Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
1119642 |
08/20/2023 |
UAUTHDISC |
Failure to comply with Order No. R9-2010-0004.
1. Landfill Operation Specifications D.7.e: Erosion Control. The Landfill cover must be maintained to minimize the percolation of liquids through waste.
2. Landfill Construction Specifications E.4.e: Slope Stability. The Discharger must design, construct, and maintain all containment structures so they are capable of containing waste, waste constituents, and degradation products of wastes to prevent water quality impacts from the discharges of waste at the Landfill.
3. Landfill Construction Specifications E.10.a: Landfill Cover. The Discharger must ensure that the intermediate cover is designed and constructed to minimize the percolation of liquids through waste.
4. Provisions G.5: proper Operation and Maintenance. The Discharger must properly operate and maintain all facilities and systems of treatment and control installed or used to achieve compliance with this Order.
5. Reporting Requirements H.11: Endangerment of Health and Environment. The Discharger must report any noncompliance that endangers human health or the environment. This information must be provided orally to the San Diego Water Board within 24-hours from the time the owner becomes aware of the circumstances. A written submission must also be provided within five days of the time the owner becomes aware of the circumstances.
6. Reporting Requirements H.12: Notification of Slope Failure. The Discharger must immediately notify the San Diego Water Board when a determination is made that a slope failure is occurring or has occurred at the Landfill. The Discharger must promptly repair any slope failure that affects or threatens the integrity or the performance of waste containment systems. |
|
Violation |
A |
Report |
1119643 |
08/20/2023 |
UAUTHDISC |
Unpermitted Discharge of a Pollutant to Waters of the U.S. in violation of the Federal Water Pollution Control Act, as amended (Clean Water Act), Porter-Cologne Water Quality Control Act, as amended, Water Quality Control Plan for the San Diego Basin, and Order No. R9-2010-0004. |
|
Violation |
A |
Report |
1115757 |
03/24/2023 |
Order Conditions |
Failure to comply with Order No. R9-2010-0004.
1. Landfill Operation Specifications D.7.e: Erosion Control. The Landfill cover must be maintained to minimize the percolation of liquids through waste.
2. Landfill Construction Specifications E.4.e: Slope Stability. The Discharger must design, construct, and maintain all containment structures so they are capable of containing waste, waste constituents, and degradation products of wastes to prevent water quality impacts from the discharges of waste at the Landfill.
3. Landfill Construction Specifications E.10.a: Landfill Cover. The Discharger must ensure that the intermediate cover is designed and constructed to minimize the percolation of liquids through waste.
4. Provisions G.5: proper Operation and Maintenance. The Discharger must properly operate and maintain all facilities and systems of treatment and control installed or used to achieve compliance with this Order.
5. Reporting Requirements H.11: Endangerment of Health and Environment. The Discharger must report any noncompliance that endangers human health or the environment. This information must be provided orally to the San Diego Water Board within 24-hours from the time the owner becomes aware of the circumstances. A written submission must also be provided within five days of the time the owner becomes aware of the circumstances.
6. Reporting Requirements H.12: Notification of Slope Failure. The Discharger must immediately notify the San Diego Water Board when a determination is made that a slope failure is occurring or has occurred at the Landfill. The Discharger must promptly repair any slope failure that affects or threatens the integrity or the performance of waste containment systems. |
The Discharger is monitoring and managing the leachate collection tank, the detention basin, and the construction areas for the Phase I and II units. |
Violation |
A |
Inspection |
1115756 |
03/24/2023 |
UAUTHDISC |
Unpermitted Discharge of a Pollutant to Waters of the U.S. in violation of the Federal Water Pollution Control Act, as amended (Clean Water Act), Porter-Cologne Water Quality Control Act, as amended, Water Quality Control Plan for the San Diego Basin, and Order No. R9-2010-0004. |
The Discharger is monitoring and managing the leachate collection tank, the detention basin, and the construction areas for the Phase I and II units. |
Violation |
A |
Inspection |
1115491 |
03/17/2023 |
Order Conditions |
Failure to comply with Order No. R9-2010-0004.
1. Landfill Operation Specifications D.7.e: Erosion Control. The Landfill cover must be maintained to minimize the percolation of liquids through waste.
2. Landfill Construction Specifications E.4.e: Slope Stability. The Discharger must design, construct, and maintain all containment structures so they are capable of containing waste, waste constituents, and degradation products of wastes to prevent water quality impacts from the discharges of waste at the Landfill.
3. Landfill Construction Specifications E.10.a: Landfill Cover. The Discharger must ensure that the intermediate cover is designed and constructed to minimize the percolation of liquids through waste.
4. Provisions G.5: proper Operation and Maintenance. The Discharger must properly operate and maintain all facilities and systems of treatment and control installed or used to achieve compliance with this Order.
5. Reporting Requirements H.11: Endangerment of Health and Environment. The Discharger must report any noncompliance that endangers human health or the environment. This information must be provided orally to the San Diego Water Board within 24-hours from the time the owner becomes aware of the circumstances. A written submission must also be provided within five days of the time the owner becomes aware of the circumstances.
