Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
1141788 |
02/17/2025 |
OEV |
Fecal Coliform 1-Hour Average (Mean) and reported value was 540 MPN/100 mL at A2. |
No Corrective Action |
Violation |
U |
eSMR |
1138552 |
11/05/2024 |
Surface Water |
A4 exceeded the single sample maximum for fecal coliform. |
No Corrective Action |
Violation |
U |
eSMR |
1137011 |
10/29/2024 |
UAUTHDISC |
The effluent pipeline had a leak, which caused the vault to gradually fill with water. The operator on duty
discovered the issue and installed a sump pump in the vault. For a couple of hours, the sump pump successfully
managed to keep up with the leak. However, the leak eventually overwhelmed both the vault and the sump pump,
resulting in approximately 800 to 900 gallons of water spilling into the surrounding rocks. |
|
Violation |
B |
Report |
1139559 |
10/02/2024 |
Deficient Reporting |
Attachment E, sections IV.C.1.a, IV.C.2.a, IV.C.3.a, IV.D.1.a, and IV.D.2.a states that results from sediment monitoring, sediment toxicity sampling, benthic community sampling, fish and invertebrate trawls, fish muscle tissue analyses were due no later than 180 days prior to the expiration date of this Order. The expiration date is March 31, 2025. |
|
Violation |
B |
Report |
1131417 |
08/15/2024 |
LREP |
The report was due August 1, 2024. The Discharger submitted the report 14 days late on August 15, 2024. |
|
Violation |
B |
Report |
1131418 |
08/12/2024 |
LREP |
The report was due August 1, 2024. The Discharger submitted the report 11 days late on August 12, 2024. |
|
Violation |
B |
Report |
1131498 |
08/12/2024 |
LREP |
The report was due August 1, 2024. The Discharger submitted the report 11 days late on August 12, 2024. |
|
Violation |
B |
Report |
1129830 |
02/22/2024 |
LREP |
Report was due February 19, 2024, which was a state holiday. February 20 was the next business day. The report was submitted on February 22, two days after the deadline. |
|
Violation |
B |
Report |
1125321 |
02/07/2024 |
Surface Water |
S3 exceeded the single sample maximum for fecal coliform. |
Sample was within 72 hours after a rain event greater than 0.1 inch. |
Violation |
U |
eSMR |
1125322 |
02/07/2024 |
Surface Water |
S4 exceeded the single sample maximum for fecal coliform. |
Sample was within 72 hours after a rain event greater than 0.1 inch. |
Violation |
U |
eSMR |
1125323 |
02/07/2024 |
Surface Water |
S5 exceeded the single sample maximum for fecal coliform. |
Sample was within 72 hours after a rain event greater than 0.1 inch. |
Violation |
U |
eSMR |
1124341 |
01/23/2024 |
Surface Water |
S1 exceeded the single sample maximum for fecal coliform. |
Sample was within 72 hours after a rain event greater than 0.1 inch. |
Violation |
U |
eSMR |
1124339 |
01/23/2024 |
Surface Water |
S2 exceeded the single sample maximum for fecal coliform. |
Sample was within 72 hours after a rain event greater than 0.1 inch. |
Violation |
U |
eSMR |
1124340 |
01/23/2024 |
Surface Water |
S3 exceeded the single sample maximum for fecal coliform. |
Sample was within 72 hours after a rain event greater than 0.1 inch. |
Violation |
U |
eSMR |
1124342 |
01/23/2024 |
Surface Water |
S5 exceeded the single sample maximum for fecal coliform. |
Sample was within 72 hours after a rain event greater than 0.1 inch. |
Violation |
U |
eSMR |
1123625 |
10/16/2023 |
Surface Water |
A2-Mid depth sample exceeded the single maximum limitation for fecal coliform. |
No Corrective Action |
Violation |
U |
eSMR |
1120679 |
09/22/2023 |
Surface Water |
S1 was over fecal coliform limit of 200 MPN/100mL |
sample was collect within 72 hours of a qualifying rain event |
Violation |
U |
eSMR |
1121489 |
09/11/2023 |
Surface Water |
A2-Mid was over the fecal coliform limit |
no corrective action |
Violation |
U |
eSMR |
1120680 |
08/22/2023 |
Surface Water |
S1 was over enterococcus limit of 100 MPN/100mL |
Sample was collect within 72 hours of a qualifying rain event |
Violation |
U |
eSMR |
1120682 |
08/22/2023 |
Surface Water |
