General Information
Region Place ID Place Name Place Type Place Address Place County
5S 222733 Empire Mine State Historic Park Metal Mining 10791 East Empire Grass Valley, CA, 95945 Nevada

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
643599 Person Liam Dooley Is A Data Submitter For 02/01/2024
640219 Person Jeramy Chapdelaine Is A Data Submitter For 02/01/2024
640219 Person Jeramy Chapdelaine Is Onsite Manager For 11/03/2023
641743 Person Joel Broddon Is A Data Submitter For 10/03/2023
635134 Person Kevin Douglas Kimball Is A Data Submitter For 09/27/2022 01/31/2024
577652 Person Gary Robert Leach Is Onsite Manager For 11/20/2018
531640 Person Donna Ernst Is A Data Submitter For 02/06/2012 06/07/2023
6995 Organization Ca Dept of Parks & Rec Sacramento Headquaters Operator State Agency 08/04/2008
6986 Organization Ca Dept of Parks & Rec Sacramento Owner State Agency 05/09/2008
6995 Organization Ca Dept of Parks & Rec Sacramento Headquaters Operator State Agency 05/09/2008 08/04/2008
388284 Person Spencer Joplin Case Worker 05/16/2007
378510 Person Kathleen Considine Is Onsite Manager For 05/15/2007 08/01/2013
Total Related Parties: 12

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
156997 Unregulated 5S DISCHLND 5A290800N01 Never Active N
413314 Enrollee - NPDES 5S NPDMINING R5-2022-0006-02 5A29NP00006 06/09/2017 03/31/2027 Active Y
385621 NPDES Permit 5S NPDMINING R5-2012-0050 5A29NP00006 07/28/2012 07/28/2017 Historical N
313660 NPDES Permit 5S NPDMINING R5-2006-0058 5A29NP00006 08/01/2006 07/31/2011 Historical N
Total Reg Measures: 4

