Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
1142872 |
03/11/2025 |
CAT1 |
Total Suspended Solids (TSS) Monthly Average (Mean) limit is 30 mg/L and reported value was 62.5 mg/L at INT-001E. |
To prevent future reoccurrences, LADWP will coordinate with the Scattergood facility to monitor the implementation and maintenance of BMPs, such as storm drain socks, filter strips, as well as sweeping in order to remove any accumulated sediment from the facility's driveways, both before and after forecasted storm events. |
Violation |
U |
eSMR |
1142871 |
02/13/2025 |
CAT1 |
Total Suspended Solids (TSS) Monthly Average (Mean) limit is 30 mg/L and reported value was 41.2 mg/L at INT-001D. |
To prevent future reoccurrences, LADWP will coordinate with the Scattergood facility to monitor the implementation and maintenance of BMPs, such as storm drain socks, filter strips, as well as sweeping in order to remove any accumulated sediment from the facility's driveways, both before and after forecasted storm events. |
Violation |
U |
eSMR |
1139754 |
01/31/2025 |
Deficient Reporting |
DDT was sampled from sample point EFF-001 (Outfall Effluent) on December 26, 2024 (COC#24-1708). This constituent is currently pending analysis, and the analysis results will be submitted as soon as they are made available. |
LADWP with coordinate its analysis laboratories to receive the required data to meet its regulatory deadlines. |
Violation |
U |
eSMR |
1139751 |
11/30/2024 |
DMON |
DDT, PCB¿s (as Aroclors),and Bis(2-ethylhexyl) phthalate are required to be sampled and analyzed on a monthly Basis from sample point EFF-001 (Outfall Effluent). Ammonia, Nitrate and TCDD Equivalents (Dioxins) are also required to be sampled and analyzed on a semiannual basis from EFF-001.
However, due to logistical delays with the laboratories, these samples were not able to be taken during the month of November 2024.
|
As a corrective action, LADWP's Wastewater Quality and Compliance Group will be implementing monthly NPDES reporting meetings with our Environmental Lab to regularly review monitoring and reporting requirements and ensure all required sampling is conducted as soon as possible during the reporting period to account for any intermittent flows. |
Violation |
U |
eSMR |
1139752 |
11/30/2024 |
DMON |
Total Suspended Solids (TSS), Oil and Grease (O&G and Bis(2-ethylhexyl) phthalate are required to be sampled and analyzed on a monthly Basis from sample point INT-001B (RO System).
However, due to logistical delays with the laboratories, these samples were not able to be taken during the month of November 2024.
|
As a corrective action, LADWP's Wastewater Quality and Compliance Group will be implementing monthly NPDES reporting meetings with our Environmental Lab to regularly review monitoring and reporting requirements and ensure all required sampling is conducted as soon as possible during the reporting period to account for any intermittent flows.
|
Violation |
U |
eSMR |
1139750 |
10/31/2024 |
DMON |
Total Suspended Solids (TSS), Oil and Grease (O&G and Bis(2-ethylhexyl) phthalate are required to be sampled and analyzed on a monthly Basis from sample point INT-001B (RO System). Samplers were scheduled to take the required samples during the month of October 2024.
However, due to the intermittent flow and logistical delays, the samples were not able to be taken during the month of October 2024.
|
As a corrective action, LADWP's Wastewater Quality and Compliance Group will be implementing monthly NPDES reporting meetings with our Environmental Lab to regularly review monitoring and reporting requirements and ensure all required sampling is conducted as soon as possible during the reporting period to account for any intermittent flows. |
Violation |
U |
eSMR |
1139753 |
10/31/2024 |
DMON |
Total Suspended Solids (TSS), Oil and Grease (O&G), Copper, Iron and Bis(2-ethylhexyl) phthalate are required to be sampled and analyzed on a monthly Basis from sample point INT-001A (Settling Basin). Samplers were scheduled to take the required samples during the month of October 2024.
