General Information
Region Place ID Place Name Place Type Place Address Place County
5F 219510 DELANO Growers Grape Products Food Processing NEC 32351 Bassett Delano, CA, 93215 Kern

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
12565 Organization Delano Growers Grape Products Owner Privately-Owned Business 03/28/1986
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
326588 WDR 5F WDRINDFP R5-2014-0064 5D152072001 06/06/2014 06/06/2024 Active N
144627 WDR 5F WDRINDFP 86-068 5D152072001 03/28/1986 03/25/1996 Historical N
Total Reg Measures: 2

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
1142107 02/10/2025 Order Conditions Failure to apply waste constituents at reasonable agronomic rates Violation B Inspection
1142108 02/10/2025 Order Conditions Failure to apply wastewater and irrigation water at reasonable hydraulic loading rates Violation B Inspection
1141524 12/31/2024 DMON Review for 2024 found the SMRs were not reporting total pounds of nitrate and FDS applied to the LAA and the quantified nitrogen and FDS crop uptakes. The SMRs also did not report monthly crop utilization rates or irrigation efficiency. Violation B Report
1141525 12/31/2024 Order Conditions Discharger is in violation of Prohibition A.4 for the years 2021 - 2024. The review found that BOD5 in the effluent was as high as 4233 mg/L, much higher than 348 mg/L average concentration reported in the Report of Waste Discharge (RWD). This is a violation of Discharge Prohibition A.4.for Discharge of wastes in a manner different from that described in the RWD. Violation B Report
1141406 12/29/2024 Order Conditions Block 3 BOD loading cycle average for December 26, 2024 - December 29, 2024, was 409.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141405 12/25/2024 Order Conditions Block 3 BOD loading cycle average for December 17, 2024 - December 25, 2024, was 136.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141430 12/08/2024 Order Conditions Block 4 BOD loading cycle average for December 3, 2024 - December 8, 2024, was 242.6lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141429 12/02/2024 Order Conditions Block 4 BOD loading cycle average for November 17, 2024 - December 2, 2024, was 145.1lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141428 11/16/2024 Order Conditions Block 4 BOD loading cycle average for November 10, 2024 - Nov 16, 2024, was 463.6lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141427 11/09/2024 Order Conditions Block 4 BOD loading cycle average for October 28, 2024 - Nov 9, 2024, was 537.6lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141389 10/20/2024 Order Conditions Block 2 BOD loading cycle average for October 14, 2024 - October 20, 2024, was 707.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141388 10/13/2024 Order Conditions Block 2 BOD loading cycle average for September 23, 2024 - October 13, 2024, was 305.1lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141404 09/02/2024 Order Conditions Block 3 BOD loading cycle average for August 28, 2024 - September 2, 2024, was 378.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141402 08/27/2024 Order Conditions Block 3 BOD loading cycle average for August 12, 2024 - August 27, 2024, was 220lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141426 08/04/2024 Order Conditions Block 4 BOD loading cycle average for July 29, 2024 - August 4, 2024, was 201.7lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141425 07/28/2024 Order Conditions Block 4 BOD loading cycle average for July 22, 2024 - July 28, 2024, was 282.7lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141424 07/21/2024 Order Conditions Block 4 BOD loading cycle average for July 15, 2024 - July 21, 2024, was 228.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141423 07/14/2024 Order Conditions Block 4 BOD loading cycle average for July 8, 2024 - July 14, 2024, was 326.8lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141422 07/07/2024 Order Conditions Block 4 BOD loading cycle average for July 1, 2024 - July 7, 2024, was 222.2lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141421 06/30/2024 Order Conditions Block 4 BOD loading cycle average for June 28, 2024 - June 30, 2024, was 104.6lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141469 06/23/2024 Order Conditions Block 7 BOD loading cycle average for June 17, 2024 - June 23, 2024, was 271.8lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141468 06/16/2024 Order Conditions Block 7 BOD loading cycle average for June 14, 2024 - June 16, 2024, was 134.