1131040 |
07/11/2024 |
CAT2 |
Cyanide, Total (as CN) Monthly Mean limit is 14.0 ug/L and reported value was 14.6 ug/L at EFF-001. |
Cyanide sample containers will have NaOH sample preservative titrated to a pH of 10 to reduce interference. |
Violation |
U |
eSMR |
1125034 |
02/19/2024 |
DMON |
Dissolved Oxygen was not sampled a second time in this monitoring period. |
Laboratory Supervisor and Chief Plant Operator will review data entered on a weekly basis to verify that all required monitoring is being completed. |
Violation |
U |
eSMR |
1122971 |
11/21/2023 |
DMON |
Turbidity samples were collected on 11/21/23. Turbidity samples are required to be analyzed within 48 hours of sampling. This sample was not analyzed until 11/27/23. Due to some lab staff off duty due to Thanksgiving and another staff member injured on his way to work the samples were not analyzed on time. |
The laboratory will work to better communicate during periods when staff members are off duty for vacations or otherwise unable to perform required testing within method specified hold times. |
Violation |
U |
eSMR |
1122970 |
11/21/2023 |
DMON |
Turbidity samples were collected on 11/21/23. Turbidity samples are required to be analyzed within 48 hours of sampling. This sample was not analyzed until 11/27/23. Due to some lab staff off duty due to Thanksgiving and another staff member injured on his way to work the samples were not analyzed on time. |
The laboratory will work to better communicate during periods when staff members are off duty for vacations or otherwise unable to perform required testing within method specified hold times. |
Violation |
U |
eSMR |
1122021 |
10/03/2023 |
CAT2 |
Chlorine, Total Residual 1-Hour Average (Mean) limit is 0.019 mg/L and reported value was 0.192 mg/L at EFF-001. |
The SCADA at the plant has been programmed to divert effluent flow when levels of Sodium Bisulfite drop below 0.5mg/l. This programming will stop effluent flow prior to Sodium Bisulfite levels reaching zero. This should protect the plant from Sodium Bisulfite feed failures in the future. |
Violation |
B |
eSMR |
1118112 |
05/22/2023 |
CAT2 |
Chlorine, Total Residual 1-Hour Average (Mean) limit is 0.019 mg/L and reported value was 0.46 mg/L at EFF-001. |
Plant standard operation procedures will be edited to emphasize the importance of isolating any chemical feed pump before cutting connected hoses. Plant staff will be retrained to follow updated SOP's. The Sodium Bisulfite pumps are now secured in their permanent mounting location. |
Violation |
B |
eSMR |
1115770 |
03/27/2023 |
CAT2 |
Chlorine, Total Residual 1-Hour Average (Mean) limit is 0.019 mg/L and reported value was 0.19 mg/L at EFF-001. |
A third pump is planned to be added as a backup incase of peristaltic tubing failure. Plant staff are also planning to increase the frequency of tubing replacement despite manufacturer replacement suggestions. |
Violation |
B |
eSMR |
1112489 |
12/31/2022 |
DMON |
EFF-001 Ammonia was sampled 12/6/22 and analyzed 1/10/23 outside of hold time. |
Laboratory staff will prioritize analyzing samples expeditiously after sampling. Software is being implemented which will schedule and track samples which should assist analysts completing analysis' on time. |
Violation |
U |
eSMR |
1112490 |
12/27/2022 |
OEV |
Total Coliform 7-Day Median limit is 23 MPN/100 mL and reported value was 33 MPN/100 mL at EFF-001. |
Operators will continue to operate filters to remove as much suspended material as possible. When Turbidity levels increase operators will consider increasing chlorine dosing to assure full disinfection. |
Violation |
U |
eSMR |
1112488 |
12/12/2022 |
OEV |
Total Coliform 7-Day Median limit is 23 MPN/100 mL and reported value was 33 MPN/100 mL at EFF-001. |
Operations staff will continue to operate the plant in an effort to remove organic material prior to Chlorine dosing. When organics are present disinfection agents are not as effective. |
Violation |
U |
eSMR |
1101186 |
01/04/2022 |
DMON |
River-002 Hardness sample was taken on 1/4/2022 concurrently with River-002 metals as required. The sample was disposed of prior to the testing on the sample being completed. |
New standard operating procedures have been established to assure no samples are disposed of before analyses are complete. |
Violation |
U |
eSMR |
1098280 |
11/30/2021 |
DMON |
EFF-001 Nitrite analyzed outside of 48 hour hold time. Therefore results for Nitrite and Total N nitrite+nitrate are reported as estimated values. |
The City of Redding has hired a Laboratory Supervisor to oversee lab operations and install protocols to ensure sampling and analyses are performed on time to meet discharge requirements. |
Violation |
U |
eSMR |
1094446 |
08/07/2021 |
DMON |
pH was not analyzed. The Plant was diverted for a construction project and was not discharging from August 2nd to August 7th. The Lab staff believed that since the plant was not discharging. There was no effluent effect on the receiving water, and that sampling was not required.
Temperature was not analyzed. The Plant was diverted for a construction project and was not discharging from August 2nd to August 7th. The Lab staff believed that since the plant was not discharging. There was no effluent effect on the receiving water, and that sampling was not required.
BOD was not analyzed due to a plant diversion for a construction project a misinterpretation by Lab staff of the Mandatory Minimum Penalties 90 Grace Period issued by the Central Valley Regional Water Quality Board.
Electrical conductivity was not analyzed. The Plant was diverted for a construction project and was not discharging from August 2nd to August 7th. The Lab staff believed that since the plant was not discharging. There was no effluent effect on the receiving water, and that sampling was not required.