However, due to the intermittent flow, the samples were not able to be taken during the month of October, but at the soonest feasible date with sufficient sample volume, which was November 1, 2024. |
As a corrective action, LADWP's Wastewater Quality and Compliance Group will be implementing monthly NPDES reporting meetings with our Environmental Lab to regularly review monitoring and reporting requirements and ensure all required sampling is conducted as soon as possible during the reporting period to account for any intermittent flows. |
Violation |
U |
eSMR |
1135170 |
08/31/2024 |
DMON |
Total Cyanide and TCDD (Dioxin) are required to be sampled and analyzed on an Annual Basis from sample point INT-001A (Settling Basin), during the month of August. Due to errors in the COC, Total Cyanide and TCDD (Dioxin) were not analyzed during 3rd Quarter 2024. |
As a corrective action, Total Cyanide and TCDD (Dioxin) will be re-sampled during 4th Quarter 2024 at sample point INT-001A (Settling Basin,) and analyzed for the required constituent data. |
Violation |
U |
eSMR |
1135171 |
08/31/2024 |
DMON |
Total Cyanide and TCDD (Dioxin) are required to be sampled and analyzed on an Annual Basis from sample point INT-001B (RO System) during the month of August. Due to errors in the COC, Total Cyanide and TCDD (Dioxin) were not analyzed during 3rd Quarter 2024. |
As a corrective action, Total Cyanide and TCDD (Dioxin) will be re-sampled during 4th Quarter 2024 at sample point INT-001B (RO System) and analyzed for the required constituent data. |
Violation |
U |
eSMR |
1130332 |
08/01/2024 |
Deficient Reporting |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Outfall Effluent (EFF-001) to be sampled for Priority Pollutants on a semi-annual basis. These samples were taken on 1/26/2024 (COC attached), and analyzed for metals on 2/2/2024. The data for the following Metals are currently not available: Antimony, Arsenic, Cadmium, Copper, Lead, Mercury, Nickel, Silver. The results data for Cyanide and Tributyltin are also currently not available. |
LADWP is coordinating with the analysis laboratory for the remaining data, and will submit this data as soon as it is made available. |
Violation |
U |
eSMR |
1126795 |
02/01/2024 |
DMON |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Eastern Stormwater Drainage (INT-001D) to be sampled for Total Suspended Solids on a monthly basis. The sample for Total Suspended Solids was taken on 2/1/2024. However, the sample was not analyzed within the holding time. |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will coordinate with its analysis laboratories to ensure that all samples are logged and analyzed within the required holding times. |
Violation |
U |
eSMR |
1126796 |
02/01/2024 |
DMON |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Western Stormwater Drainage (INT-001E) to be sampled for Total Suspended Solids on a monthly basis. The sample for Total Suspended Solids was taken on 2/1/2024. However, the sample was not analyzed within the holding time. |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will coordinate with its analysis laboratories to ensure that all samples are logged and analyzed within the required holding times. |
Violation |
U |
eSMR |
1126794 |
01/31/2024 |
DMON |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Western Stormwater Drainage (INT-001E), to be sampled for pH, Total Suspended Solids, and Oil and Grease on a monthly basis. The sampling point (INT-001E) was not accessible for sampling due to obstructed access. |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will coordinate with facility staff to ensure that the facility¿s laboratory personnel have access to all the required sampling points. |
Violation |
U |
eSMR |
1130331 |
01/26/2024 |
OEV |
Enterococci Daily Maximum limit is 104 MPN/100 mL and reported value was 2419.6 MPN/100 mL at EFF-001. |
Thus, Enterococcus Bacteria was then re-sampled for an additional 5 weeks. LADWP will continue to monitor for Enterococcus at Monitoring Location EFF-001, evaluating for sources of the pollutants, and is sampling for Enterococcus through July and August 2024.
|
Violation |
U |
eSMR |
1126793 |
01/20/2024 |
CAT1 |
Total Suspended Solids (TSS) 30-Day Average limit is 35 mg/L and reported value was 42 mg/L at INT-001D. |
To prevent future reoccurrence, LADWP shall implement and maintain BMP's throughout the Storm Season to reduce the levels of Total Suspended Solids (TSS) in the Stormwater Runoff at the Scattergood facility. |
Violation |
U |
eSMR |
1123653 |
12/20/2023 |
DMON |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Western Stormwater Drainage (INT-001E), to be sampled for pH, Total Suspended Solids (TSS) and Oil and Grease on a monthly basis. The sampling point (INT-001E) was not accessible for sampling due to obstructed access. |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will coordinate with facility staff to ensure that the facility¿s laboratory personnel have access to all the required sampling points. |
Violation |
U |
eSMR |
1123652 |
12/20/2023 |
CAT1 |
Total Suspended Solids (TSS) 30-Day Average limit is 35 % and reported value was 53 % at INT-001D. |
To prevent future reoccurrence, the SGS facility maintenance staff will increase the implementation of BMPs, such as sweeping, storm drain socks, and silt fencing. |
Violation |
