Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID 242170
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
4 242170 Malibu Seafood Restaurant Restaurant 25653 Pacific Coast Malibu, CA, Los Angeles

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
527059 Person Patricia Roy Contact 02/04/2005
29720 Organization Malibu Management, LLC Owner Privately-Owned Business 11/25/2003
Total Related Parties: 2

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
194244 Enrollee - WDR 4 WDRMUNIENROTH 97-010-DWQ 4B197400037 02/04/2005 02/04/2020 Active N
Total Reg Measures: 1

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
1101322 10/15/2021 Deficient Reporting 3Q2021; Failure to include affirmation laboratory certification as required by MRP. Violation B Report
1101323 10/15/2021 Deficient Reporting 3Q2021; Failure to monitor all constituents for septic tank and disposal system in attachment A of the MRP as required by MRP. Violation B Report
1101320 07/15/2021 Deficient Reporting 2Q2021; Failure to include affirmation laboratory certification as required by MRP. Violation B Report
1101321 07/15/2021 Deficient Reporting 2Q2021; Failure to monitor all constituents for septic tank and disposal system in attachment A of the MRP as required by MRP. Violation B Report
1101318 04/15/2021 Deficient Reporting 1Q2021; Failure to include affirmation laboratory certification as required by MRP. Violation B Report
1101319 04/15/2021 Deficient Reporting 1Q2021; Failure to monitor all constituents for septic tank and disposal system in attachment A of the MRP as required by MRP. Violation B Report
1101314 01/30/2021 Deficient Reporting Annual 2020; Failure to include affirmation laboratory certification as required by MRP. Violation B Report
1101315 01/30/2021 Deficient Reporting Annual2020; Failure to monitor all constituents for septic tank and disposal system in attachment A of the MRP for the calendar year as required by MRP. Violation B Report
1101311 01/15/2021 Deficient Reporting 4Q2020; Failure to include affirmation laboratory certification as required by MRP.. Violation B Report
1101313 01/15/2021 Deficient Reporting 4Q2020; Failure to monitor all constituents for septic tank and disposal system in attachment A of the MRP as required by MRP. Violation B Report
1101306 10/15/2020 Deficient Reporting 3Q2020; Failure to include affirmation laboratory certification as required by MRP. Violation B Report
1101307 10/15/2020 Deficient Reporting 3Q2020; Failure to monitor all constituents for septic tank and disposal system in attachment A of the MRP as required by MRP. Violation B Report
1101308 10/15/2020 LREP 3Q 2020 Late report (10/16/2020) : The report was due 1 day late from due date (10/15/2020). Violation B Report
1101305 07/15/2020 Deficient Reporting 2Q2019; Failure to include affirmation laboratory certification as required by MRP. Violation B Report
1101304 07/15/2020 Deficient Reporting 2Q2020; Failure to monitor all constituents for septic tank and disposal system in attachment A of the MRP as required by MRP. Violation B Report
1101303 07/15/2020 LREP 2Q2020Late Report (10/16/2020): Monitoring Report received 93 days late from due date of 07/15/2020. Violation B Report
1101289 04/15/2020 Deficient Reporting 1Q2020; Failure to monitor all constituents for septic tank and disposal system in attachment A of the MRP as required by MRP. Violation B Report
1101290 04/15/2020 Deficient Reporting 4Q2020; Failure to include affirmation of laboratory certification as required by MRP. Violation B Report
1101291 04/15/2020 LREP 1Q2020 Late Report (10/15/2020): Monitoring Report received 184 days late from due date of 04/15/2020. Violation B Report
1101288 01/30/2020 Deficient Reporting Annual 2019; Failure to monitor all constituents for septic tank and disposal system in attachment A of the MRP for the calendar year as required by MRP. Violation B Report
1101287 01/30/2020 LREP Annual 2019 Late Report (10/16/2020): Monitoring Report received 260 days late from due date of 01/30/2020. Violation B Report
1101286 01/15/2020 Deficient Reporting 4Q2019; Failure to include affirmation of laboratory certification as required by MRP. Violation B Report
1101285 01/15/2020 Deficient Reporting 4Q2019; Failure to include statement of non compliance as required by MRP. Violation B Report
1101284 01/15/2020 Deficient Reporting 4Q2019; Failure to monitor all constituents for septic tank and disposal system in attachment A of the MRP as required by MRP. Violation B Report
1101283 10/15/2019 Deficient Reporting 3Q2019; Failure to include affirmation of Laboratory certification as required by MRP. Violation B Report
1101282 10/15/2019 Deficient Reporting 3Q2019; Failure to include summary of non compliance as required by MRP. Violation B Report
1101281 10/15/2019 Deficient Reporting 3Q2019; Failure to monitor all constituents for septic tank and disposal system in attachment A of the MRP as required by MRP. Violation B Report
1101269 07/15/2019 Deficient Reporting 2Q2019; Failure to include Non-compliance statement as required by MRP. Violation B Report
1101271 07/15/2019 Deficient Reporting 2Q2019; Failure to include affirmation of laboratory certification as required by MRP. Violation B Report
1101270 07/15/2019 Deficient Reporting 2Q2019; Failure to monitor all constituents for septic tank and disposal system in attachment A of the MRP as required by MRP. Violation B Report
1101268 07/15/2019 LREP 2Q2019 Late Report (08/13/2019): Monitoring Report received 19 days late from due date of 07/15/2019. Violation B Report
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 31 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
Deficient Reporting = Deficient Reporting LREP = Late Report

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
380135 Notice of Violation NOV 05/02/2011 Historical
Total Enf Actions: 1

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
49174956 B Type compliance inspection Emily Wong 08/11/2022 N 0 N/A
31785553 B Type compliance inspection Peter Raftery 02/27/2018 N 0 Download
328181 Prerequirement inspection Dionisia Rodriguez 01/14/2003 Y 0 N/A
Total Inspections: 3 Last Inspection: 08/11/2022
  
The current report was generated with data as of: 06/06/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page