6. Reporting Requirements H.12: Notification of Slope Failure. The Discharger must immediately notify the San Diego Water Board when a determination is made that a slope failure is occurring or has occurred at the Landfill. The Discharger must promptly repair any slope failure that affects or threatens the integrity or the performance of waste containment systems. |
The Discharger is monitoring and managing the leachate collection tank, the detention basin, and the construction areas for the Phase I and II units. |
Violation |
A |
Inspection |
1115490 |
03/17/2023 |
UAUTHDISC |
Unpermitted Discharge of a Pollutant to Waters of the U.S. in violation of the Federal Water Pollution Control Act, as amended (Clean Water Act), Porter-Cologne Water Quality Control Act, as amended, Water Quality Control Plan for the San Diego Basin, and Order No. R9-2010-0004. |
The Discharger is monitoring and managing the leachate collection tank, the detention basin, and the construction areas for the Phase I and II units. |
Violation |
A |
Inspection |
1115540 |
02/25/2023 |
BPP |
Failure to Comply with the Water Quality Control Plan for the San Diego Basin Waste Discharge Prohibition 1 and 8. |
|
Violation |
B |
Inspection |
1115542 |
02/25/2023 |
Order Conditions |
Failure to comply with Order No. R9-2010-0004 Landfill Operation Specifications, D.7.e: Erosion Control; Landfill Construction Specifications, E.4.e: Slope Stability; Landfill Construction Specifications E.10.a: Landfill Cover; and Provisions G.5: Proper Operation and Maintenance. |
|
Violation |
B |
Inspection |
1115543 |
02/25/2023 |
Failure to Notify |
Failure to Comply with Order No. R9-2010-0004 Reporting Requirement H.12: Notification of Slope Failure. |
|
Violation |
B |
Inspection |
1113202 |
01/16/2023 |
BPP |
Discharges of wastes to surface water, land, and the stormwater conveyance system. |
|
Violation |
B |
Inspection |
1113203 |
01/16/2023 |
Order Conditions |
Failure to contain wastes and waste byproducts. Failure to control stormwater run on and run off. Failure to operate and maintain the landfill in compliance with the order. |
|
Violation |
B |
Inspection |
1113207 |
08/29/2022 |
Order Conditions |
Geosynthetic Clay Liner (GCL) was exposed overnight. |
|
Violation |
B |
Report |
1115551 |
02/11/2022 |
Order Conditions |
Failure to control leachate and landfill gas produced by the degradation of
wastes in the Landfill in accordance with CCR title 27, section 20340(b) and
Order No. R9-2010-0004, sections C.3.b, D.1, and D.8.d, as amended. |
|
Violation |
B |
Inspection |
1115549 |
02/11/2022 |
Order Conditions |
Failure to maintain containment structure integrity in accordance with CCR
title 27, section 20310 and Order No. R9-2010-0004, sections E.3, E.4.d, and
G.5, as amended. |
|
Violation |
B |
Inspection |
1100740 |
02/01/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100791 |
02/01/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100790 |
01/31/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100739 |
01/28/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100789 |
01/28/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100738 |
01/27/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100788 |
01/27/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100737 |
01/26/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100787 |
01/26/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100736 |
01/25/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100786 |
01/25/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100735 |
01/24/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100785 |
01/24/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100765 |
01/23/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100734 |
01/21/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100784 |
01/21/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100733 |
01/20/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100783 |
01/20/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100732 |
01/19/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100782 |
01/19/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100731 |
01/18/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100781 |
01/18/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100730 |
01/14/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100780 |
01/14/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100729 |
01/13/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100779 |
01/13/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100728 |
01/12/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100778 |
01/12/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100727 |
01/11/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100777 |
01/11/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100726 |
01/10/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100776 |
01/10/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100725 |
01/07/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100775 |
01/07/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100724 |
01/06/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100774 |
01/06/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100723 |
01/05/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100773 |
01/05/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100722 |
01/04/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100772 |
01/04/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100721 |
01/03/2022 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100771 |
01/03/2022 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100720 |
12/30/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100770 |
12/30/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100719 |
12/29/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100769 |
12/29/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100718 |
12/28/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100768 |
12/28/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100717 |
12/27/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100767 |
12/27/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100716 |
12/24/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100766 |
12/24/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100715 |
12/23/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100714 |
12/22/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100764 |
12/22/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100713 |
12/21/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100763 |
12/21/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100711 |
12/20/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100762 |
12/20/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100710 |
12/17/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100761 |
12/17/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100709 |
12/16/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100760 |
12/16/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100708 |
12/15/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100759 |
12/15/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100707 |
12/14/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100758 |
12/14/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100706 |
12/13/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100757 |
12/13/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100705 |
12/10/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100756 |
12/10/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100704 |
12/09/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100755 |
12/09/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100703 |
12/08/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100754 |
12/08/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100702 |
12/07/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100753 |
12/07/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100701 |
12/06/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100752 |
12/06/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100700 |
12/03/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100751 |
12/03/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100699 |
12/02/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100750 |
12/02/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100698 |
12/01/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100749 |
12/01/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100697 |
11/30/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100748 |
11/30/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100696 |
11/29/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100747 |
11/29/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100695 |
11/24/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100746 |
11/24/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100694 |
11/23/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100745 |
11/23/2021 |
Order Conditions |
Failure to implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Slide Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in the Order No. R9--2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
1100693 |
11/22/2021 |
Deficient Reporting |
Failure to submit daily field reports in accordance with CCR title 27, section 20324 and Reporting Requirements prescribed in Order No. R9-2010-004, as amended. |
|
Violation |
B |
Report |
1100744 |
11/22/2021 |
Order Conditions |
Failure to Implement CQA oversight in accordance with CCR title 27, section 20324; the Phase I Unit Side Slope Liner System Design and Construction Requirements and Reporting Requirements prescribed in Order No. R9-2010-004, as amended; and the approved CAP. |
|
Violation |
B |
Report |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|