U |
eSMR |
1123650 |
12/15/2023 |
OEV |
Temperature Daily Maximum limit is 100 Degrees F and reported value was 120 Degrees F at EFF-001. |
To prevent future reoccurrences, to the best of the facility operators¿ ability, they will lower the load when temperatures approach the limit. However, in order for the operator to lower the load, a request must be made and approved by LADWP's Energy Control Center (ECC). As was done this past event, a request to the load dispatchers will be made to lower the load when the temperature begins to approach the 100°F limit. Additionally, divers were deployed to inspect the valves for accuracy and functionality. |
Violation |
U |
eSMR |
1123651 |
11/15/2023 |
DMON |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Western Stormwater Drainage (INT-001E), to be sampled for pH, Total Suspended Solids (TSS) and Oil and Grease on a monthly basis. The sampling point (INT-001E) was not accessible for sampling due to obstructed access. |
To prevent future reoccurrence, the facility staff will coordinate with laboratory personnel to ensure that the facility's laboratory personnel have access to all the required sampling points. |
Violation |
U |
eSMR |
1121580 |
11/01/2023 |
Deficient Reporting |
Annual Priority Pollutants for RO System (INT-001B) were collected on 8/8/23. However, some results are still pending analysis. The results will be submitted to the Water Board as soon as they are made available. |
The results will be submitted to the Water Board as soon as they are made available. |
Violation |
U |
eSMR |
1121579 |
11/01/2023 |
Deficient Reporting |
Monthly NPDES results for DDT at the Outfall (EFF-001) are still pending analysis. The results will be submitted to the Water Board as soon as they are made available. |
The results will be submitted to the Water Board as soon as they are made available. |
Violation |
U |
eSMR |
1116249 |
05/01/2023 |
Deficient Reporting |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Effluent Outfall (EFF-001) to be sampled on a monthly basis for DDT, PCB's (as Aroclors), and Bis (2-ethylhexyl) Phthalate. These samples were taken on March 29,2023. For reasons beyond LADWP's control, the sample analyses were delayed. The monthly samples for March 2023 are being analyzed by a contract lab, and the results are still pending as of May 1, 2023. The Self-Monitoring Report (SMR) and Discharge Monitoring Report (DMR) will be revised and re-submitted once the results are received. The code NODI (X) was used for the constituent analyses that are pending results on the DMR. |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will continue tracking and closely monitoring both the LADWP Environmental laboratory and contract laboratories to ensure that all samples are being delivered and analyzed in a timely manner to ensure compliance with NPDES reporting schedules. |
Violation |
U |
eSMR |
1116247 |
05/01/2023 |
Deficient Reporting |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Reverse Osmosis System (INT-001B) to be sampled on a monthly basis for Oil and Grease (O&G), Total Suspended Solids (TSS), and Bis (2-ethylhexyl) Phthalate. These samples were taken on March 20,2023 and March 21,2023. For reasons beyond LADWP's control, the sample analyses were delayed. The monthly samples for March 2023 are being analyzed by a contract lab, and the results are still pending as of May 1, 2023. The Self-Monitoring Report (SMR) and Discharge Monitoring Report (DMR) will be revised and re-submitted once the results are received. The code NODI (X) was used for the constituent analyses that are pending results on the DMR. |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will continue tracking and closely monitoring both the LADWP Environmental laboratory and contract laboratories to ensure that all samples are being delivered and analyzed in a timely manner to ensure compliance with NPDES reporting schedules. |
Violation |
U |
eSMR |
1116250 |
05/01/2023 |
Deficient Reporting |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Settling Basin (INT-001A), to be sampled on a monthly basis for Oil and Grease (O&G), Total Suspended Solids (TSS), Copper, Iron and Bis (2-ethylhexyl) Phthalate. These samples were taken from March 28 to March 29, 2023. For reasons beyond LADWP's control, the sample analyses were delayed. The monthly samples for March 2023 are being analyzed by a contract lab, and the results are still pending as of May 1, 2023. The Self-Monitoring Report (SMR) and Discharge Monitoring Report (DMR) will be revised and re-submitted once the results are received. The code NODI (X) was used for the constituent analyses that are pending results on the DMR. |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will continue tracking and closely monitoring both the LADWP Environmental laboratory and contract laboratories to ensure that all samples are being delivered and analyzed in a timely manner to ensure compliance with NPDES reporting schedules. |
Violation |
U |
eSMR |
1116246 |
02/22/2023 |
DMON |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Reverse Osmosis System (INT-001B) to be sampled for Bis(2-ethylhexyl) phthalate on a monthly basis. The composite sample for Bis(2-ethylhexyl) phthalate was not taken due to insufficient flow for sampling, as referenced under the no data indicator (NODI) code NODI (F).