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141467 06/13/2024 Order Conditions Block 7 BOD loading cycle average for June 10, 2024 - June 13, 2024, was 421lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141466 06/09/2024 Order Conditions Block 7 BOD loading cycle average for June 6, 2024 - June 9, 2024, was 127.3lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141420 05/05/2024 Order Conditions Block 4 BOD loading cycle average for May 1, 2024 - May 5, 2024, was 134.2lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1126403 04/18/2024 FEES Failure to maintain facility in good working order Violation B Inspection
1126364 04/18/2024 Order Conditions Absence of a fully functionable tailwater/runoff control system at the LAA Violation B Inspection
1126357 04/18/2024 Order Conditions Discharge of wastes in a manner different than described in the RWD Violation B Inspection
1126358 04/18/2024 Order Conditions Failure of discharge to remain in treatment/containment structures Violation B Inspection
1126360 04/18/2024 Order Conditions Failure to apply waste constituents at reasonable agronomic rates Violation B Inspection
1126361 04/18/2024 Order Conditions Failure to apply wastewater and irrigation water at reasonable hydraulic loading rates Violation B Inspection
1126362 04/18/2024 Order Conditions Failure to confine wastewater runoff to the LAA Violation B Inspection
1126363 04/18/2024 Order Conditions Failure to confine wastewater runoff to the LAA Violation B Inspection
1126404 04/18/2024 Order Conditions Failure to keep discharge within designated disposal area Violation B Inspection
1141337 04/18/2024 Order Conditions Objectionable odors creating a nuisance condition. Violation B Inspection
1126359 04/18/2024 Order Conditions Objectionable odors outside the limits where waste is discharged that threaten to create nuisance conditions. Violation B Inspection
1141338 04/18/2024 Order Conditions The discharge creates a condition of nuisance as defined by CWC Section 13050 Violation B Inspection
1126402 04/18/2024 Order Conditions Wastewater standing in the field for greater than 48 hours. Violation B Inspection
1141518 04/14/2024 Order Conditions Block 8 BOD loading cycle average for April 8, 2024 - April 14, 2024, was 255lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141523 12/31/2023 DMON Review for 2023 found the SMRs were not reporting total pounds of nitrate and FDS applied to the LAA and the quantified nitrogen and FDS crop uptakes. The SMRs also did not report monthly crop utilization rates or irrigation efficiency. Violation B Report
1122894 12/11/2023 Order Conditions Objectionable odors extending offsite creating a condition of nuisance. Violation B Inspection
1123108 12/11/2023 Order Conditions Objectionable odors outside the limits where waste is discharged, a violation of Discharge Specification B.7. Violation B Inspection
1123203 12/11/2023 Order Conditions Violation of Discharge Specification B.4. for failure to keep discharge within the LAA Violation B Inspection
1123205 12/11/2023 Order Conditions Violation of Standard Provision A.12. for failure to keep the discharge within designated disposal areas Violation B Inspection
1122895 12/11/2023 Order Conditions Wastewater standing in the field for longer than 48 hours Violation B Inspection
1141401 12/06/2023 Order Conditions Block 3 BOD loading cycle average for November 27, 2023 - December 6, 2023, was 425.8lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141400 11/26/2023 Order Conditions Block 3 BOD loading cycle average for November 12, 2023 - November 26, 2023, was 320.7lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141440 11/18/2023 Order Conditions Block 5 BOD loading cycle average for September 19, 2023 - November 18, 2023, was 180.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141399 11/11/2023 Order Conditions Block 3 BOD loading cycle average for November 7, 2023 - November 11, 2023, was 658.6lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141398 11/06/2023 Order Conditions Block 3 BOD loading cycle average for November 3, 2023 - November 6, 2023, was 242.7lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141419 11/04/2023 Order Conditions Block 4 BOD loading cycle average for October 30, 2023 - November 4, 2023, was 361.6lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141397 11/02/2023 Order Conditions Block 3 BOD loading cycle average for October 20, 2023 - November 2, 2023, was 577.3lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141418 10/29/2023 Order Conditions Block 4 BOD loading cycle average for October 1, 2023 - October 29, 2023, was 276.