1137685 |
12/02/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 336 gallons of sewage to spill from Lateral Clean Out (Public) at 352663 to Street/Curb and Gutter (2 3),Surface Water,Drainage Conveyance System that discharges to surface water,Paved Surface |
Inspected Sewer Using CCTV to Determine Cause,Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral with CCTV on December 4, 2024. Based on the findings, SacSewer will repair the lower lateral. |
Violation |
A |
SSO |
1137146 |
11/25/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 95 gallons of sewage to spill from Lateral Clean Out (Public) at 352361 to Surface Water,Unpaved Surface,Drainage Conveyance System that discharges to surface water,Street/Curb and Gutter (2 3) |
Other (specify below),Inspected Sewer Using CCTV to Determine Cause. SacSewer will inspect the lower lateral with CCTV in 12 months to determine an appropriate preventative maintenance cleaning schedule. |
Violation |
A |
SSO |
1137150 |
11/25/2024 |
SSOS |
Type: Category 1 Spill; Debris-General caused 213 gallons of sewage to spill from Lateral Clean Out (Public) at 352375 to Unpaved Surface,Drainage Conveyance System that discharges to surface water,Street/Curb and Gutter (2 3),Paved Surface,Surface Water |
Plan Rehabilitation or Replacement of Sewer. SacSewer will replace the main line tap. |
Violation |
A |
SSO |
1136486 |
11/07/2024 |
SSOS |
Type: Category 1 Spill; Air Relief Valve (ARV)/ Blow-Off Valve (BOV) Failure caused 3925 gallons of sewage to spill from Other (specify below) at 351537 to Other (specify below),Street/Curb and Gutter (2 3),Surface Water,Unpaved Surface,Paved Surface |
Repaired Facilities or Replaced Defect. SacSewer replaced the CARV on November 8, 2024. |
Violation |
A |
SSO |
1136856 |
11/05/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 180 gallons of sewage to spill from Lateral Clean Out (Public) at 352058 to Paved Surface,Street/Curb and Gutter (2 3),Surface Water,Unpaved Surface,Drainage Conveyance System |
Inspected Sewer Using CCTV to Determine Cause. See attached Description of Spill Event. |
Violation |
A |
SSO |
1134606 |
10/05/2024 |
SSOS |
Type: Category 1 Spill; Debris from Lateral caused 84 gallons of sewage to spill from Lateral Clean Out (Public) at 349931 to Drainage Conveyance System that discharges to surface water,Surface Water,Unpaved Surface,Paved Surface,Street/Curb and Gutter (2 3) |
Plan Rehabilitation or Replacement of Sewer,Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the lower lateral with CCTV on October 5, 2024. Based on the findings, SacSewer will replace the lower lateral. |
Violation |
A |
SSO |
1133078 |
09/20/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 233 gallons of sewage to spill from Lateral Clean Out (Public) at 349156 to Street/Curb and Gutter (2 3),Drainage Conveyance System that discharges to surface water,Surface Water,Paved Surface,Unpaved Surface |
Adjusted Schedule/Method of Preventive Maintenance,Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the lower lateral with CCTV on September 21, 2024. Based on the findings, SacSewer adjusted the preventative maintenance schedule from a 48-month frequency to an 18-month frequency. |
Violation |
U |
SSO |
1134292 |
07/06/2024 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 900 gallons of sewage to spill from Lateral Clean Out (Public) at 345805 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water |
Inspected Sewer Using CCTV to Determine Cause, Other (specify below). SacSewer inspected the main line with CCTV on July 8, 2024. Based on the findings no further action is required. |
Violation |
A |
SSO |
1134289 |
05/07/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 291 gallons of sewage to spill from Lateral Clean Out (Public), Manhole at 342806 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water |
Adjusted Schedule/Method of Preventive Maintenance, Inspected Sewer Using CCTV to Determine Cause. See Attached Description of Spill Event. |
Violation |
A |
SSO |
1134286 |
03/30/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 13529 gallons of sewage to spill from Lateral Clean Out (Public), Manhole at 342354 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Adjusted Schedule/Method of Preventive Maintenance, Inspected Sewer Using CCTV to Determine Cause. See Attached Description of Spill Event. |
Violation |
A |
SSO |
1134283 |
03/17/2024 |
SSOS |
Type: Category 1 Spill; Debris-General caused 992 gallons of sewage to spill from Lateral Clean Out (Public), Manhole at 340435 to Surface Water, Unpaved Surface |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the main line with CCTV on March 18, 2024. Based on the findings, SacSewer placed the main line on a 24-month cleaning schedule. |
Violation |
A |
SSO |
1134281 |
03/16/2024 |
SSOS |
Type: Category 1 Spill; Debris from Lateral caused 594 gallons of sewage to spill from Manhole at 340428 to Drainage Conveyance System that discharges to surface water, Street/Curb and Gutter (2 3), Surface Water |