|
To prevent future reoccurrence, LADWP shall coordinate all composite sampling to coincide with the anticipated waste stream discharge flows, in order to ensure that there shall be sufficient flow for all required NPDES sampling. |
Violation |
U |
eSMR |
1114107 |
02/01/2023 |
DMON |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Cooling Tower Blowdown (INT-001C) to be sampled on a monthly basis for Chromium, Zinc, and Bis (2-ethylhexyl) Phthalate. These samples were taken on December 8, 2022. For reasons beyond LADWP's control, the sample analyses were delayed. The monthly samples for December 2022 were being analyzed by a contract lab, and the results were still pending as of February 1, 2023. The 4th Quarter 2022 Self-Monitoring Report (SMR) and Discharge Monitoring Report (DMR) will be revised and re-submitted once the results are received. The code NODI (X) was used for the constituent analyses that are pending results on the DMR. |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will create a tracking sheet and closely monitor both the LADWP Environmental laboratory and contract laboratories to ensure that all samples are being delivered and analyzed in a timely manner to ensure compliance with NPDES reporting schedules. |
Violation |
U |
eSMR |
1114108 |
02/01/2023 |
DMON |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Effluent Outfall (EFF-001) to be sampled on a monthly basis for DDT, PCB's (as Aroclors), and Bis (2-ethylhexyl) Phthalate. These samples were taken on December 7, 2022. For reasons beyond LADWP's control, the sample analyses were delayed. The monthly samples for December 2022 were being analyzed by a contract lab, and the results were still pending as of February 1, 2023. The 4th Quarter 2022 Self-Monitoring Report (SMR) and Discharge Monitoring Report (DMR) will be revised and re-submitted once the results are received. The code NODI (X) was used for the constituent analyses that are pending results on the DMR. |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will create a tracking sheet and closely monitor both the LADWP Environmental laboratory and contract laboratories to ensure that all samples are being delivered and analyzed in a timely manner to ensure compliance with NPDES reporting schedules. |
Violation |
U |
eSMR |
1114106 |
02/01/2023 |
DMON |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Reverse Osmosis System (INT-001B) to be sampled on a monthly basis for Oil and Grease (O&G), Total Suspended Solids (TSS), and Bis (2-ethylhexyl) Phthalate. These samples were taken from December 6, 2022 through December 8, 2022. For reasons beyond LADWP's control, the sample analyses were delayed. The monthly samples for December 2022 were being analyzed by a contract lab, and the results were still pending as of February 1, 2023. The 4th Quarter 2022 Self-Monitoring Report (SMR) and Discharge Monitoring Report (DMR) will be revised and re-submitted once the results are received. The code NODI (X) was used for the constituent analyses that are pending results on the DMR. used for the constituent analyses that are pending results on the DMR. |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will create a tracking sheet and closely monitor both the LADWP Environmental laboratory and contract laboratories to ensure that all samples are being delivered and analyzed in a timely manner to ensure compliance with NPDES reporting schedules. |
Violation |
U |
eSMR |
1114109 |
02/01/2023 |
DMON |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Settling Basin (INT-001A), to be sampled on a monthly basis for Oil and Grease (O&G), Total Suspended Solids (TSS), Copper, Iron and Bis (2-ethylhexyl) Phthalate. These samples were taken on December 6, 2022. For reasons beyond LADWP's control, the sample analyses were delayed. The monthly samples for December 2022 were being analyzed by a contract lab, and the results were still pending as of February 1, 2023. The 4th Quarter 2022 Self-Monitoring Report (SMR) and Discharge Monitoring Report (DMR) will be revised and re-submitted once the results are received. The code NODI (X) was used for the constituent analyses that are pending results on the DMR |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will create a tracking sheet and closely monitor both the LADWP Environmental laboratory and contract laboratories to ensure that all samples are being delivered and analyzed in a timely manner to ensure compliance with NPDES reporting schedules. |
Violation |
U |
eSMR |
1113018 |
02/01/2023 |
Deficient Reporting |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Cooling Tower Blowdown (INT-001C) to be sampled on a monthly basis for Chromium, Zinc, and Bis (2-ethylhexyl) Phthalate. These samples were taken on December 8, 2022. For reasons beyond LADWP's control, the sample analyses were delayed. The monthly samples for December 2022 are being analyzed by a contract lab, and the results are still pending as of February 1, 2023. The Self-Monitoring Report (SMR) and Discharge Monitoring Report (DMR) will be revised and re-submitted once the results are received. The code NODI (X) was used for the constituent analyses that are pending results on the DMR. |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will create a tracking sheet and closely monitor both the LADWP Environmental laboratory and contract laboratories to ensure that all samples are being delivered and analyzed in a timely manner to ensure compliance with NPDES reporting schedules. |
Violation |
U |
eSMR |
1113020 |
02/01/2023 |
Deficient Reporting |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Effluent Outfall (EFF-001) to be sampled on a monthly basis for DDT, PCB's (as Aroclors), and Bis (2-ethylhexyl) Phthalate.