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141396 10/19/2023 Order Conditions Block 3 BOD loading cycle average for August 28, 2023 - October 19, 2023, was 183.6lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141378 10/15/2023 Order Conditions Block 1 BOD loading cycle average for September 13, 2023 - October 15, 2023, was 111.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141417 09/17/2023 Order Conditions Block 4 BOD loading cycle average for September 7, 2023 - September 17, 2023, was 350.4lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141517 08/24/2023 Order Conditions Block 8 BOD loading cycle average for August 23, 2023 - August 24, 2023, was 234lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141465 08/23/2023 Order Conditions Block 7 BOD loading cycle average for August 22, 2023 - August 23, 2023, was 108.6lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141387 08/17/2023 Order Conditions Block 2 BOD loading cycle average for August 10, 2023 - August 17, 2023, was 202lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141439 08/14/2023 Order Conditions Block 5 BOD loading cycle average for Aug 8, 2023 - Aug 14, 2023, was 220.4lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141464 08/03/2023 Order Conditions Block 7 BOD loading cycle average for July 31, 2023 - August 3, 2023, was 171.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141516 08/02/2023 Order Conditions Block 8 BOD loading cycle average for August 1, 2023 - August 2, 2023, was 133lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141515 07/31/2023 Order Conditions Block 8 BOD loading cycle average for July 29, 2023 - July 31, 2023, was 348.4lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141514 07/28/2023 Order Conditions Block 8 BOD loading cycle average for July 25, 2023 - July 28, 2023, was 202.3lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141447 07/27/2023 Order Conditions Block 6 BOD loading cycle average for July 20, 2023 - July 27, 2023, was 234.3lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141513 07/24/2023 Order Conditions Block 8 BOD loading cycle average for July 10, 2023 - July 24, 2023, was 207.3lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141463 07/16/2023 Order Conditions Block 7 BOD loading cycle average for July 5, 2023 - July 16, 2023, was 145lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141512 07/09/2023 Order Conditions Block 8 BOD loading cycle average for June 29, 2023 - July 9, 2023, was 105.3lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141462 07/04/2023 Order Conditions Block 7 BOD loading cycle average for June 26, 2023 - July 4, 2023, was 148lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141461 06/25/2023 Order Conditions Block 7 BOD loading cycle average for June 19, 2023 - June 25, 2023, was 418.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141460 06/18/2023 Order Conditions Block 7 BOD loading cycle average for June 14, 2023 - June 18, 2023, was 211.8lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141459 06/13/2023 Order Conditions Block 7 BOD loading cycle average for June 5, 2023 - June 13, 2023, was 125lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141446 06/05/2023 Order Conditions Block 6 BOD loading cycle average for May 30, 2023 - June 5, 2023, was 621.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141458 06/04/2023 Order Conditions Block 7 BOD loading cycle average for June 1, 2023 - June 4, 2023, was 232.3lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141445 05/29/2023 Order Conditions Block 6 BOD loading cycle average for May 17, 2023 - May 29, 2023, was 162.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141438 05/25/2023 Order Conditions Block 5 BOD loading cycle average for May 22, 2023 - May 25, 2023, was 1023.