Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID 269989
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
9 269989 Vallecitos WD Meadowlark WRP Wastewater Treatment Facility 7941 Corintia Carlsbad, CA, 92009 San Diego

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
537418 Person Octavio Navarrete Is Onsite Manager For 10/29/2012
355519 Person John Jardin Is Onsite Manager For 03/17/2011 08/30/2013
304897 Person Doug Campbell Is A Data Submitter For 02/11/2011 12/30/2021
525853 Person Brian C Benjamin Is Onsite Manager For 02/11/2011 08/30/2013
525854 Person Justin Law Is A Data Submitter For 02/11/2011 08/30/2013
149695 Person Joann Lim Case Worker 05/24/2010
14804 Organization Encina Wastewater Authority Owner City Agency 04/12/2000
Total Related Parties: 7

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
440374 Co-Permitee SB SLIC 2020-0015-DWQ 9 000000030 07/09/2020 Active N
425154 NPDES Permit 9 NPDMUNILRG R9-2018-0059 9 000000030 11/01/2018 10/31/2023 Active N
378933 NPDES Permit 9 NPDMUNILRG R9-2011-0019 06/02/2011 06/01/2016 Historical Y
305385 NPDES Permit 9 NPDMUNILRG R9-2005-0219 9 000000030 01/01/2006 01/01/2011 Historical N
Total Reg Measures: 4

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
1147878 08/25/2025 DMON Analyst Error for Sample M002 CBOD 8-25-2025 A chemist cross-contaminated a chlorinated sample with the M002 CBOD, resulting in a lack of depletion. The chemist was retrained on proper techniques to avoid cross-contamination. The laboratory manager reviewed subsequent BOD and CBOD data to ensure the effectiveness of the training. Violation U eSMR
1147877 08/25/2025 DMON Analyst error for site M002 CBOD resulting in less than 7 consecutive CBOD samples for 7-day monitoring per page E-6 of order R9-2018-0059 permit. A chemist cross-contaminated a chlorinated sample with the M002 CBOD, resulting in a lack of depletion. The chemist was retrained on proper techniques to avoid cross-contamination. The laboratory manager reviewed subsequent BOD and CBOD data to ensure the effectiveness of the training. Violation U eSMR
1126510 01/19/2024 UAUTHDISC Failsafe line break released 200 gallons of tertiary treated, reclaimed water with no chlorine residual into San Marcos Creek. Although the water was treated to Title 22 standards; the plant was not reclaiming, and the water was routed to the failsafe pipe-location M002. Failsafe flow was lowered and diverted to Mahr Reservoir when release was first noticed. Ten minutes later flow to line M002 was shut off completely. The pipe was repaired with a stainless-steel repair clamp and backfilled per District specs. Violation B eSMR
1119447 04/08/2023 DMON From April 1 to 14, 2023, Encina reported flow from M-002. During the week of April 2 to 8, the report appears to only include four monitoring results for CBOD at M-002. During the week of April 9 to 15, the report includes the required five monitoring results for CBOD at M-002. Violation B Report
1119423 07/11/2022 UAUTHDISC 2 W Hydropneumatic Tank drain is not alligned with the drain in the ground/concrete pad causing drain 2W water to overflow to adjacened ground which was draining via a french drain directly to the brow ditch, which ultimatly trickled to the storm channel (estimated 20 gallons). The small volume drained from 2 W tank reached the storm channel before it was noticed. The spill was 300 gallons, 280 was recovered, and 20 gallons was released to the environment. Violation B Report
1119422 05/23/2022 UAUTHDISC The contractor broke an airvac on the discharge pipe, spilling 1,750 gallons of secondary-treated wastewater at the Leucadia Pump Station discharge pipe. Encina reported recovering 1,300 gallons of the spill. The spill reached flood control channel/receiving water. Shut down pumps, notified Leucadia. Drained back the discharge pipe to the wetwell. Pumped recovered water back to plant treatment. Violation B Report
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 6 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
DMON = Deficient Monitoring UAUTHDISC = Unauthorized Discharge

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
385176 Staff Enforcement Letter Never Active
418356 Staff Enforcement Letter Never Active
433296 Staff Enforcement Letter null 07/30/2019 Historical
411459 Staff Enforcement Letter 01/19/2017 Withdrawn
407735 Staff Enforcement Letter null 08/11/2016 Historical
405604 Staff Enforcement Letter null 04/08/2016 Historical
401506 Staff Enforcement Letter null 07/16/2015 Historical
Total Enf Actions: 7

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
60039237 B Type compliance inspection Joann Lim 05/05/2025 N 0 Download
55169379 B Type compliance inspection Joann Lim (Multiple) 03/18/2024 Y 0 Download
32762588 B Type compliance inspection Joann Lim 03/07/2018 N 0 [Attachments]
25688744 Preatment Audit Joann Lim 05/12/2016 Y 0 Download
23618935 B Type compliance inspection Dat Quach 01/27/2016 Y 0 Download
25687692 Pretreatment compliance Danny O'Connell 10/31/2013 Y 0 Download
4999911 Preatment Audit Joann Lim 02/10/2011 N 0 [Attachments]
5701703 Preatment Audit Greg Roy (Multiple) 02/10/2011 N 0 Download
2751997 B Type compliance inspection Craig Blett 12/17/2009 Y 0 Download
1821724 B Type compliance inspection Daniel Connally 01/14/2009 Y 0 N/A
1810105 B Type compliance inspection Carole Leong 03/11/2008 Y 0 N/A
332918 B Type compliance inspection Brian D Kelley 12/09/2003 Y 0 N/A
329223 B Type compliance inspection Victor Vasquez 02/13/2003 Y 0 N/A
299458 B Type compliance inspection Bob Baker 01/15/2002 Y 0 N/A
299456 A Type compliance inspection Sue Pease 04/22/1998 Y 0 N/A
299457 B Type compliance inspection Sue Pease 06/11/1997 Y 0 N/A
299459 B Type compliance inspection Sue Pease 11/26/1996 Y 0 N/A
299476 A Type compliance inspection Sue Pease 04/26/1996 Y 0 N/A
299475 B Type compliance inspection Sue Pease 10/26/1995 Y 0 N/A
299477 A Type compliance inspection Gloria Fulton 10/19/1994 Y 0 N/A
299455 A Type compliance inspection Gloria Fulton 01/28/1992 Y 0 N/A
Total Inspections: 21 Last Inspection: 05/05/2025
  
The current report was generated with data as of: 10/15/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page