| Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
| 1149638 |
11/17/2025 |
SSOS |
Type: Category 1 Spill; Flow Exceeded Capacity (Separate Collection System Only),Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 39000 gallons of sewage to spill from Manhole at 556 Painter St to Surface Water,Unpaved Surface |
Plan Rehabilitation or Replacement of Sewer. Planned upsizing of collection system in this area |
Violation |
A |
SSO |
| 1140037 |
02/13/2025 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 16830 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station |
Violation |
B |
SSO |
| 1139787 |
02/03/2025 |
SSOS |
Type: Category 1 Spill; Flow Exceeded Capacity (Separate Collection System Only),Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 110466 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1138716 |
01/03/2025 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 53550 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1138537 |
12/29/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 84915 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1138289 |
12/23/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only),Flow Exceeded Capacity (Separate Collection System Only) caused 78336 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1138199 |
12/13/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 4900 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1136854 |
11/21/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 16500 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1136852 |
11/21/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 4800 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1136904 |
11/21/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 74300 gallons of sewage to spill from Manhole at East Painter Street Man Hole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1136672 |
11/20/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 39600 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1133136 |
03/24/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 33825 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1133135 |
02/19/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 49660 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1133134 |
02/18/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 46740 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1133133 |
02/17/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 49200 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1133132 |
02/04/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 209100 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1133131 |
01/31/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 163600 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
B |
SSO |
| 1133130 |
01/20/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 63000 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. |
Violation |
B |
SSO |
| 1133129 |
01/13/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 81000 gallons of sewage to spill from Gravity Mainline, Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. |
Violation |
B |
SSO |
| 1133128 |
01/10/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 6000 gallons of sewage to spill from Gravity Mainline at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. |
Violation |
B |
SSO |
| 1114981 |
03/28/2023 |
SSOS |
Type: Category 1. Flow Exceeded Capacity (Separate CS Only) caused 15750 gallons of sewage to spill from Manhole;Manhole at Painter St manhole to Paved Surface;Surface Water. Surface water body affected (Eel River). |
Cleaned-Up;Restored flow;Property Owner Notified;Other Enforcement Agency Notified. |
Violation |
B |
SSO |
|
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|