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141511 05/23/2023 Order Conditions Block 8 BOD loading cycle average for May 15, 2023 - May 23, 2023, was 170lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141437 05/21/2023 Order Conditions Block 5 BOD loading cycle average for May 19, 2023 - May 21, 2023, was 413.3lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141510 05/14/2023 Order Conditions Block 8 BOD loading cycle average for May 8, 2023 - May 14, 2023, was 113lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141457 05/09/2023 Order Conditions Block 7 BOD loading cycle average for May 1, 2023 - May 9, 2023, was 131.6lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141509 05/07/2023 Order Conditions Block 8 BOD loading cycle average for May 4, 2023 - May 7, 2023, was 213lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141456 04/30/2023 Order Conditions Block 7 BOD loading cycle average for April 16, 2023 - April 30, 2023, was 231.4lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141508 04/27/2023 Order Conditions Block 8 BOD loading cycle average for April 20, 2023 - April 27, 2023, was 209lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141507 04/19/2023 Order Conditions Block 8 BOD loading cycle average for April 13, 2023 - April 19, 2023, was 275.7lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141506 03/18/2023 Order Conditions Block 8 BOD loading cycle average for March 17, 2023 - March 18, 2023, was 317.6lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141455 02/26/2023 Order Conditions Block 7 BOD loading cycle average for February 21, 2023 - February 26, 2023, was 221.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141454 02/07/2023 Order Conditions Block 7 BOD loading cycle average for January 30, 2023 - February 7, 2023, was 291.7lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141416 01/26/2023 Order Conditions Block 4 BOD loading cycle average for January 19, 2023 - January 26, 2023, was 249.8lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141436 01/12/2023 Order Conditions Block 5 BOD loading cycle average for December 27, 2022 - January 12, 2023, was 114.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141415 01/11/2023 Order Conditions Block 4 BOD loading cycle average for January 3, 2023 - January 11, 2023, was 142.8lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141522 12/31/2022 DMON Review for 2022 found the SMRs were not reporting total pounds of nitrate and FDS applied to the LAA and the quantified nitrogen and FDS crop uptakes. The SMRs also did not report monthly crop utilization rates or irrigation efficiency. Violation B Report
1141435 12/26/2022 Order Conditions Block 5 BOD loading cycle average for December 19, 2022 - December 26, 2022, was 268.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141395 12/13/2022 Order Conditions Block 3 BOD loading cycle average for November 26, 2022 - December 13, 2022, was 224.4lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141377 12/10/2022 Order Conditions Block 1 BOD loading cycle average for December 9, 2022 - December 10, 2022, was 406.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141376 12/08/2022 Order Conditions Block 1 BOD loading cycle average for December 7, 2022 - December 8, 2022, was 498.4lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141375 12/06/2022 Order Conditions Block 1 BOD loading cycle average for November 23, 2022 - December 6, 2022, was 113.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141373 11/22/2022 Order Conditions Block 1 BOD loading cycle average for October 26, 2022 - November 22, 2022, was 159.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141444 11/18/2022 Order Conditions Block 6 BOD loading cycle average for November 15, 2022 - November 18, 2022, was 458.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141386 11/11/2022 Order Conditions Block 2 BOD loading cycle average for October 28, 2022 - November 11, 2022, was 375.6lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141394 11/06/2022 Order Conditions Block 3 BOD loading cycle average for October 23, 2022 - November 6, 2022, was 163.3lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141434 10/20/2022 Order Conditions Block 5 BOD loading cycle average for October 3, 2022 - October 20, 2022, was 594lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141384 09/27/2022 Order Conditions Block 2 BOD loading cycle average for September 11, 2022 - September 27, 2022, was 148.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141383 09/27/2022 Order Conditions Block 2 BOD loading cycle average for September 4, 2022 - September 8, 2022, was 1318.4lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1108594 09/22/2022 Order Conditions Objection odors present offsite Violation B Inspection