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
1126544 02/28/2024 OEV Turbidity Instantaneous Maximum limit is 2.73 NTU and reported value was 3.23 NTU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. Violation U eSMR
1126546 02/28/2024 CAT1 Manganese, Total Daily Maximum limit is 160 ug/L and reported value was 230 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. Violation U eSMR
1126545 02/28/2024 CAT1 Manganese, Total Monthly Average limit is 80 ug/L and reported value was 230 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. Violation U eSMR
1126547 01/31/2024 OEV Turbidity Instantaneous Maximum limit is 3.35 NTU and reported value was 5.20 NTU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. Violation U eSMR
1126542 01/31/2024 OEV pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.75 SU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. Violation U eSMR
1126549 01/31/2024 OEV pH Instantaneous Minimum limit is 6.5 SU and reported value was 5.84 SU at RSW-001D. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. Violation U eSMR
1126543 01/31/2024 CAT1 Manganese, Total Maximum Daily (MDEL) limit is 160 ug/L and reported value was 340 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. Violation U eSMR
1126548 01/31/2024 CAT1 Manganese, Total Monthly Average limit is 80 ug/L and reported value was 340 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023 but was put on hold for the wet season. This clean-out includes the removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will recommence following the 2023-2024 wet season and the contract dispute. Violation U eSMR
1123594 12/29/2023 OEV pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.98 SU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123601 12/20/2023 OEV pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.91 SU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123587 12/12/2023 CAT1 Iron, Total Recoverable Monthly Average limit is 470 ug/L and reported value was 500 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123588 12/12/2023 CAT1 Manganese, Total Recoverable Maximum Daily (MDEL) limit is 160 ug/L and reported value was 220 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123579 12/12/2023 CAT1 Manganese, Total Recoverable Monthly Average limit is 80 ug/L and reported value was 220 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123586 12/11/2023 OEV pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.98 SU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123581 12/11/2023 Surface Water pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.91 SU at RSW-001D. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123585 12/05/2023 OEV pH Instantaneous Maximum limit is 8.5 SU and reported value was 9.40 SU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123592 11/30/2023 CAT1 Manganese, Total Recoverable Monthly Average limit is 80 ug/L and reported value was 100 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123599 11/29/2023 OEV pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.62 SU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123580 11/29/2023 Surface Water Turbidity Instantaneous Maximum limit is 5 NTU and reported value was 102 NTU at RSW-001D. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123584 11/29/2023 Surface Water pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.62 SU at RSW-001D. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123598 11/20/2023 OEV pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.88 SU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123583 11/16/2023 OEV pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.69 SU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123582 11/08/2023 OEV pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.70 SU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123597 10/31/2023 OEV pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.89 SU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123596 10/25/2023 OEV pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.72 SU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123590 10/20/2023 CAT1 Manganese, Total Recoverable Maximum Daily (MDEL) limit is 160 ug/L and reported value was 260.0 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123591 10/20/2023 CAT1 Manganese, Total Recoverable Monthly Average limit is 80 ug/L and reported value was 260 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however, was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123595 10/12/2023 OEV pH Instantaneous Maximum limit is 8.50 SU and reported value was 8.84 SU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. The cleanout project is anticipated to resume following the wet season. Violation B eSMR
1123589 10/04/2023 OEV pH Instantaneous Maximum limit is 8.5 SU and reported value was 8.61 SU at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) was commenced in Fall of 2023, however was put on hold for the wet season. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will be completed by November 2023. Violation B eSMR
1123153 08/29/2023 DMON Discontinuous flow - The Discharger stated that continuous flow was not monitored at EFF-001 on 23 August 2023 and 29 August 2023 because of a flow meter data recorder malfunction. A manual reading was not obtained on these days. Routine flow monitoring was restored when the data recorder malfunction was corrected. Violation B Report
1118970 04/30/2023 CAT1 Iron, Total Recoverable Monthly Average limit is 470 ug/L and reported value was 1200 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) is scheduled for the Fall of 2023. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will be completed by November 2023. Violation B eSMR
1118969 04/30/2023 CAT1 Manganese, Total Recoverable Monthly Average limit is 80 ug/L and reported value was 530 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) is scheduled for the Fall of 2023. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will be completed by November 2023. Violation B eSMR
1118967 04/30/2023 CAT2 Arsenic, Total Recoverable Monthly Average limit is 10 ug/L and reported value was 19 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) is scheduled for the Fall of 2023. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will be completed by November 2023. Violation B eSMR
1118968 04/27/2023 CAT1 Iron, Total Recoverable Maximum Daily (MDEL) limit is 930 ug/L and reported value was 1200 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) is scheduled for the Fall of 2023. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will be completed by November 2023. Violation B eSMR
1118966 04/27/2023 CAT1 Manganese, Total Recoverable Maximum Daily (MDEL) limit is 160 ug/L and reported value was 530 ug/L at EFF-001. A scope of work to clean-out a portion of the passive treatment system (PTS) is scheduled for the Fall of 2023. This clean-out will include removal of accumulated vegetation in the settling pond and removal of accumulated vegetation and settled solids in Wetland 1. Removing the vegetation and settled solids is expected to increase residence time and improve treatment effectiveness. It is anticipated that this work will be completed by November 2023. Violation B eSMR
1115760 03/31/2023 CAT1 Manganese, Total Recoverable Monthly Average limit is 80 ug/L and reported value was 380 ug/L at EFF-001. A scope of work to remove accumulated vegetation and settled solids in wetland 1 of the PTS has been developed and will be issued for bid soon. Removing the vegetation and solids is anticipated to increase the residence time in wetland 1 and improve treatment effectiveness. It is anticipated that this work will be completed by October 2023. Violation B eSMR
1115759 03/31/2023 CAT2 Arsenic, Total Recoverable Monthly Average limit is 10 ug/L and reported value was 10.6 ug/L at EFF-001. A scope of work to remove accumulated vegetation and settled solids in wetland 1 of the PTS has been developed and will be issued for bid soon. Removing the vegetation and solids is anticipated to increase the residence time in wetland 1 and improve treatment effectiveness. It is anticipated that this work will be completed by October 2023. Violation U eSMR
1119303 03/29/2023 CAT1 Manganese, Total Recoverable Maximum Daily (MDEL) limit is 160 ug/L and reported value was 250 ug/L at EFF-001. A scope of work to remove accumulated vegetation and settled solids in wetland 1 of the PTS has been developed and will be issued for bid soon. Removing the vegetation and solids is anticipated to increase the residence time in wetland 1 and improve treatment effectiveness. It is anticipated that this work will be completed by October 2023. Violation B eSMR
1115761 03/16/2023 CAT1 Manganese, Total Recoverable Maximum Daily (MDEL) limit is 160 ug/L and reported value was 510 ug/L at EFF-001. A scope of work to remove accumulated vegetation and settled solids in wetland 1 of the PTS has been developed and will be issued for bid soon. Removing the vegetation and solids is anticipated to increase the residence time in wetland 1 and improve treatment effectiveness. It is anticipated that this work will be completed by October 2023. Violation B eSMR
1115758 01/31/2023 CAT1 Manganese, Total Recoverable Maximum Daily (MDEL) limit is 160 ug/L and reported value was 200 ug/L at EFF-001. A scope of work to remove accumulated vegetation and settled solids in wetland 1 of the PTS has been developed and will be issued for bid soon. Removing the vegetation and solids is anticipated to increase the residence time in wetland 1 and improve treatment effectiveness. It is anticipated that this work will be completed by October 2023. Violation B eSMR
1115762 01/31/2023 CAT1 Manganese, Total Recoverable Monthly Average (Mean) limit is 80 ug/L and reported value was 200 ug/L at EFF-001. A scope of work to remove accumulated vegetation and settled solids in wetland 1 of the PTS has been developed and will be issued for bid soon. Removing the vegetation and solids is anticipated to increase the residence time in wetland 1 and improve treatment effectiveness. It is anticipated that this work will be completed by October 2023. Violation B eSMR
1091900 02/20/2020 DMON Discharger did not conduct weekly pH monitoring during the week of 2/16/2020 Violation B Report
1065268 06/14/2019 DMON Discharger did not monitor/report dissolved oxygen during the second week of June 2019 Violation B Report
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 43 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
CAT1 = Category 1 Pollutant (Effluent Violation for Group 1 Pollutant) CAT2 = Category 2 Pollutant (Effluent Violation for Group 2 Pollutant)
DMON = Deficient Monitoring OEV = Other Effluent Violation
Surface Water = Surface Water