S2 was over enterococcus limit of 100 MPN/100mL |
Sample was collect within 72 hours of a qualifying rain event |
Violation |
U |
eSMR |
1120681 |
08/22/2023 |
Surface Water |
S2 was over fecal coliform limit of 200 MPN/100mL |
Sample was collect within 72 hours of a qualifying rain event |
Violation |
U |
eSMR |
1120673 |
08/22/2023 |
Surface Water |
S3 was over enterococcus limit of 100 MPN/100mL |
Sample was collect within 72 hours of a qualifying rain event |
Violation |
U |
eSMR |
1120683 |
08/22/2023 |
Surface Water |
S3 was over fecal coliform limit of 200 MPN/100mL |
Sample was collect within 72 hours of a qualifying rain event |
Violation |
U |
eSMR |
1120675 |
08/22/2023 |
Surface Water |
S4 geomean was over 30 MPN/100mL |
Sample was collect within 72 hours of a qualifying rain event
|
Violation |
U |
eSMR |
1120677 |
08/22/2023 |
Surface Water |
S4 was over enterococcus limit of 100 MPN/100mL |
Sample was collect within 72 hours of a qualifying rain event |
Violation |
U |
eSMR |
1120676 |
08/22/2023 |
Surface Water |
S4 was over fecal coliform limit of 200 MPN/100mL |
Sample was collect within 72 hours of a qualifying rain event |
Violation |
U |
eSMR |
1120684 |
08/22/2023 |
Surface Water |
S5 was over enterococcus limit of 100 MPN/100mL |
Sample was collect within 72 hours of a qualifying rain event |
Violation |
U |
eSMR |
1120678 |
08/22/2023 |
Surface Water |
S5 was over fecal coliform limit of 200 MPN/100mL |
Sample was collect within 72 hours of a qualifying rain event |
Violation |
U |
eSMR |
1120674 |
08/07/2023 |
Surface Water |
S4 was over fecal coliform limit of 200 MPN/100mL |
The exceedances from 08/07/23 at the S-4 location were most likely due to the high tide surf mixing with riprap rocks used for erosion protection. |
Violation |
U |
eSMR |
1116153 |
03/27/2023 |
Surface Water |
Geomean for entero exceeded |
All exceedances were due to the sample being taken with in 72 hours after the precipitation was greater than 0.10 inch and/or the wastewater spill that discharged into the Loma Alta Creek on 03/15/23. |
Violation |
U |
eSMR |
1116149 |
03/20/2023 |
Surface Water |
Geomean for entero exceeded at S3 |
All exceedances were due to the sample being taken with in 72 hours after the precipitation was greater than 0.10 inch and/or the wastewater spill that discharged into the Loma Alta Creek on 03/15/23. |
Violation |
U |
eSMR |
1116151 |
03/20/2023 |
Surface Water |
fecal exceedance at S4 |
sample was taken with in 72 hours after the precipitation was greater than 0.10 inch |
Violation |
U |
eSMR |
1116154 |
03/19/2023 |
Surface Water |
Geomean for fecal exceeded at S3 |
All exceedances were due to the sample being taken with in 72 hours after the precipitation was greater than 0.10 inch and/or the wastewater spill that discharged into the Loma Alta Creek on 03/15/23. |
Violation |
U |
eSMR |
1116152 |
03/18/2023 |
Surface Water |
Geomean for entero exceeded |
All exceedances were due to the sample being taken with in 72 hours after the precipitation was greater than 0.10 inch and/or the wastewater spill that discharged into the Loma Alta Creek on 03/15/23. |
Violation |
U |
eSMR |
1116157 |
03/18/2023 |
Surface Water |
Geomean for fecal exceeded at S3 |
All exceedances were due to the sample being taken with in 72 hours after the precipitation was greater than 0.10 inch and/or the wastewater spill that discharged into the Loma Alta Creek on 03/15/23. |
Violation |
U |
eSMR |
1116150 |
03/17/2023 |
Surface Water |
geomean for entro exceeded at S3 |
All exceedances were due to the sample being taken with in 72 hours after the precipitation was greater than 0.10 inch and/or the wastewater spill that discharged into the Loma Alta Creek on 03/15/23. |
Violation |
U |
eSMR |
1116156 |
03/16/2023 |
Surface Water |
Enteroccocus exceeded at S3 |
All exceedances were due to the sample being taken with in 72 hours after the precipitation was greater than 0.10 inch and/or the wastewater spill that discharged into the Loma Alta Creek on 03/15/23. |