1141382 09/08/2022 Order Conditions Block 2 BOD loading cycle average for September 4, 2022 - September 8, 2022, was 1318.4lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141453 07/28/2022 Order Conditions Block 7 BOD loading cycle average for July 19, 2022 - July 28, 2022, was 166.7lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141505 07/10/2022 Order Conditions Block 8 BOD loading cycle average for July 6, 2022 - July 10, 2022, was 291.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141393 06/12/2022 Order Conditions Block 3 BOD loading cycle average for June 8, 2022 - June 12, 2022, was 294.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141504 06/05/2022 Order Conditions Block 8 BOD loading cycle average for May 31, 2022 - June 5, 2022, was 784.3lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141433 05/24/2022 Order Conditions Block 5 BOD loading cycle average for May 23, 2022 - May 24, 2022, was 462lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141414 05/17/2022 Order Conditions Block 4 BOD loading cycle average for May 9, 2022 - May 17, 2022, was 115.6lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1109981 04/20/2022 Order Conditions Before making a material change in the character, location, or volume of discharge, the discharger shall file a new Report of Waste Discharge with the Regional Board. Violation B Inspection
1109965 04/20/2022 Order Conditions Discharge of waste at a location or in a manner different from that described in the RWD Violation B Complaint
1104194 04/20/2022 Order Conditions Effluent flowing onto the ground surface due to a split in a anaerobic tank Violation B Complaint
1109976 04/20/2022 Order Conditions Facility not maintained in good working order Violation B Inspection
1109979 04/20/2022 Order Conditions Failure to inform CVRWQCB of non-compliance with the Order once the Discharger has knowledge of non-compliance. Violation B Inspection
1109971 04/20/2022 Order Conditions The discharge shall remain within the permitted waste treatment/containment structures and LAA at all times. Violation B Inspection
1109969 04/20/2022 Order Conditions Wastewater treatment, storage, and disposal shall not cause pollution or a nuisance Violation B Complaint
1141503 03/28/2022 Order Conditions Block 8 BOD loading cycle average for March 25, 2022 - March 28, 2022, was 362lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141502 03/24/2022 Order Conditions Block 8 BOD loading cycle average for March 21, 2022 - March 24, 2022, was 429lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141501 03/20/2022 Order Conditions Block 8 BOD loading cycle average for March 18, 2022 - March 20, 2022, was 298lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141500 02/28/2022 Order Conditions Block 8 BOD loading cycle average for January 24, 2022 - February 28, 2022, was 135.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141452 02/17/2022 Order Conditions Block 7 BOD loading cycle average for February 5, 2022 - February 17, 2022, was 132.4lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141451 02/04/2022 Order Conditions Block 7 BOD loading cycle average for February 1, 2022 - February 4, 2022, was 251.3lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1103213 02/02/2022 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100.0 umhos/cm and reported value was 2475 umhos/cm. Violation B Report
1103214 02/02/2022 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100.0 umhos/cm and reported value was 2475 umhos/cm. Violation B Report
1141413 01/21/2022 Order Conditions Block 4 BOD loading cycle average for January 18, 2022 - January 21, 2022, was 318.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1104197 01/02/2022 Order Conditions 12M; Annual Cumulative Flow; 174,000 million; gal; DM; 181,452,508 Violation B Report
1141521 12/31/2021 DMON Review for 2021 found the SMRs were not reporting total pounds of nitrate and FDS applied to the LAA and the quantified nitrogen and FDS crop uptakes. The SMRs also did not report monthly crop utilization rates or irrigation efficiency. Violation B Report
1141381 12/18/2021 Order Conditions Block 2 BOD loading cycle average for December 4, 2021 - December 18, 2021, was 203.2lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141392 11/28/2021 Order Conditions Block 3 BOD loading cycle average for November 19, 2021 - November 28, 2021, was 156.1lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1103209 11/02/2021 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100.0 umhos/cm and reported value was 2600 umhos/cm. Violation B Report
1103210 11/02/2021 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100.0 umhos/cm and reported value was 2675 umhos/cm. Violation B Report
