Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
1134991 |
08/12/2024 |
Surface Water |
Dissolved Oxygen Instantaneous Minimum limit is 7.o mg/L and reported value was 6.8 mg/L at RSW-001D. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. |
Violation |
B |
eSMR |
1134989 |
07/29/2024 |
Surface Water |
Dissolved Oxygen Instantaneous Minimum limit is 7.0 mg/L and reported value was 6.6 mg/L at RSW-001D. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. |
Violation |
B |
eSMR |
1130231 |
06/27/2024 |
CAT1 |
Manganese, Total Monthly Average (Mean) limit is 80 ug/L and reported value was 90 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. |
Violation |
B |
eSMR |
1130232 |
06/27/2024 |
CAT2 |
Arsenic, Total Monthly Average (Mean) limit is 10 ug/L and reported value was 12 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. |
Violation |
B |
eSMR |
1126546 |
02/28/2024 |
CAT1 |
Manganese, Total Daily Maximum limit is 160 ug/L and reported value was 230 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. |
Violation |
B |
eSMR |
1126545 |
02/28/2024 |
CAT1 |
Manganese, Total Monthly Average limit is 80 ug/L and reported value was 230 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. |
Violation |
B |
eSMR |
1126542 |
01/31/2024 |
OEV |
pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.75 SU at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. |
Violation |
B |
eSMR |
1126543 |
01/31/2024 |
CAT1 |
Manganese, Total Maximum Daily (MDEL) limit is 160 ug/L and reported value was 340 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. |
Violation |
B |
eSMR |
1126548 |
01/31/2024 |
CAT1 |
Manganese, Total Monthly Average limit is 80 ug/L and reported value was 340 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. |
Violation |
B |
eSMR |
1123594 |
12/29/2023 |
OEV |
pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.98 SU at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123601 |
12/20/2023 |
OEV |
pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.91 SU at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123587 |
12/12/2023 |
CAT1 |
Iron, Total Recoverable Monthly Average limit is 470 ug/L and reported value was 500 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123588 |
12/12/2023 |
CAT1 |
Manganese, Total Recoverable Maximum Daily (MDEL) limit is 160 ug/L and reported value was 220 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123579 |
12/12/2023 |
CAT1 |
Manganese, Total Recoverable Monthly Average limit is 80 ug/L and reported value was 220 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123586 |
12/11/2023 |
OEV |
pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.98 SU at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123581 |
12/11/2023 |
Surface Water |
pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.91 SU at RSW-001D. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123585 |
12/05/2023 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 9.40 SU at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123592 |
11/30/2023 |
CAT1 |
Manganese, Total Recoverable Monthly Average limit is 80 ug/L and reported value was 100 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123599 |
11/29/2023 |
OEV |
pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.62 SU at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123580 |
11/29/2023 |
Surface Water |
Turbidity Instantaneous Maximum limit is 5 NTU and reported value was 102 NTU at RSW-001D. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123584 |
11/29/2023 |
Surface Water |
pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.62 SU at RSW-001D. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123598 |
11/20/2023 |
OEV |
pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.88 SU at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123583 |
11/16/2023 |
OEV |
pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.69 SU at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123582 |
11/08/2023 |
OEV |
pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.70 SU at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123597 |
10/31/2023 |
OEV |
pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.89 SU at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123596 |
10/25/2023 |
OEV |
pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.72 SU at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123590 |
10/20/2023 |
CAT1 |
Manganese, Total Recoverable Maximum Daily (MDEL) limit is 160 ug/L and reported value was 260.0 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123591 |
10/20/2023 |
CAT1 |
Manganese, Total Recoverable Monthly Average limit is 80 ug/L and reported value was 260 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123595 |
10/12/2023 |
OEV |
pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.84 SU at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. |
Violation |
B |
eSMR |
1123589 |
10/04/2023 |
OEV |
pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.61 SU at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will be completed by November 2023. |
Violation |
B |
