Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID 253123
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
5S 253123 Rock Creek Solid Waste Facility Land fill 12021 Hunt Milton, CA, 95230 Calaveras

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
353238 Person Jonathan Mitchell Contact 04/08/2011
7272 Organization Calaveras Cnty PWD Owner County Agency 05/14/2001
Total Related Parties: 2

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
439738 Co-Permitee SB SLIC 2019-0006-DWQ 5B050302002 03/20/2019 Active N
417039 WDR 5S LFOPER R5-2017-0108 5B050302002 10/20/2017 10/20/2022 Active N
378954 WDR 5S LFOPER R5-2011-0029 5B050302002 04/08/2011 04/08/2016 Historical N
312343 WDR 5S LFOPER R5-2005-0100 5B050302002 06/24/2005 06/23/2010 Historical N
148584 WDR 5S LNDISP 01-149 5B050302002 06/14/2001 06/23/2005 Historical N
146887 WDR 5S LNDISP 97-199 5B050302002 09/19/1997 09/17/2007 Historical N
141345 WDR 5S LNDISP 95-047 5B050302002 02/24/1995 02/24/2005 Historical N
140730 WDR 5S LNDISP 90-232 5B050302002 08/10/1990 08/07/2000 Historical Y
141377 WDR 5S LNDISP 89-160 5B050302002 09/22/1989 09/22/1994 Historical N
Total Reg Measures: 9

