618 |
03/14/2025 |
SSOS |
Type: Category 1 Spill; Other (specify below),Pipe Structural Problem/Failure - Controls caused 4965 gallons of sewage to spill from Manhole at Jewell and Eucalyptus Intersection to Surface Water |
Inspected Sewer Using CCTV to Determine Cause,Other (specify below),Plan Rehabilitation or Replacement of Sewer. Currently talking to contractors for quotes to replace the pipe with the void |
Violation |
B |
SSO |
| 1140115 |
02/03/2025 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 125 gallons of sewage to spill from Other Sewer System Structure at 20 Lockwood to Surface Water |
Post Spill CCTV,Plan Rehabilitation or Replacement of Sewer,Adjusted Schedule/Method of Preventive Maintenance. post spill cctv pinpointed joint where roots were entering. adjusted preventive maintenance schedule for more frequent cleaning until we can get this spot repaired |
Violation |
B |
SSO |
| 1140039 |
01/31/2025 |
SSOS |
Type: Category 1 Spill; Damage by Others Not Related to Collection System Construction/Maintenance caused 2240 gallons of sewage to spill from Gravity Mainline,Other (specify below) at 115 Main Dr to Other (specify below),Drainage Conveyance System that discharges to surface water |
Plan Rehabilitation or Replacement of Sewer,Inspected Sewer Using CCTV to Determine Cause,Post Spill CCTV,Repaired Facilities or Replaced Defect. Once cracked pipe was identified and located, our crews set up our Vactor at the manhole upstream and removing water so it did not continue to the cracked pipe. Crews proceed to repair the cracked section to prevent further spillage. |
Violation |
B |
SSO |
| 1139613 |
01/27/2025 |
SSOS |
Type: Category 1 Spill; Debris from Construction caused 59 gallons of sewage to spill from Other (specify below) at 820 Mission to Surface Water |
Added Sewer to Preventive Maintenance Program,Inspected Sewer Using CCTV to Determine Cause,Other (specify below). plan to replace main and lower laterals with an ongoing CIP project within the next four months. in the meantime, the pipe has been added to preventive maintenance program to see if rock is still entering through lateral |
Violation |
B |
SSO |
| 1134445 |
09/26/2024 |
SSOS |
Type: Category 1 Spill; Debris from Lateral,Debris-Rags,Debris-wipes/Non-disposables caused 397 gallons of sewage to spill from Lateral Clean Out (Private) at 411 4th St. to Drainage Conveyance System that discharges to surface water,Street/Curb and Gutter (2 3) |
Plan Rehabilitation or Replacement of Sewer,Adjusted Schedule/Method of Preventive Maintenance,Post Spill CCTV. Line will be added to more frequent cleaning schedule and currently working on plans to have line replaced. |
Violation |
B |
SSO |
| 1133559 |
05/12/2024 |
SSOS |
Type: Category 1 Spill; Pipe Structural Problem/Failure - Installation caused 2879 gallons of sewage to spill from Other (specify below) at 271 Clorinda to Surface Water |
Repaired Facilities or Replaced Defect. The following day 5/14/2024 we had a contractor excavate over the collapsed pipe and complete a temporary repair. The following week they came back and installed a manhole over blind tie. |
Violation |
B |
SSO |
| 1133557 |
03/14/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 135 gallons of sewage to spill from Other Sewer System Structure at 232 Miramar to Drainage Conveyance System that discharges to surface water |
Adjusted Schedule/Method of Preventive Maintenance, Plan Rehabilitation or Replacement of Sewer. The gravity system in this area has been in design for the past few years and have been held up with new easements. We have finally completed this and the project is out to bid. We hope to have this gravity system replaced by summer. In the meantime we adjusted the cleaning schedule to have that pipe run every other week. |
Violation |
B |
SSO |
| 1133556 |
01/25/2024 |
SSOS |
Type: Category 1 Spill; Debris-General caused 282 gallons of sewage to spill from Lateral Clean Out (Private) at 119 Center to Drainage Conveyance System that discharges to surface water |
Added Sewer to Preventive Maintenance Program. The pipe segment was recently rehabilitated by pipe bursting method. Until we can determine where the rock originated this pipe will be added to our preventative maintenance cleaning schedule. We will clean this pipe with the hydroflusher every 6 months. |
Violation |
B |
SSO |
| 1133555 |
11/29/2023 |
SSOS |
Type: Category 1 Spill; Debris-Rags, Fats, Oil and Grease (FOG) caused 250 gallons of sewage to spill from Manhole at 249 Mountain View to Surface Water |
Added Sewer to Preventive Maintenance Program. Added the downstream segment of pipe where blockage occurred to the preventative maintenance cleaning list where it will be cleaned every 6 months |
Violation |
B |
SSO |
| 1133554 |
11/17/2023 |
SSOS |
Type: Category 1 Spill; Debris-Rags, Fats, Oil and Grease (FOG), Pipe Structural Problem/Failure - Installation caused 505 gallons of sewage to spill from Inside Building or Structure, Lateral Clean Out (Private) at 902 3rd St. to Surface Water |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. ongoing talks with contractor |
Violation |
B |
SSO |
| 1133552 |
07/13/2023 |
SSOS |
Type: Category 1 Spill; Damage by Others Not Related to Collection System Construction/Maintenance caused 7 gallons of sewage to spill from Lateral Clean Out (Private) at 2261 5th to Drainage Conveyance System that discharges to surface water |
Repaired Facilities or Replaced Defect. Located damaged pipe through cctv and directed contractor to excavate that area. Once damage was found our inspector documented and the contractor repaired it |
Violation |
B |
SSO |
|