eSMR |
1123153 |
08/29/2023 |
DMON |
Discontinuous flow - The Discharger stated that continuous flow was not monitored at EFF-001 on 23 August 2023 and 29 August 2023 because of a flow meter data recorder malfunction. A manual reading was not obtained on these days. |
Routine flow monitoring was restored when the data recorder malfunction was corrected. |
Violation |
B |
Report |
1118970 |
04/30/2023 |
CAT1 |
Iron, Total Recoverable Monthly Average limit is 470 ug/L and reported value was 1200 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) is scheduled for the Fall of 2023. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will be completed by November 2023. |
Violation |
B |
eSMR |
1118969 |
04/30/2023 |
CAT1 |
Manganese, Total Recoverable Monthly Average limit is 80 ug/L and reported value was 530 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) is scheduled for the Fall of 2023. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will be completed by November 2023. |
Violation |
B |
eSMR |
1118967 |
04/30/2023 |
CAT2 |
Arsenic, Total Recoverable Monthly Average limit is 10 ug/L and reported value was 19 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) is scheduled for the Fall of 2023. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will be completed by November 2023. |
Violation |
B |
eSMR |
1118968 |
04/27/2023 |
CAT1 |
Iron, Total Recoverable Maximum Daily (MDEL) limit is 930 ug/L and reported value was 1200 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) is scheduled for the Fall of 2023. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will be completed by November 2023. |
Violation |
B |
eSMR |
1118966 |
04/27/2023 |
CAT1 |
Manganese, Total Recoverable Maximum Daily (MDEL) limit is 160 ug/L and reported value was 530 ug/L at EFF-001. |
A scope of work to clean-out a portion of the passive treatment system (PTS) is scheduled for the Fall of 2023. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will be completed by November 2023. |
Violation |
B |
eSMR |
1115760 |
03/31/2023 |
CAT1 |
Manganese, Total Recoverable Monthly Average limit is 80 ug/L and reported value was 380 ug/L at EFF-001. |
A scope of work to remove accumulated vegetation and settled solids in wetland 1 of the PTS has been developed and will be issued for bid soon. Removing the vegetation and solids is anticipated to increase the residence time in wetland 1 and improve treatment effectiveness. It is anticipated that this work will be completed by October 2023. |
Violation |
B |
eSMR |
1115759 |
03/31/2023 |
CAT2 |
Arsenic, Total Recoverable Monthly Average limit is 10 ug/L and reported value was 10.6 ug/L at EFF-001. |
A scope of work to remove accumulated vegetation and settled solids in wetland 1 of the PTS has been developed and will be issued for bid soon. Removing the vegetation and solids is anticipated to increase the residence time in wetland 1 and improve treatment effectiveness. It is anticipated that this work will be completed by October 2023. |
Violation |
U |
eSMR |
1119303 |
03/29/2023 |
CAT1 |
Manganese, Total Recoverable Maximum Daily (MDEL) limit is 160 ug/L and reported value was 250 ug/L at EFF-001. |
A scope of work to remove accumulated vegetation and settled solids in wetland 1 of the PTS has been developed and will be issued for bid soon. Removing the vegetation and solids is anticipated to increase the residence time in wetland 1 and improve treatment effectiveness. It is anticipated that this work will be completed by October 2023. |
Violation |
B |
eSMR |
1115761 |
03/16/2023 |
CAT1 |
Manganese, Total Recoverable Maximum Daily (MDEL) limit is 160 ug/L and reported value was 510 ug/L at EFF-001. |
A scope of work to remove accumulated vegetation and settled solids in wetland 1 of the PTS has been developed and will be issued for bid soon. Removing the vegetation and solids is anticipated to increase the residence time in wetland 1 and improve treatment effectiveness. It is anticipated that this work will be completed by October 2023. |
Violation |
B |
eSMR |
1115758 |
01/31/2023 |
CAT1 |
Manganese, Total Recoverable Maximum Daily (MDEL) limit is 160 ug/L and reported value was 200 ug/L at EFF-001. |
A scope of work to remove accumulated vegetation and settled solids in wetland 1 of the PTS has been developed and will be issued for bid soon. Removing the vegetation and solids is anticipated to increase the residence time in wetland 1 and improve treatment effectiveness. It is anticipated that this work will be completed by October 2023. |
Violation |
B |
eSMR |
1115762 |
01/31/2023 |
CAT1 |
Manganese, Total Recoverable Monthly Average (Mean) limit is 80 ug/L and reported value was 200 ug/L at EFF-001. |
A scope of work to remove accumulated vegetation and settled solids in wetland 1 of the PTS has been developed and will be issued for bid soon. Removing the vegetation and solids is anticipated to increase the residence time in wetland 1 and improve treatment effectiveness. It is anticipated that this work will be completed by October 2023. |
Violation |
B |
eSMR |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|