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
1126405 01/23/2024 Order Conditions Violation 1 - Unauthorized discharge of contact storm water/leachate to surface waters of the state: 1. Prohibition 2 of the WDRs states; The discharge of wastes outside of a Unit or portions of a Unit specifically designed for their containment is prohibited. 2. Prohibition 10 of the WDRs states; The discharge of solid or liquid waste or leachate to surface waters, surface water drainage courses, or groundwater is prohibited. 3. Discharge Specification B.3 of the WDRs states; During wet weather conditions, the facility shall be operated and graded to minimize leachate generation. According to the Discharger, repairs to the damaged Phase III-A solid WMU containment berm were complete by 30 January 2024. However, the extent of the release and its impact must now be assessed, and if needed corrective action implemented. Therefore, to assess potential impacts to surface water downstream of the Phase III-A solid WMU release point, surface water samples are to be collected from Sedimentation Basins #1 and #2. Each of these samples are to be analyzed for VOC, SVOCs, arsenic and the other Monitoring Parameters outlined in Table 1 of the MRP, which includes total dissolved solids, chloride, carbonate, bicarbonate, nitrate - nitrogen, sulfate, calcium, magnesium, potassium, and sodium. The laboratory results from this analysis are to be submitted along with a summarized table of the results comparing them to the previous results provided in your 13 March 2023 email in a report due no later than 30 May 2024. Violation B Report
1126406 01/03/2024 Order Conditions Violation 1 -Unauthorized discharge of waste/leachate into the newly completed Phase III Class II surface impoundment without final approval of the WMU by Central Valley Water Board staff: 1. Design And Construction Specifications D.12 of the WDRs states: The Discharger shall submit a final report documenting construction of any new lined WMU for review and approval prior to discharging wastes to the WMU. The Discharger must also submit an additional technical report as part of its final construction report demonstrates that certifies that any testing required and any limitations or additional requirements specified in the final closure cover or base and side slope liner’s slope stability analysis report was complied with during construction in order to validate the slope stability analysis report conclusions. 2. Section 20310(e) of Title 27 states: Containment structures shall be designed by, and construction shall be supervised and certified by, a registered civil engineer or a certified engineering geologist. Units shall receive a final inspection and approval of the construction by RWQCB or SWRCB staff before use of the Unit commences. 1. Continue weekly reporting of the leachate and freeboard levels in the Phase III Class II surface impoundment as well as: 1) the level of leachate in the leak detection system (LSD), 2) volume of leachate removed from the LDS, 3) the action leakage rate, 4) the level of leachate detected within and volume removed from the surface impoundment lysimeter, and 5) the volume of leachate pumped into the Phase III Class II surface impoundment until the January 2024 CQA Report is approved by Central Valley Water Board staff. 2. Addtinaly, since receiving final CQA approval from Central Valley Water Board staff is often an iterative process, the Discharger must continue to work in good faith with the Central Valley Water Board’s Permitting Unit to achieve approval of both the Phase III-A solid WMU and the Phase III Class II surface impoundment. Violation B Report
1126407 01/03/2024 Order Conditions Violation 3 - A buildup of hydraulic head on the underlying Primary liner of the Phase III-A solid WMU. 1. Design And Construction Specifications D.6 of the WDRs states in part: LCRSs shall be designed, constructed, and maintained to collect twice the anticipated daily volume of leachate and gas condensate generated by each Class II surface impoundment and/or landfill WMU and to prevent the buildup of hydraulic head on the underlying liner at any time. 2. Design And Construction Specifications D.8 of the WDRs states: The LCRS for each Class II unit shall be operated and maintained to collect twice the anticipated daily volume of leachate and gas condensate generated by the WMU and to prevent the buildup of hydraulic head on the underlying liner at any time. The depth of fluid in the LCRS sump shall be kept at the minimum needed to ensure efficient pump operation. 3. Section 20340(c) of Title 27 states: Head Buildup -The RWQCB shall specify design and operating conditions in WDRs to ensure that there is no buildup of hydraulic head on the liner. The depth of fluid in the collection sump shall be kept at the minimum needed to ensure efficient pump operation. 1. Continue weekly reporting, by email, of the leachate level in and the volume of leachate removed from the Phase III-A solid WMU, which includes reporting for: 1) The primary LCRS, 2) the secondary LCRS and 3) the sub drain system, until the January 2024 CQA Report is approved by Central Valley Water Board staff. 2. Submit a work plan no later than 1 June 2024 to make improvements to the pumps, piping runs, and/or leachate collection sumps of the Phase III-A solid WMU’s LCRS to ensure it can be operated and maintained to collect twice the anticipated daily volume of leachate and gas condensate generated by the Facility’s WMUs to prevent a buildup of hydraulic head on the underlying primary liner, as required by the WDRs. 3. Submit a report no later than 30 September 2024 demonstrating the approved improvements have restored full compliance with the WDRs. Included in the report shall be photographs of the completed improvements approved by the Central Valley Water Board staff. The documentation should include as-built drawings as well as the amended water balance that demonstrates that the capacity of each pipe, piping run, LCRS sump, gas condensate sump have been properly sized to meet the requirements in the WDRs and Title 27. Violation B Report
1122917 11/20/2023 Order Conditions Unauthorized discharge of waste/leachate into the under-construction Phase III A solid WMU without 1) The submittal of a Final Construction Quality Assurance (CQA) Completion Report, 2) The completion of a final Central Valley Water Board inspection, or 3) Final approval by Central Valley Water Board staff of the Phase III A solid WMU prior to discharge. 1) Submit a Final Construction Quality Assurance (CQA) Completion Report for the Phase III-A solid WMU, completed in accordance with Section 20324 of Title 27, as required by Construction Specifications D.12 of the WDR and Section 20310(e) of Title 27. 2) Begin monitoring the Phase III-A solid waste MWU and all required leachate, soil gas, vadose zone, and groundwater monitoring points associated with the Facility in accordance with all applicable sections of the WDRs and MRP. 3) Begin weekly reporting of the leachate level in and the volume of leachate removed from the Phase III A and all solid WMU: 1) LCRS systems, 2) Secondary geocomposite drainage layers, and 3) Lysimeters. Further, should Central Valley Water Board permitting staff’s review of the final Phase III CQA document or their final inspection reveal that the Phase III A solid WMU was not constructed as required and conditionally approved, the removal and reinstallation of the entire Phase III A solid WMU may be necessary to correct any identified construction defects. Violation B Report
1088428 02/10/2021 Order Conditions Observed Violation: 1. The Discharger has failed to place an adequate layer of daily cover over waste at two separate locations outside the active working face of the landfill in violation of Title 27 Section 20680 (a), which states: Except as provided in ¶(b), (f) and §20690, the owners or operators of all municipal solid waste landfill units shall cover disposed solid waste with a minimum of six inches of compacted earthen material at the end of each operating day, or at more frequent intervals if necessary, to control vectors, fires, odors, blowing litter, and scavenging. Violation B Inspection
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 5 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Order Conditions = Order Conditions

