Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
1142096 |
03/27/2025 |
OEV |
Flow Daily Discharge limit is 0.021 MGD and reported value was 0.029 MGD. |
Salt Wells Maintenance Crew replaced the float valve on the HVAC system, and the system is back to normal operations. |
Violation |
B |
Report |
1142095 |
03/26/2025 |
OEV |
Flow Daily Discharge limit is 0.021 MGD and reported value was 0.0316 MGD. |
Salt Wells Maintenance Crew replaced the valve, and the system is back to normal operations. |
Violation |
B |
Report |
1123191 |
12/06/2023 |
OEV |
Flow Daily Discharge limit is 0.021 MGD and reported value was 0.0212 MGD. |
Construction management was flushing new waterlines. Construction Management was informed on SW WWTF permit requirements on effluent discharge limitations. |
Violation |
B |
Report |
1118480 |
05/01/2023 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.0295 MGD. |
Discharger reported in the SMR that the Construction Management Team has been notified of effluent limitations and will notify Environmental Management Division or Utilities and Energy Management Team if future projects have similar requirements. |
Violation |
B |
Report |
1115203 |
10/07/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.035 MGD. |
As per Discharger, Continue to monitor Flow. |
Violation |
B |
Report |
1115202 |
10/05/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.029 MGD. |
Discharger reported in the SMR to continue to monitor flow. |
Violation |
B |
Report |
1118855 |
09/11/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.029 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118854 |
09/09/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.027 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118853 |
09/08/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.027 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118852 |
09/07/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118851 |
09/06/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118850 |
09/05/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.022 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118849 |
09/04/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118848 |
09/03/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.025 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118847 |
09/02/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.026 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118846 |
09/01/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118845 |
08/31/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118844 |
08/30/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118843 |
08/29/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118842 |
08/28/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118841 |
08/27/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118840 |
08/26/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118839 |
08/25/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1118838 |
08/24/2022 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. |
|
Violation |
B |
Report |
1115190 |
06/13/2022 |
OEV |
Flow Daily Maximum limit is 0.021 GPD and reported value was 0.028 GPD. |
The completion of annual industrial equipment maintenance has eliminated the excess wastewater. Discharger working with RWCQB to include industrial wastewater sources and increased water volume. |
Violation |
B |
Report |
1115192 |
06/12/2022 |
OEV |
Flow Daily Maximum limit is 0.021 GPD and reported value was 0.025 GPD. |
The completion of annual industrial equipment maintenance has eliminated the excess wastewater. Discharger working with RWCQB to include industrial wastewater sources and increased water volume. |
Violation |
B |
Report |
1115188 |
06/11/2022 |
OEV |
Flow Daily Maximum limit is 0.021 GPD and reported value was 0.026 GPD. |
Discharger reported in the SMR that discharger is working with the Lahontan Water Board to modify the Lahontan Water Board permit to allow a co-mingle discharge of industrial wastewater and domestic wastewater to the domestic wastewater ponds and to increase the total effluent flow of co-mingle discharge to the evaporation-percolation ponds.
|
Violation |
B |
Report |
1118242 |
03/30/2022 |
LREP |
Submittal Periods, monitoring reports shall be submitted to the Regional Board by the 15th day of the month following each quarter. Violating Board order: 94-53 MRP section II.C. |
Discharger did not propose or identify any corrective actions taken. |
Violation |
B |
Report |
1097661 |
09/30/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.030 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097660 |
09/29/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.030 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097659 |
09/28/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.029 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097658 |
09/27/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.031 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097657 |
09/26/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.029 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097656 |
09/25/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.029 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097655 |
09/24/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.030 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097654 |
09/23/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.028 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097653 |
09/22/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097652 |
09/21/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.022 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097651 |
09/20/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.022 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097650 |
09/19/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.022 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097649 |
09/18/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097648 |
09/16/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.026 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097647 |
09/15/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097646 |
09/14/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097645 |
09/13/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.025 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097644 |
09/12/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.025 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1118856 |
09/12/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.029 MGD. |
Technician corrected consistent evaporation cooler discharge on 09/13/2022. |
Violation |
B |
Report |
1097643 |
09/11/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.024 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097642 |
09/10/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.025 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097640 |
09/09/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.025 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097641 |
09/08/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.026 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097639 |
09/07/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097638 |
09/06/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097636 |
09/05/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.022 MGD. |
Discharger reported in the SMR that discharger is working with the Lahontan Water Board to modify the Lahontan Water Board permit to allow a co-mingle discharge of industrial wastewater and domestic wastewater to the domestic wastewater ponds and to increase the total effluent flow of co-mingle discharge to the evaporation-percolation ponds. |
Violation |
B |
Report |
1097635 |
09/04/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.022 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097634 |
09/03/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097633 |
09/02/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097555 |
09/01/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. |
Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097664 |
08/31/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097663 |
07/20/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.023 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1097662 |
07/19/2021 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.025 MGD. |
Discharger wants to work with RWQCB for a permit modification to include both domestic and industrial wastewater and an increase to the discharge limit. Review septic system design to verify if design capacity is limited to 21,000 gallons per day. Dischargers have identified additional cooling towers which are discharging to the septic system. Construction activities increase the area population and water use. |
Violation |
B |
Report |
1092841 |
06/09/2021 |
UAUTHDISC |
Unauthorized discharge of noncontact cooling water to two domestic wastewater evaporation-percolation ponds Violating Board Order 6-94-53 WDR section I.C.6. |
Water Board and Navy staff are in ongoing discussions and are working collaboratively to develop a corrective action that addresses this violation and brings back the facility into compliance. |
Violation |
B |
Inspection |
1097631 |
07/16/2020 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.0215 MGD. |
Discharger reported in the SMR that the Navy and Water Board are working together to determine a way forward. |
Violation |
B |
Report |
1097630 |
07/15/2020 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.0261 MGD. |
Discharger reported in the SMR that the Navy and Water Board are working together to determine a way forward. |
Violation |
B |
Report |
1097629 |
07/14/2020 |
OEV |
Flow Daily Maximum limit is 0.021 MGD and reported value was 0.0262 MGD. |
Discharger reported in the SMR that the Navy and Water Board are working together to determine a way forward. |
Violation |
B |
Report |
1097628 |
07/13/2020 |
OEV |
Flow 24-hour Average limit is 0.021 MGD and reported value was 0.0272 MGD. |
Discharger reported in the SMR that the Navy and Water Board are working together to determine a way forward. |
Violation |
B |
Report |