1136904 |
11/21/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 74300 gallons of sewage to spill from Manhole at East Painter Street Man Hole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
A |
SSO |
1136854 |
11/21/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 16500 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
A |
SSO |
1136852 |
11/21/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 4800 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
A |
SSO |
1136672 |
11/20/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 39600 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
A |
SSO |
1133136 |
03/24/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 33825 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
A |
SSO |
1133135 |
02/19/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 49660 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
A |
SSO |
1133134 |
02/18/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 46740 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
A |
SSO |
1133133 |
02/17/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 49200 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
A |
SSO |
1133132 |
02/04/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 209100 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
A |
SSO |
1133131 |
01/31/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 163600 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. Also looking to camera sewer mains and do a smoke test of the laterals in the area that lead to the Painter Street Pump Station. |
Violation |
A |
SSO |
1133130 |
01/20/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 63000 gallons of sewage to spill from Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. |
Violation |
A |
SSO |
1133129 |
01/13/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 81000 gallons of sewage to spill from Gravity Mainline, Manhole at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. |
Violation |
A |
SSO |
1133128 |
01/10/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 6000 gallons of sewage to spill from Gravity Mainline at End of Painter Street Manhole to Surface Water |
Plan Rehabilitation or Replacement of Sewer. This site has a planned upsizing project in the planning phases for the past 6 years. Currently waiting on State funding to push the design process forward. |
Violation |
A |
SSO |
1114981 |
03/28/2023 |
SSOS |
Type: Category 1. Flow Exceeded Capacity (Separate CS Only) caused 15750 gallons of sewage to spill from Manhole;Manhole at Painter St manhole to Paved Surface;Surface Water. Surface water body affected (Eel River). |
Cleaned-Up;Restored flow;Property Owner Notified;Other Enforcement Agency Notified. |
Violation |
B |
SSO |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|