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
455955 Notice of Violation 12/27/2023 Historical
445263 Notice of Violation 04/07/2021 Historical
445261 Notice of Violation 04/07/2021 Historical
422554 Notice of Violation 06/07/2018 Historical
422557 Notice of Violation 02/24/2018 Historical
413310 13308 Enforcement Action null 05/17/2017 Active
413313 Notice of Violation 05/17/2017 Historical
397795 Notice of Violation 06/13/2014 Historical
373838 Notice of Violation 04/20/2010 Historical
333745 Notice of Violation null 10/16/2007 Historical
237136 Notice of Violation 08/20/2001 Historical
231731 Staff Enforcement Letter 01/05/2001 Historical
230929 Staff Enforcement Letter 06/28/2000 Historical
231645 Staff Enforcement Letter 02/08/2000 Historical
232090 Staff Enforcement Letter 01/11/2000 Historical
230501 Staff Enforcement Letter 10/25/1999 Historical
232091 Staff Enforcement Letter 10/25/1999 Historical
Total Enf Actions: 17

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
57652286 B Type compliance inspection Paul Sanders 09/25/2024 N 0 Download
54339366 B Type compliance inspection Vinoo Jain 01/10/2024 N 0 [Attachments]
53307575 B Type compliance inspection Paul Sanders 09/13/2023 N 0 N/A
46502862 B Type compliance inspection Paul Sanders 12/06/2021 N 0 N/A
43634177 B Type compliance inspection Paul Sanders 02/10/2021 N 0 N/A
32748508 B Type compliance inspection Paul Sanders 05/23/2018 N 0 N/A
27857352 B Type compliance inspection Paul Sanders 03/07/2017 N 0 N/A
28240033 B Type compliance inspection Vinoo Jain 03/07/2017 N 0 [Attachments]
20979445 B Type compliance inspection Paul Sanders 06/16/2015 N 0 N/A
16308661 B Type compliance inspection Paul Sanders 05/08/2014 N 0 N/A
10595642 B Type compliance inspection Bill Brattain 12/05/2012 N 0 [Attachments]
5743952 B Type compliance inspection Bill Brattain 09/27/2011 N 0 [Attachments]
1561984 B Type compliance inspection Mary Boyd 12/04/2008 Y 0 N/A
1059430 B Type compliance inspection Mary Boyd 05/02/2007 Y 0 N/A
853347 B Type compliance inspection Mary Boyd 11/09/2006 N 0 N/A
718652 B Type compliance inspection Molly White 11/10/2005 N 0 [Attachments]
718672 B Type compliance inspection Molly White 11/10/2005 N 0 [Attachments]
337918 B Type compliance inspection Molly White 03/16/2005 Y 0 N/A
336382 B Type compliance inspection Kim Schwab 11/19/2004 Y 0 N/A
334380 B Type compliance inspection Kim Schwab 05/25/2004 Y 0 N/A
329672 B Type compliance inspection Kim Schwab 05/14/2003 Y 0 N/A
309148 B Type compliance inspection Catherine Hernandez 05/28/2002 Y 0 N/A
309147 B Type compliance inspection Polly Lowry 05/08/2001 Y 0 N/A
309146 B Type compliance inspection Polly Lowry 11/10/1999 Y 0 N/A
309159 B Type compliance inspection Polly Lowry 07/30/1998 Y 0 N/A
309149 B Type compliance inspection Kim Schwab 09/23/1997 Y 0 N/A
309151 B Type compliance inspection Kim Schwab 08/27/1997 Y 0 N/A
309153 B Type compliance inspection Kim Schwab 10/03/1996 Y 0 N/A
309150 B Type compliance inspection Kim Schwab 05/06/1996 Y 0 N/A
309152 Miscellaneous inspection Kim Schwab 06/29/1995 Y 0 N/A
309154 B Type compliance inspection Kim Schwab 08/19/1994 Y 0 N/A
309156 B Type compliance inspection Kim Schwab 06/07/1994 Y 0 N/A
309155 B Type compliance inspection Kim Schwab 06/06/1994 Y 0 N/A
309157 B Type compliance inspection Kim Schwab 01/21/1994 Y 0 N/A
309158 B Type compliance inspection Kim Schwab 04/28/1993 Y 0 N/A
Total Inspections: 35 Last Inspection: 09/25/2024
  
The current report was generated with data as of: 11/14/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page