1103211 11/02/2021 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100.0 umhos/cm and reported value was 2850 umhos/cm. Violation B Report
1141432 10/11/2021 Order Conditions Block 5 BOD loading cycle average for September 30, 2021 - October 11, 2021, was 143lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141499 09/24/2021 Order Conditions Block 8 BOD loading cycle average for September 23, 2021 - September 24, 2021, was 295.3lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141498 08/22/2021 Order Conditions Block 8 BOD loading cycle average for August 18, 2021 - August 22, 2021, was 449lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141497 08/17/2021 Order Conditions Block 8 BOD loading cycle average for July 27, 2021 - August 17, 2021, was 121bs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141496 07/15/2021 Order Conditions Block 8 BOD loading cycle average for June 28, 2021 - July 15, 2021, was 187.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141443 07/11/2021 Order Conditions Block 6 BOD loading cycle average for July 9, 2021 - July 11, 2021, was 648.3lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141442 07/08/2021 Order Conditions Block 6 BOD loading cycle average for June 24, 2021 - July 8, 2021, was 308.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141412 07/06/2021 Order Conditions Block 4 BOD loading cycle average for June 14, 2021 - July 6, 2021, was 138.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141450 07/05/2021 Order Conditions Block 7 BOD loading cycle average for July 2, 2021 - July 5, 2021, was 258.2lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141449 07/01/2021 Order Conditions Block 7 BOD loading cycle average for June 21, 2021 - July 1, 2021, was 164.4lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141495 06/27/2021 Order Conditions Block 8 BOD loading cycle average for June 17, 2021 - June 27, 2021, was 175.6lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141448 06/20/2021 Order Conditions Block 7 BOD loading cycle average for June 18, 2021 - June 20, 2021, was 229.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141494 06/16/2021 Order Conditions Block 8 BOD loading cycle average for June 13, 2021 - June 16, 2021, was 715.8lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141411 06/13/2021 Order Conditions Block 4 BOD loading cycle average for June 7, 2021 - June 13, 2021, was 264.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141493 06/12/2021 Order Conditions Block 8 BOD loading cycle average for April 19, 2021 - June 12, 2021, was 106.8lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141410 06/06/2021 Order Conditions Block 4 BOD loading cycle average for June 4, 2021 - June 6, 2021, was 103lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141409 06/03/2021 Order Conditions Block 4 BOD loading cycle average for June 1, 2021 - June 3, 2021, was 193.9lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141408 05/31/2021 Order Conditions Block 4 BOD loading cycle average for May 3, 2021 - May 31, 2021, was 192.4lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141431 05/25/2021 Order Conditions Block 5 BOD loading cycle average for May 24, 2021 - May 25, 2021, was 134.8lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141391 05/21/2021 Order Conditions Block 3 BOD loading cycle average for May 15, 2021 - May 21, 2021, was 220.8lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141390 05/14/2021 Order Conditions Block 3 BOD loading cycle average for May 13, 2021 - May 14, 2021, was 235.7lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141372 04/27/2021 Order Conditions Block 1 BOD loading cycle average for April 26, 2021 - April 27, 2021, was 331.2lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141371 04/25/2021 Order Conditions Block 1 BOD loading cycle average for April 22, 2021 - April 25, 2021, was 490.5lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141370 04/21/2021 Order Conditions Block 1 BOD loading cycle average for March 8, 2021 - April 21, 2021, was 119lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141492 04/18/2021 Order Conditions Block 8 BOD loading cycle average for April 9, 2021 - April 18, 2021, was 393.2lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141380 04/12/2021 Order Conditions Block 2 BOD loading cycle average for Apr 8, 2021 - April 12, 2021, was 456lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141441 04/09/2021 Order