Violation |
U |
eSMR |
1116148 |
03/16/2023 |
Surface Water |
Exceeded limit for fecal coiform at S2 |
All exceedances were due to the sample being taken with in 72 hours after the precipitation was greater than 0.10 inch and/or the wastewater spill that discharged into the Loma Alta Creek on 03/15/23. |
Violation |
U |
eSMR |
1116158 |
03/16/2023 |
Surface Water |
Fecal coliform exceeded limit at S2 |
All exceedances were due to the sample being taken with in 72 hours after the precipitation was greater than 0.10 inch and/or the wastewater spill that discharged into the Loma Alta Creek on 03/15/23. |
Violation |
U |
eSMR |
1131692 |
03/15/2023 |
UAUTHDISC |
"On 3/15/2023 there was a heavy rain event. This cause a spill at La Salina WWTP and an exceedance of the SS instantaneous maximum limit." |
|
Violation |
B |
Report |
1116146 |
03/15/2023 |
Surface Water |
Exceeded limit for enterococcus at S2 |
All exceedances were due to the sample being taken with in 72 hours after the precipitation was greater than 0.10 inch and/or the wastewater spill that discharged into the Loma Alta Creek on 03/15/23 |
Violation |
U |
eSMR |
1116147 |
03/15/2023 |
Surface Water |
Exceeded limit for enterococcus at S3 |
All exceedances were due to the sample being taken with in 72 hours after the precipitation was greater than 0.10 inch and/or the wastewater spill that discharged into the Loma Alta Creek on 03/15/23 |
Violation |
U |
eSMR |
1116155 |
03/15/2023 |
Surface Water |
fecal coliform exceeded at S3 |
All exceedances were due to the sample being taken with in 72 hours after the precipitation was greater than 0.10 inch and/or the wastewater spill that discharged into the Loma Alta Creek on 03/15/23. |
Violation |
U |
eSMR |
1113893 |
01/17/2023 |
Surface Water |
S-2 location exceeded the single sample maximum limitation for fecal coliforms |
The sample was taken with in 72 hours after the precipitation was greater than 0.10 inch |
Violation |
U |
eSMR |
1113892 |
01/17/2023 |
Surface Water |
S-3 location exceeded the single sample maximum limitation for fecal coliforms |
The sample was taken with in 72 hours after the precipitation was greater than 0.10 inch |
Violation |
U |
eSMR |
1113894 |
01/17/2023 |
Surface Water |
S-4 location exceeded the single sample maximum limitation for fecal coliforms |
The sample was taken with in 72 hours after the precipitation was greater than 0.10 inch |
Violation |
U |
eSMR |
1113896 |
01/17/2023 |
Surface Water |
S-5 location exceeded the single sample maximum limitation for fecal coliforms |
The sample was taken with in 72 hours after the precipitation was greater than 0.10 inch |
Violation |
U |
eSMR |
1113895 |
01/03/2023 |
Surface Water |
S-3 location exceeded the single sample maximum limitation for fecal coliforms |
The sample was taken with in 72 hours after the precipitation was greater than 0.10 inch |
Violation |
U |
eSMR |
1112688 |
12/12/2022 |
Surface Water |
S1 exceeded the single sample maximum for fecal coliform. |
Sample was within 72 hours after a rain event greater than 0.1 inch. |
Violation |
U |
eSMR |
1112565 |
11/14/2022 |
Surface Water |
Fecal coliform was over the maximum limit |
Analyzed HF183 as required. |
Violation |
U |
eSMR |
1112566 |
11/14/2022 |
Surface Water |
Fecal coliform was over the maximum limit |
HF183 was analyzed as required |
Violation |
U |
eSMR |
1112567 |
11/14/2022 |
Surface Water |
Fecal coliform was over the maximum limit |
HF183 was analyzed as required |
Violation |
U |
eSMR |
1109691 |
09/26/2022 |
Surface Water |
The 09/26/22 S-4 location exceeded the single sample maximum limitation for fecal coliforms. *** Dismissed:There is currently not enough information to confirm that Oceanside OO was the cause of this violation. |
This was most likely due to the high tide surf mixing
with riprap rocks used for erosion protection. |
Violation |
B |
eSMR |
1109720 |
07/25/2022 |
Surface Water |
The 07/25/22 A-2 mid depth location exceeded the single sample maximum for fecal coliforms.