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
455960 Notice of Violation null 02/21/2024 Historical
455500 Notice of Violation null 01/10/2024 Historical
453936 Notice of Violation null 07/21/2023 Historical
435530 Admin Civil Liability R5-2019-0538 01/21/2020 Historical
434935 Notice of Violation null 10/15/2019 Historical
432964 Notice of Violation null 07/02/2019 Historical
416454 Notice of Violation 09/20/2017 Historical
407618 Notice of Violation 06/24/2016 Historical
407626 Notice of Violation 06/07/2016 Historical
400157 Notice of Violation 03/02/2015 Historical
394636 Notice of Violation 02/04/2014 Historical
393181 Admin Civil Liability R5-2013-0556 09/18/2013 Historical
391308 Notice of Violation 06/17/2013 Historical
386898 Notice of Violation 08/07/2012 Historical
386610 Notice of Violation 07/20/2012 Historical
385623 Time Schedule Order R5-2012-0051 06/08/2012 Historical
385502 Notice of Violation 06/06/2012 Historical
385195 Notice of Violation 05/07/2012 Historical
383700 Admin Civil Liability R5-2012-0518 03/09/2012 Historical
383571 Notice of Violation 02/23/2012 Historical
383573 Notice of Violation 02/03/2012 Historical
381025 Notice of Violation 08/24/2011 Historical
378997 Admin Civil Liability R5-2011-0567 05/06/2011 Historical
428175 Clean-up and Abatement Order R5-2011-0705 05/01/2011 Active
378556 Notice of Violation 03/28/2011 Historical
377146 Admin Civil Liability R5-2011-0501 01/07/2011 Historical
376662 Notice of Violation 11/15/2010 Historical
376529 Admin Civil Liability R5-2011-0001 11/04/2010 Historical
376163 Notice of Violation 10/01/2010 Historical
374326 Clean-up and Abatement Order R5-2009-0714 07/30/2009 Historical
367578 Notice of Violation 06/17/2009 Historical
352448 Clean-up and Abatement Order R5-2006-0731 10/05/2006 Historical
361362 Time Schedule Order R5-2006-0059 06/23/2006 Historical
Total Enf Actions: 33

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
50089113 B Type compliance inspection Jeff Huggins 10/31/2022 N 0 Download
36615391 B Type compliance inspection Jeff Huggins 05/23/2019 N 0 Download
34897707 B Type compliance inspection Jeff Huggins 09/25/2018 N 0 Download
9905909 B Type compliance inspection Barry Hilton 10/02/2012 N 0 Download
8759100 Prerequirement inspection Audrey Signorelli (Multiple) 05/18/2011 N 0 Download
3614158 B Type compliance inspection Jeff Huggins (Multiple) 12/22/2010 N 0 [Attachments]
1940426 B Type compliance inspection Spencer Joplin 09/28/2009 N 0 N/A
1225953 B Type compliance inspection Jeff Huggins 10/19/2007 N 0 [Attachments]
308773 Complaint inspection Melissa Hall 03/05/2002 N 0 N/A
Total Inspections: 9 Last Inspection: 10/31/2022
  
The current report was generated with data as of: 06/14/2024