Inspected Sewer Using CCTV to Determine Cause, Repaired Facilities or Replaced Defect. SacSewer inspected the main line with CCTV on March 20, 2024, and replaced the broken main line tap on March 20, 2024. |
Violation |
A |
SSO |
1134282 |
03/13/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 1347 gallons of sewage to spill from Manhole at 340290 to Drainage Conveyance System that discharges to surface water, Paved Surface, Surface Water |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral with CCTV on March 14, 2024. Based on the findings, SacSewer will replace the lower lateral cleanout. |
Violation |
A |
SSO |
1134280 |
03/04/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 978 gallons of sewage to spill from Lateral Clean Out (Public) at 340371 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral with CCTV on March 14, 2024. Based on the findings, SacSewer will replace the lower lateral. |
Violation |
A |
SSO |
1134277 |
03/03/2024 |
SSOS |
Type: Category 1 Spill; Debris-General, Root Intrusion caused 75 gallons of sewage to spill from Lateral Clean Out (Public) at 339845 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral with CCTV on March 03, 2024. Based on the findings, SacSewer will replace the lower lateral tap to the mainline. |
Violation |
A |
SSO |
1134279 |
03/02/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 910 gallons of sewage to spill from Lateral Clean Out (Public) at 339999 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral with CCTV on March 6, 2024. Based on the findings, SacSewer will replace the lower lateral and main line tap. |
Violation |
A |
SSO |
1134276 |
03/01/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 78 gallons of sewage to spill from Lateral Clean Out (Public) at 339828 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral with CCTV on March 02, 2024. Based on the findings, SacSewer will replace the lower lateral. |
Violation |
A |
SSO |
1134275 |
02/28/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 378 gallons of sewage to spill from Lateral Clean Out (Public) at 339816 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral with CCTV on March 1, 2024. Based on the findings, SacSewer will repair the lower lateral. |
Violation |
A |
SSO |
1134278 |
02/26/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 1692 gallons of sewage to spill from Lateral Clean Out (Public) at 339926 to Drainage Conveyance System that discharges to surface water, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Repaired Facilities or Replaced Defect. SacSewer inspected the lower lateral with CCTV on March 5, 2024. Based on the findings, SacSewer replaced the SacSewer cleanout March 11, 2024. |
Violation |
A |
SSO |
1134274 |
02/24/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 88 gallons of sewage to spill from Lateral Clean Out (Public) at 339482 to Drainage Conveyance System that discharges to surface water, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Other (specify below). SacSewer inspected the mainline with CCTV on February 24, 2024. Based on the findings, SacSewer will re-inspect the lower lateral in 12 months for further evaluation. |
Violation |
A |
SSO |
1134273 |
02/22/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 349 gallons of sewage to spill from Lateral Clean Out (Public), Manhole at 339386 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Adjusted Schedule/Method of Preventive Maintenance, Inspected Sewer Using CCTV to Determine Cause. See Attached Description of Spill Event. |
Violation |
A |
SSO |
1134271 |
02/18/2024 |
SSOS |
Type: Category 1 Spill; Debris-General caused 658 gallons of sewage to spill from Lateral Clean Out (Public) at 339163 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the lower lateral with CCTV on February 19, 2024. Based on the findings, SacSewer added the lower lateral to a 24-month cleaning frequency PM. |
Violation |
A |
SSO |
1134270 |
02/14/2024 |
SSOS |
Type: Category 1 Spill; Debris from Lateral caused 16 gallons of sewage to spill from Lateral Clean Out (Public) at 338965 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Repaired Facilities or Replaced Defect. SacSewer inspected the lower lateral with CCTV on February 14, 2024. SacSewer replaced the lower lateral on February 27, 2024. |
Violation |
A |
SSO |
1134269 |
02/12/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 1246 gallons of sewage to spill from Lateral Clean Out (Public) at 339147 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral with CCTV on February 18, 2024. Based on the findings, SacSewer will replace the lower lateral. |
Violation |
A |
SSO |
1134267 |
02/10/2024 |
SSOS |
Type: Category 1 Spill; Air Relief Valve (ARV)/ Blow-Off Valve (BOV) Failure caused 10520 gallons of sewage to spill from Manhole at 338751 to Drainage Conveyance System that discharges to surface water, Paved Surface, Surface Water, Unpaved Surface |
