| Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
| 1144886 |
01/03/2025 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 28500 gallons of sewage to spill from Upper Lateral (Private),Lower Lateral (Private),Manhole at Harris and Prospect to Street/Curb and Gutter (2 3),Paved Surface |
Adjusted Schedule/Method of Preventive Maintenance. Staff has requested Engineering help in this area due to the hydraulic issue the system experience in high rain events. |
Violation |
A |
SSO |
| 1144884 |
12/29/2024 |
SSOS |
Type: Category 1 Spill; Rainfall Exceeded Design, I and I (Separate Collection System Only) caused 2000 gallons of sewage to spill from Lateral Clean Out (Private),Gravity Mainline at Harris and Elizabeth, 636 W. Harris to Paved Surface,Street/Curb and Gutter (2 3) |
Post Spill CCTV. Staff is looking at the hydraulic issues that occurred during the high rain event. |
Violation |
A |
SSO |
| 1144885 |
12/27/2024 |
SSOS |
Type: Category 1 Spill; Debris-General,Debris-wipes/Non-disposables,Debris-Rags caused 180 gallons of sewage to spill from Manhole at Hemlock and Sequoia Lane to Unpaved Surface,Other (specify below) |
Added Sewer to Preventive Maintenance Program. This area had a blockage that has not happen in the past and is now added to the maintenance plan. |
Violation |
A |
SSO |
| 1144882 |
12/15/2024 |
SSOS |
Type: Category 1 Spill; Debris from Construction caused 4500 gallons of sewage to spill from Manhole,Lateral Clean Out (Private),Lower Lateral (Private),Inside Building or Structure at Harris between Ocean and Prospect to Building or Structure |
Post Spill CCTV. Staff is looking at the hydraulic issues that may be occurring here in high rain events. |
Violation |
A |
SSO |
|
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|