TSS was not analyzed due to a plant diversion for a construction project a misinterpretation by Lab staff of the Mandatory Minimum Penalties 90 Grace Period issued by the Central Valley Regional Water Quality Board.
Dissolved Oxygen was not analyzed. The Plant was diverted for a construction project and was not discharging from August 2nd to August 7th. The Lab staff believed that since the plant was not discharging. There was no effluent effect on the receiving water, and that sampling was not required.
Temperature was not analyzed. The Plant was diverted for a construction project and was not discharging from August 2nd to August 7th. The Lab staff believed that since the plant was not discharging. There was no effluent effect on the receiving water, and that sampling was not required.
Turbidity was not analyzed. The Plant was diverted for a construction project and was not discharging from August 2nd to August 7th. The Lab staff believed that since the plant was not discharging. There was no effluent effect on the receiving water, and that sampling was not required.
pH was not analyzed. The Plant was diverted for a construction project and was not discharging from August 2nd to August 7th. The Lab staff believed that since the plant was not discharging. There was no effluent effect on the receiving water, that sampling was not required.
TSS was not analyzed due to plant diversion for a construction project and a misinterpretation by Lab staff of the Mandatory Minimum Penalties 90 Grace Period issued by the Central Valley Regional Water Quality Board.
Turbidity was not analyzed. The Plant was diverted for a construction project and was not discharging from August 2nd to August 7th. The Lab staff believed that since the plant was not discharging. There was no effluent effect on the receiving water, and that sampling was not required.
BOD was not analyzed due to a plant diversion for a construction project a misinterpretation by Lab staff of the Mandatory Minimum Penalties 90 Grace Period issued by the Central Valley Regional Water Quality Board.
Dissolved Oxygen was not analyzed. The Plant was diverted for a construction project and was not discharging from August 2nd to August 7th. The Lab staff believed that since the plant was not discharging. There was no effluent effect on the receiving water, and that sampling was not required. |
All future construction projects that involve any type of flow diversion shall require a special plant staff meeting focused solely on the topic of sampling requirements. |
Violation |
B |
eSMR |
1092118 |
06/30/2021 |
OEV |
Total Coliform 7-Day Median limit is 23 MPN/100 mL and reported value was 900 MPN/100 mL at EFF-001. |
Treatment Plant Operators have calibrated the new chlorinators and sulfonators as well as adjusted chemical doses to meet effluent limitations. |
Violation |
B |
eSMR |
1092119 |
06/30/2021 |
OEV |
Total Coliform Daily Maximum limit is 500 MPN/100 mL and reported value was 900 MPN/100 mL at EFF-001. |
Treatment Plant Operators have calibrated the new chlorinators and sulfonators as well as adjusted chemical doses to meet effluent limitations. |
Violation |
B |
eSMR |
1087792 |
02/23/2021 |
OEV |
Total Coliform 7-Day Median limit is 23.0 MPN/100 mL and reported value was 30.0 MPN/100 mL at EFF-001. |
Operations staff has taken steps to augment chemical treatment throughout the process to assure proper disinfection. Including increasing the chlorine residual at the filter influent trough to 2mg/L and maintaining an effluent free chlorine level of 2.5mg/L at 2:30pm each day. Since these operational changes have been made coliform results have resulted in <2 results. |
Violation |
B |
eSMR |
1087791 |
02/16/2021 |
OEV |
Total Coliform 7-Day Median limit is 23.0 MPN/100 mL and reported value was 50.0 MPN/100 mL at EFF-001. |
Operations staff has taken steps to augment chemical treatment throughout the process to assure proper disinfection. Including increasing the chlorine residual at the filter influent trough to 2mg/L and maintaining an effluent free chlorine level of 2.5mg/L at 2:30pm each day. |
Violation |
B |
eSMR |
1084464 |
12/21/2020 |
OEV |
Total Coliform 7-Day Median limit is 23 MPN/100 mL and reported value was 34 MPN/100 mL at EFF-001. |
Total residual chlorine will be increased to 1.5-2.0mg/L. Also the sample location will be cleaned my frequently and the valve at the sample point will be exercised to release and solids that may build up. |
Violation |
U |
eSMR |
1084465 |
12/14/2020 |
OEV |
Total Coliform 7-Day Median limit is 23 MPN/100 mL and reported value was 30 MPN/100 mL at EFF-001. |
Chlorine dose will be increased to 1.5-2.0mg/L. Sample location will be cleaned more thoroughly and the valve will be exercised to release any solid build up. |
Violation |
U |
eSMR |
1085063 |
11/30/2020 |
DMON |
Dissolved Oxygen was not sampled twice in November 2020 as required. Only one sample was taken this month on 11/5/20. The Lab Analyst who performs this analysis was out after a COVID-19 exposure. |
A digital display showing all permit required analyses will be installed in the plant control room to illustrate all required analyses each month. These duties will be completed by other City of Redding Lab staff if Stillwater's Lab staff cannot complete the tests due to illness, absence or other issues. |
Violation |
U |
eSMR |
1071306 |
01/13/2020 |
OEV |
Total Coliform 7-Day Median limit is 23 MPN/100 mL and reported value was 50 MPN/100 mL at EFF-001. |
Operators have taken two clarifiers out of service and reduced the mixed-liquor suspended solids, and this seems to have corrected the problem. Following these process changes, effluent coliform returned to permitted levels for the remainder of the month. |
Violation |
U |
eSMR |