Conditions Block 6 BOD loading cycle average for March 10, 2021 - April 9, 2021, was 112lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141407 03/16/2021 Order Conditions Block 4 BOD loading cycle average for March 5, 2021 - March 16, 2021, was 222.7lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141363 03/07/2021 Order Conditions Block 1 BOD loading cycle average for March 4, 2021 - March 7, 2021, was 199.7lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141362 03/03/2021 Order Conditions Block 1 BOD loading cycle average for Jan 4, 2021 - March 6, 2021, was 174.8lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1141379 02/24/2021 Order Conditions Block 2 BOD loading cycle average for February 22, 2021 - February 24, 2021, was 1068.4lbs/ac/day. The BOD loading to the LAA calculated as a cycle average as determined by the method described in the MRP, shall not exceed 100 pounds per day per acre. Violation B Report
1103208 02/02/2021 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100.0 umhos/cm and reported value was 2075 umhos/cm. Violation B Report
1103206 02/02/2021 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100.0 umhos/cm and reported value was 2843 umhos/cm. Violation B Report
1103212 02/02/2021 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100.0 umhos/cm and reported value was 2875 umhos/cm. Violation B Report
1103207 02/02/2021 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100.0 umhos/cm and reported value was 3079 umhos/cm. Violation B Report
1103203 11/02/2020 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100.0 umhos/cm and reported value was 2175 umhos/cm. Violation B Report
1103205 11/02/2020 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100.0 umhos/cm and reported value was 2625 umhos/cm. Violation B Report
1103204 11/02/2020 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100.0 umhos/cm and reported value was 2979.75 umhos/cm. Violation B Report
1103200 08/02/2020 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100 umhos/cm and reported value was 1775 umhos/cm. Violation B Report
1103201 08/02/2020 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100 umhos/cm and reported value was 1832.5 umhos/cm. Violation B Report
1103202 08/02/2020 OEV Electrical Conductivity @ 25 Deg. C Monthly Average limit is 1100.0 umhos/cm and reported value was 2175 umhos/cm. Violation B Report
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 175 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
DMON = Deficient Monitoring FEES = Fees
Order Conditions = Order Conditions OEV = Other Effluent Violation

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
456706 Notice of Violation 01/17/2024 Active
450292 Notice of Violation null 11/21/2022 Active
460905 Notice of Violation 07/11/2017 Active
396701 Time Schedule Order R5-2014-0065 06/06/2014 Active
350632 Oral Communication 08/13/2008 Historical
349085 Oral Communication 07/16/2008 Historical
332896 Staff Enforcement Letter 08/23/2007 Historical
254285 Oral Communication 05/24/2004 Historical
252337 Oral Communication 05/21/2004 Historical
249887 Oral Communication 10/15/2003 Historical
242600 Notice of Violation N/A 07/14/2003 Historical
229483 Notice of Violation N/A 07/08/1999 Historical
Total Enf Actions: 12

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
59678446 Complaint inspection Jeffrey Hannel 02/10/2025 N 0 [Attachments]
58451301 B Type compliance inspection Jeffrey Hannel 12/23/2024 N 0 N/A
59680154 Complaint inspection Jeffrey Hannel 04/18/2024 N 0 Download
54358441 Complaint inspection Jeffrey Hannel 12/14/2023 N 0 N/A
53981468 Complaint inspection Jeffrey Hannel 11/30/2023 N 0 N/A
52430841 B Type compliance inspection Jeffrey Hannel 07/20/2023 N 0 N/A
50323898 B Type compliance inspection Jeffrey Hannel 01/24/2023 N 0 N/A
49024825 Complaint inspection Jeffrey Hannel 09/22/2022 N 0 N/A
47750249 Complaint inspection Jeffrey Hannel 04/20/2022 N 0 N/A
8219686 B Type compliance inspection Scott Hatton 05/09/2012 Y 0 N/A
1201993 B Type compliance inspection Edward Balch 05/29/2007 Y 0 N/A
331135 A Type compliance inspection Jeff Gymer 04/29/2003 Y 0 N/A
306365 B Type compliance inspection Jeff Gymer 11/01/2001 Y 0 N/A
306363 B Type compliance inspection Jarma Bennett 06/15/1999 Y 0 N/A
306364 A Type compliance inspection Kevin Long 11/15/1995 Y 0 N/A
Total Inspections: 15 Last Inspection: 02/10/2025
  
The current report was generated with data as of: 05/07/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.