1140357 |
02/04/2025 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 1650 gallons of sewage to spill from Manhole at Petaluma Blvd. South to Drainage Conveyance System that discharges to surface water |
Post Spill CCTV,Adjusted Schedule/Method of Preventive Maintenance. Staff inspected pipeline in case of obstruction Discussed with pump station operators on possible adjustments to set points. |
Violation |
A |
SSO |
1140358 |
02/04/2025 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 23950 gallons of sewage to spill from Manhole at Intersection of Jefferson St. & Payran St. to Drainage Conveyance System that discharges to surface water |
Plan Rehabilitation or Replacement of Sewer,Inspected Sewer Using CCTV to Determine Cause,Other (specify below). The pipeline downstream of the spill is set for replacment and capacity increase. Also, staff coordinated with pump station operators to adjust set points during rainfall events. |
Violation |
A |
SSO |
1138306 |
12/14/2024 |
SSOS |
Type: Category 1 Spill; Flow Exceeded Capacity (Separate Collection System Only),Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 12500 gallons of sewage to spill from Manhole at Intersection of Payran St and Jefferson St. to Surface Water,Drainage Conveyance System that discharges to surface water,Paved Surface |
Adjusted Schedule/Method of Preventive Maintenance,Plan Rehabilitation or Replacement of Sewer. Priority replacement and upsizing of sewer main at lift station discharge. This should be completed before end of winter. Staff has adjusted pump discharge rate and has added location to patrolling during storm events. Also, management is adjusting spill response plan to make it easier to follow. |
Violation |
A |
SSO |
1133220 |
02/04/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 8150 gallons of sewage to spill from Manhole at D St at Brows Ct to Drainage Conveyance System, Street/Curb and Gutter (2 3), Surface Water |
Plan Rehabilitation or Replacement of Sewer. Sewer replacement budgeted for 2025 |
Violation |
A |
SSO |
1133219 |
02/04/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 47550 gallons of sewage to spill from Manhole at 801 Petaluma Blvd. South to Drainage Conveyance System that discharges to surface water, Street/Curb and Gutter (2 3), Surface Water |
Other (specify below). Ongoing sewer rehab/replacement in the area. |
Violation |
A |
SSO |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|