1140047 |
02/03/2025 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 18000 gallons of sewage to spill from Manhole at 12th Street at Loni Drive to Surface Water,Paved Surface,Drainage Conveyance System |
Plan Rehabilitation or Replacement of Sewer. Spill was monitored, unable to clean-up due to heavy rains. |
Violation |
A |
SSO |
1139948 |
02/03/2025 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 42750 gallons of sewage to spill from Manhole at Fortuna Fire Hall to Other (specify below),Drainage Conveyance System that discharges to surface water |
Plan Rehabilitation or Replacement of Sewer. There are plans in the works of replacing the line that is susceptible to storm SSOs |
Violation |
A |
SSO |
1138592 |
12/23/2024 |
SSOS |
Type: Category 1 Spill; Flow Exceeded Capacity (Separate Collection System Only),Inappropriate Discharge to Collection System caused 3800 gallons of sewage to spill from Pump Station at Rohnerville Lift station to Surface Water,Unpaved Surface |
Repaired Facilities or Replaced Defect. Diverted storm runoff away from manhole, added a three foot collar to manhole. |
Violation |
B |
SSO |
1138812 |
08/27/2024 |
Order Conditions |
Several deficiencies of Order Specifications 5.4, 5.13.2, 5.19 and Sections 7 and 8.1 of the Attachment D, Sanitary Sewer Management Plan Required Elements including failure to conduct FOG inspections and not conducting routine CS audits. |
|
Violation |
B |
Inspection |
1133511 |
01/31/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 23500 gallons of sewage to spill from Gravity Mainline, Manhole at Fortuna Fire Hall to Drainage Conveyance System that discharges to surface water, Paved Surface, Unpaved Surface |
Other (specify below). N/A |
Violation |
B |
SSO |
1133510 |
01/13/2024 |
SSOS |
Type: Category 1 Spill; Natural Disaster (specify below) caused 115200 gallons of sewage to spill from Manhole at loni drive to Drainage Conveyance System that discharges to surface water, Paved Surface, Surface Water |
Other (specify below). No corrective action can be taken, spill was result of a heavy rain storm. |
Violation |
B |
SSO |