Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
1142034 |
10/01/2024 |
DMON |
Instrumentation for continual monitoring of Title 22 Compliance is offline. Violating Board Order R6V-01-41 WDR section I.B.a.- f.; C. 1-10. MRP Section E.4e. |
Discharger did not propose or identify any corrective actions taken. |
Violation |
B |
Report |
1142029 |
10/01/2024 |
DMON |
the 15-minute holding time for pH samples was exceeded. Violating Board Order R6V-01-41 MRP Sections 1.a., b., and c. |
Staff will determine if a portable EPA-certified pH meter for testing can be acquired. |
Violation |
B |
Report |
1131248 |
01/24/2024 |
Order Conditions |
The 15-minute holding time for pH samples was exceeded. Violating Board Order R6V-01-41 sections |
Staff will determine if a portable EPA-certified pH meter for testing can be acquired. |
Violation |
B |
Report |
1128855 |
01/01/2024 |
DMON |
Failed to provide results for several parameters related to flow monitoring. Violating Board Order R6V-01-41 MRP Sections I.A.1,2,3,4,5,6. |
Flow meter replacement project is due to be completed by end of August/ September 2024. |
Violation |
B |
Report |
1131247 |
01/01/2024 |
DMON |
Title 22 Recycled Water Monitoring Failure Instrumentation for continual monitoring of Title 22 Compliance is offline. |
Research is being performed to establish the proper course of action to repair and/or reinstall all necessary analyzers and SCADA systems to meet discharge requirements. |
Violation |
B |
Report |
1120388 |
04/01/2023 |
DMON |
Violating WDR 6-01-41Sections I.A. 1,2,3,4,5,6. |
|
Violation |
B |
Report |
1120389 |
04/01/2023 |
DMON |
Violating WDR 6-01-41Sections I.A. 1,2,3,4,5,6. |
|
Violation |
B |
Report |
1106684 |
01/01/2022 |
DMON |
Failed to provide results for several parameters related to flow monitoring, effluent quality, and surface water quality. Violated Board Order No. RV6-01-41 section I.C.1,2,3,4,5,6. Reported Values - Daily and Total Flows Estimated. Title 22 Recycled Water Monitoring Failure Instrumentation for continual monitoring of Title 22 Compliance is offline. 1. Continual CT is not available 2. Continual Chlorine Residual is not available 3. Continual Turbidity Monitoring is not available 4. Automatic Bypass system is not operational
|
Research is being performed to establish the proper course of action to repair and reinstall all necessary equipment and SCADA systems to meet discharge requirements. Flow meter replacement is pending. All reported values are grab samples and estimated based on flow. |