Repaired Facilities or Replaced Defect. SacSewer replaced the CARV on February 13, 2024. |
Violation |
A |
SSO |
1134265 |
02/06/2024 |
SSOS |
Type: Category 1 Spill; Debris-General caused 52 gallons of sewage to spill from Lateral Clean Out (Public) at 338629 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral with CCTV on February 6, 2023. Based on the findings, SacSewer will repair the lower lateral. |
Violation |
A |
SSO |
1134264 |
02/03/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 190 gallons of sewage to spill from Lateral Clean Out (Public) at 338506 to Drainage Conveyance System that discharges to surface water, Paved Surface, Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral with CCTV on February 3, 2024. Based on the findings, SacSewer will replace the lower lateral. |
Violation |
A |
SSO |
1134263 |
01/31/2024 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 39 gallons of sewage to spill from Inside Building or Structure, Lateral Clean Out (Public) at 338377 to Building or Structure, Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the main line with CCTV on February 1, 2024. Based on the findings, SacSewer added the main line to a 48-month cleaning frequency PM. |
Violation |
A |
SSO |
1134260 |
01/13/2024 |
SSOS |
Type: Category 1 Spill; Debris from Lateral caused 30 gallons of sewage to spill from Lateral Clean Out (Public) at 337631 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral on January 13, 2024. Based on findings, SacSewer will replace the lower lateral. |
Violation |
A |
SSO |
1134259 |
01/13/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 30 gallons of sewage to spill from Lateral Clean Out (Public) at 337621 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral with CCTV on January 13, 2024. Based on the findings, SacSewer will replace the lower lateral. |
Violation |
A |
SSO |
1134258 |
01/05/2024 |
SSOS |
Type: Category 1 Spill; Debris-General caused 640 gallons of sewage to spill from Lateral Clean Out (Public) at 337431 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral with CCTV on January 9, 2024. Based on the findings, SacSewer will replace the lower lateral and main line tap. |
Violation |
A |
SSO |
1134257 |
01/02/2024 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 414 gallons of sewage to spill from Other (specify below) at 337116 to Drainage Conveyance System that discharges to surface water, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Adjusted Schedule/Method of Preventive Maintenance, Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the mainline with CCTV on January 3, 2024. Based on the findings, SacSewer adjusted the preventative maintenance cleaning frequency from 36 months to 12 months. |
Violation |
A |
SSO |
1134256 |
12/27/2023 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 1354 gallons of sewage to spill from Lateral Clean Out (Private) at 336971 to Drainage Conveyance System that discharges to surface water, Paved Surface, Surface Water |
Adjusted Schedule/Method of Preventive Maintenance, Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the lower lateral with CCTV on December 28, 2023. Based on the findings, SacSewer adjusted the preventative maintenance cleaning frequency from 24 month to 18 month. |
Violation |
A |
SSO |
1134255 |
12/20/2023 |
SSOS |
Type: Category 1 Spill; Damage by Others Not Related to Collection System Construction/Maintenance caused 780 gallons of sewage to spill from Manhole at 336733 to Drainage Conveyance System that discharges to surface water, Other (specify below), Paved Surface, Street/Curb and Gutter (2 3), Surface Water |
Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the main line with CCTV on December 22, 2023. The main line is in good condition and approximately one year old. Based on the findings, no action is needed at this time. |
Violation |
A |
SSO |
1134254 |
12/13/2023 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 2352 gallons of sewage to spill from Inside Building or Structure, Lateral Clean Out (Private) at 336354 to Building or Structure, Drainage Conveyance System that discharges to surface water, Paved Surface, Surface Water, Unpaved Surface |
Adjusted Schedule/Method of Preventive Maintenance, Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the main line with CCTV on December 14, 2023. Based on the findings, SacSewer adjusted preventative maintenance cleaning frequency from 24 months to 6 months. |
Violation |
A |
SSO |
1134252 |
12/01/2023 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 462 gallons of sewage to spill from Lateral Clean Out (Public) at 335996 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Adjusted Schedule/Method of Preventive Maintenance, Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the lateral with CCTV on December 4, 2023. Based on the findings, SacSewer adjusted the preventative maintenance cleaning frequency to 36 months from 24 months. |