|
None identified |
Violation |
B |
eSMR |
1099934 |
11/16/2021 |
Surface Water |
The 11/16/21 A-2 mid depth location exceeded the single sample maximum for fecal coliforms. |
HF183 was analyzed, no atypical observations at the time. |
Violation |
B |
eSMR |
1096114 |
07/19/2021 |
Surface Water |
The 07/19/21 S-3 exceeded the single sample limit for fecal coliforms. |
This exceedance may have been due to sampling within 72 hours of a rain event with precipitation greater than 0.10 inch. |
Violation |
U |
eSMR |
1096115 |
07/19/2021 |
Surface Water |
The 07/19/21 S-5 location exceeded the single sample limit for fecal coliforms. |
This exceedance may have been due to sampling within 72 hours of a rain event with precipitation greater than 0.10 inch. |
Violation |
U |
eSMR |
1092659 |
06/07/2021 |
Surface Water |
6/7/21 A-1 mid depth location exceeded the single sample maximum limit for fecal coliforms. This sample was collected within 72 hours of a rain event. |
HF183 was analyzed for the surface and mid depth for A-1. |
Violation |
B |
eSMR |
1075245 |
04/30/2020 |
DMON |
S1 was only sampled four times for fecal coliforms and enterococci in the month of April, was missed in error with the transition to the new Order. |
Laboratory staff reviewed the permit conditions and adjusted their sampling schedule. A reminder is also set to notify the staff to collect the fifth sample. |
Violation |
B |
eSMR |
1075246 |
04/30/2020 |
DMON |
S2 was only sampled four times for fecal coliforms and enterococci in the month of April, was missed in error with the transition to the new Order. |
Laboratory staff reviewed the permit conditions and adjusted their sampling schedule. A reminder is also set to notify the staff to collect the fifth sample. |
Violation |
B |
eSMR |
1075241 |
04/30/2020 |
DMON |
S3 was only sampled four times for fecal coliforms and enterococci in the month of April, was missed in error with the transition to the new Order. |
Laboratory staff reviewed the permit conditions and adjusted their sampling schedule. A reminder is also set to notify the staff to collect the fifth sample. |
Violation |
B |
eSMR |
1075242 |
04/30/2020 |
DMON |
S4 was only sampled four times for fecal coliforms and enterococci in the month of April, was missed in error with the transition to the new Order. |
Laboratory staff reviewed the permit conditions and adjusted their sampling schedule. A reminder is also set to notify the staff to collect the fifth sample. |
Violation |
B |
eSMR |
1075243 |
04/30/2020 |
DMON |
S5 was only sampled four times for fecal coliforms and enterococci in the month of April, was missed in error with the transition to the new Order. |
Laboratory staff reviewed the permit conditions and adjusted their sampling schedule. A reminder is also set to notify the staff to collect the fifth sample. |
Violation |
B |
eSMR |