These samples were taken on December 7, 2022. For reasons beyond LADWP's control, the sample analyses were delayed. The monthly samples for December 2022 are being analyzed by a contract lab, and the results are still pending as of February 1, 2023. The Self-Monitoring Report (SMR) and Discharge Monitoring Report (DMR) will be revised and re-submitted once the results are received. The code NODI (X) was used for the constituent analyses that are pending results on the DMR.
|
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will create a tracking sheet and closely monitor both the LADWP Environmental laboratory and contract laboratories to ensure that all samples are being delivered and analyzed in a timely manner to ensure compliance with NPDES reporting schedules.
|
Violation |
U |
eSMR |
1113017 |
02/01/2023 |
Deficient Reporting |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Reverse Osmosis System (INT-001B) to be sampled on a monthly basis for Oil and Grease (O&G), Total Suspended Solids (TSS), and Bis (2-ethylhexyl) Phthalate. These samples were taken from December 6, 2022 through December 8, 2022. For reasons beyond LADWP's control, the sample analyses were delayed. The monthly samples for December 2022 are being analyzed by a contract lab, and the results are still pending as of February 1, 2023. The Self-Monitoring Report (SMR) and Discharge Monitoring Report (DMR) will be revised and re-submitted once the results are received. The code NODI (X) was used for the constituent analyses that are pending results on the DMR. |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will create a tracking sheet and closely monitor both the LADWP Environmental laboratory and contract laboratories to ensure that all samples are being delivered and analyzed in a timely manner to ensure compliance with NPDES reporting schedules. |
Violation |
U |
eSMR |
1113019 |
02/01/2023 |
Deficient Reporting |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Settling Basin (INT-001A), to be sampled on a monthly basis for Oil and Grease (O&G), Total Suspended Solids (TSS), Copper, Iron and Bis (2-ethylhexyl) Phthalate.
These samples were taken on December 6, 2022. For reasons beyond LADWP's control, the sample analyses were delayed. The monthly samples for December 2022 are being analyzed by a contract lab, and the results are still pending as of February 1, 2023. The Self-Monitoring Report (SMR) and Discharge Monitoring Report (DMR) will be revised and re-submitted once the results are received. The code NODI (X) was used for the constituent analyses that are pending results on the DMR.
|
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will create a tracking sheet and closely monitor both the LADWP Environmental laboratory and contract laboratories to ensure that all samples are being delivered and analyzed in a timely manner to ensure compliance with NPDES reporting schedules.
|
Violation |
U |
eSMR |
1116248 |
01/31/2023 |
DMON |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Western Stormwater Drainage (INT-001E), to be sampled for pH, Total Suspended Solids, and Oil and Grease on a monthly basis. The sampling point (INT-001E) was not accessible for sampling due to obstructed access |
To prevent future reoccurrence, the LADWP Wastewater Quality and Compliance Group will coordinate with facility staff to ensure that the Environmental laboratory and contract laboratories have access to all the required sampling points. |
Violation |
U |
eSMR |
1116243 |
01/13/2023 |
DMON |
The Scattergood Generation Station (SGS) NPDES Permit No. CA0000370 requires the Settling Tank (INT-001A), to be sampled for pH on a monthly basis. The monthly NPDES samples at the Settling Tank did not include pH readings due to sampling error. |
To prevent future reoccurrence, LADWP shall review chain of custody (COC) and verify that field measurements for pH are taken for all wastewater samples. |
Violation |
U |
eSMR |
1117344 |
12/31/2021 |
Deficient Reporting |
Missing tributyltin and benzo[k]fluoranthene with required frequencies of once per semiannual period. |
|
Violation |
B |
Report |
1117340 |
08/02/2021 |
LREP |
Second quarter 2021 was submitted one day late. |
|
Violation |
B |
Report |
1117342 |
06/30/2021 |
Deficient Reporting |
Missing tributyltin and benzo[k]fluoranthene with required frequencies of once per semiannual period. |
|
Violation |
B |
Report |
1109139 |
05/03/2021 |
LREP |
Report was submitted 2 days late. |
|
Violation |
B |
Report |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|