Violation |
A |
SSO |
1134294 |
12/01/2023 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 1105 gallons of sewage to spill from Force Main at 345852 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water |
Repaired Facilities or Replaced Defect. SacSewer repaired the force main on July 11, 2024. |
Violation |
A |
SSO |
1134250 |
11/06/2023 |
SSOS |
Type: Category 1 Spill; Debris-General caused 58 gallons of sewage to spill from Lateral Clean Out (Public) at 334781 to Drainage Conveyance System that discharges to surface water, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lateral with CCTV on November 6, 2023. Based on the findings, SacSewer will replace the cleanout riser on the lower lateral. |
Violation |
A |
SSO |
1134249 |
11/04/2023 |
SSOS |
Type: Category 1 Spill; Debris-General caused 199 gallons of sewage to spill from Lateral Clean Out (Public) at 334747 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the lower lateral with CCTV on November 5, 2023. Based on the findings, SacSewer will repair the lower lateral.” |
Violation |
A |
SSO |
1134248 |
10/13/2023 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 586 gallons of sewage to spill from Lateral Clean Out (Public) at 333812 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Adjusted Schedule/Method of Preventive Maintenance, Inspected Sewer Using CCTV to Determine Cause, Plan Rehabilitation or Replacement of Sewer. SacSewer inspected the mainline with CCTV on October 16, 2023. Based on the findings, SacSewer adjusted the preventative maintenance cleaning frequency from 48 month to 24 month and will repair the main line. |
Violation |
A |
SSO |
1134246 |
09/13/2023 |
SSOS |
Type: Category 1 Spill; Debris-wipes/Non-disposables caused 2723 gallons of sewage to spill from Lateral Clean Out (Public) at 332749 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the lower lateral with CCTV on September 14, 2023. Based on the findings, SacSewer will inspect the lower lateral with CCTV in 12 months to determine an appropriate preventative maintenance cleaning frequency. |
Violation |
A |
SSO |
1134244 |
09/08/2023 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 98 gallons of sewage to spill from Manhole at 332477 to Drainage Conveyance System that discharges to surface water, Paved Surface, Street/Curb and Gutter (2 3), Surface Water |
Adjusted Schedule/Method of Preventive Maintenance, Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the lower lateral with CCTV on September 11, 2023. Based on the findings, SacSewer adjusted the preventative maintenance schedule from a 6-month schedule to a 3-month schedule. |
Violation |
A |
SSO |
1134242 |
08/05/2023 |
SSOS |
Type: Category 1 Spill; Root Intrusion caused 783 gallons of sewage to spill from Lateral Clean Out (Public) at 331257 to Drainage Conveyance System that discharges to surface water, Street/Curb and Gutter (2 3), Surface Water, Unpaved Surface |
Adjusted Schedule/Method of Preventive Maintenance, Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the lower lateral with CCTV on August 9, 2023. Based on the findings, SacSewer adjusted the preventative maintenance schedule from a 36-month schedule to a 12-month schedule. |
Violation |
A |
SSO |
1134240 |
07/05/2023 |
SSOS |
Type: Category 1 Spill; Other (specify below) caused 49 gallons of sewage to spill from Pump Station at 329674 to Drainage Conveyance System that discharges to surface water, Paved Surface, Surface Water, Unpaved Surface |
Repaired Facilities or Replaced Defect. SacSewer excavated the force main at S011 on July 5, 2023. Based on the findings, SacSewer repaired the cracked segment of the force main. |
Violation |
A |
SSO |
1133813 |
06/12/2023 |
SSOS |
Type: Category 1 Spill; Fats, Oil and Grease (FOG) caused 5357 gallons of sewage to spill from Manhole at 328628 to Drainage Conveyance System that discharges to surface water, Street/Curb and Gutter (2 3), Surface Water |
Added Sewer to Preventive Maintenance Program, Inspected Sewer Using CCTV to Determine Cause. SacSewer inspected the main line with CCTV on June 13, 2023. Based on the findings, SacSewer placed the main line on a 24-month preventative maintenance cleaning schedule. |
Violation |
A |
SSO |
1084187 |
01/16/2021 |
SSOS |
Type: Category 1. Pipe Structural Problem/Failure;Forcemain repair coupler dislodged causing overflow. caused 489494.0 gallons of sewage to spill from Force Main at 280974 to Separate Storm Drain;Surface Water;Unpaved surface. Surface water body affected (Un-named tributary to Mokelumne River). |
Cleaned-Up;Mitigated Effects of Spill;Contained all or portion of spill;Restored flow;Returned Portion of Spill to Sanitary Sewer System;Other Enforcement Agency Notified. ;Notified Sacramento County Environmental Management Department and Regional Water Quality Control Board. |
Violation |
B |
SSO |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|