| Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
| 1146067 |
08/02/2025 |
LREP |
Quarterly SMR ( MONNPDES ) report for Q2 2025 (2732295) was due on 01-AUG-25 |
|
Violation |
B |
Report |
| 1148675 |
08/01/2025 |
Deficient Reporting |
We were late in submitting this report which was due on 8-1-25 |
We have hired new staff and are working to be in full compliance 1-1-26. |
Violation |
U |
eSMR |
| 1143347 |
05/02/2025 |
LREP |
Quarterly SMR ( MONNPDES ) report for Q1 2025 (2732294) was due on 01-MAY-25 |
|
Violation |
B |
Report |
| 1141243 |
03/02/2025 |
LREP |
Annual SMR ( MONNPDES ) report for 2024 (2732310) was due on 01-MAR-25 |
|
Violation |
B |
Report |
| 1146469 |
02/27/2025 |
Order Conditions |
The unauthorized discharge that occurred on February 27, 2025 through June 5, 2025
of untreated wastewater to groundwater violates Discharge Prohibitions in the Covelo CSD’s WDRs and NPDES Permit, Order No. R1-
2023-0006. |
|
Violation |
B |
Inspection |
| 1140069 |
02/02/2025 |
LREP |
Quarterly SMR ( MONNPDES ) report for Q4 2024 (2732293) was due on 01-FEB-25 |
|
Violation |
B |
Report |
| 1148370 |
01/03/2025 |
Surface Water |
Eff-002 total coliform violations on 1-3, 1-7, 1-14 and 1-21-25 |
Switched to CL2 disinfection from Ozone disinfection. |
Violation |
U |
eSMR |
| 1148369 |
01/01/2025 |
DMON |
Eff-002 missing monthly BOD and TSS results for Jan. and Feb. 2025 |
Posted discharge requirements at facility and trained new employee on requirements. |
Violation |
U |
eSMR |
| 1148371 |
01/01/2025 |
DMON |
No data reported for water level depth from top of pipe |
Set-up clipboard for storing well data |
Violation |
U |
eSMR |
| 1136017 |
11/02/2024 |
LREP |
Quarterly SMR ( MONNPDES ) report for Q3 2024 (2732292) was due on 01-NOV-24 |
|
Violation |
B |
Report |
| 1147162 |
10/01/2024 |
Deficient Reporting |
We have failed to meet our our discharge on our weekly effluent coliform sample limits. We have aliso been deficient in our reporting my missing sampling requirements on mentoring wells and EFF-002, sampling points. |
We have hired a new CPO and maintenance employee who both are being trained on our discharge permit requirements, plant maintenance and operations, and record keeping techniques. |
Violation |
U |
eSMR |
| 1131968 |
09/02/2024 |
LREP |
Once Only OneTime ( TECHRPT ) (Disaster Preparedness Assessment Report and Action Plan) report for 2023/08/01 (2732316) was due on 01-SEP-24 |
|
Violation |
B |
Report |
| 1130873 |
08/02/2024 |
LREP |
Quarterly SMR ( MONNPDES ) report for Q2 2024 (2732291) was due on 01-AUG-24 |
|
Violation |
B |
Report |
| 1146361 |
07/01/2024 |
DMON |
We are missing data for well monitoring for Q3 2024 including depth to ground water, Nitrite Nitrogen Total, Total Coliform Bacteria, and TDS. |
We have hired a CPO, and are training staff to meet reporting requirements. |
Violation |
U |
eSMR |
| 1128631 |
06/02/2024 |
LREP |
Once Only OneTime ( TECHRPT ) (Groundwater Pathogen Special Study Work Plan) report for 2023/08/01 (2732318) was due on 01-JUN-24 |
|
Violation |
B |
Report |
| 1127611 |
05/02/2024 |
LREP |
Quarterly SMR ( MONNPDES ) report for Q1 2024 (2732290) was due on 01-MAY-24 |
|
Violation |
B |
Report |
| 1125044 |
03/02/2024 |
LREP |
Annual SMR ( MONNPDES ) report for 2023 (2673573) was due on 01-MAR-24 |
|
Violation |
B |
Report |
| 1145096 |
01/28/2024 |
DMON |
Did not monitor during the period of discharge from 1/28/24 to 3/31/24 for TSS, BOD, PH, ammonia .nitrate, TDS, total nitrogen |
Set-up sampling calendar, hired a CPO in January 2025, and trained new employees |
Violation |
U |
eSMR |
| 1124318 |
12/31/2023 |
Order Conditions |
Total Coliform Monthly Median limit is 23 MPN/100 mL and reported value was 1600 MPN/100 mL at EFF-002. |
|
Violation |
B |
Report |
| 1124317 |
12/12/2023 |
Order Conditions |
Total Coliform Daily Maximum limit is 240 MPN/100 mL and reported value was 1600 MPN/100 mL at EFF-002. |
|
Violation |
B |
Report |
| 1124319 |
11/30/2023 |
Order Conditions |
Total Coliform Monthly Median limit is 23 MPN/100 mL and reported value was 1600 MPN/100 mL at EFF-002. |
|
Violation |
B |
Report |
| 1124316 |
11/27/2023 |
Order Conditions |
Total Coliform Daily Maximum limit is 240 MPN/100 mL and reported value was 1600 MPN/100 mL at EFF-002. |
|
Violation |
B |
Report |
| 1124315 |
11/22/2023 |
Order Conditions |
Total Coliform Daily Maximum limit is 240 MPN/100 mL and reported value was 1600 MPN/100 mL at EFF-002. |
|
Violation |
B |
Report |
| 1124314 |
11/17/2023 |
Order Conditions |
Total Coliform Daily Maximum limit is 240 MPN/100 mL and reported value was 1600 MPN/100 mL at EFF-002. |
|
Violation |
B |
Report |
| 1124313 |
11/10/2023 |
Order Conditions |
Total Coliform Daily Maximum limit is 240 MPN/100 mL and reported value was 1600 MPN/100 mL at EFF-002. |
|
Violation |
B |
Report |
| 1143829 |
10/01/2023 |
DMON |
No flow data |
Hired and trained new personnel |
Violation |
U |
eSMR |
| 1119233 |
08/02/2023 |
LREP |
Monthly SMR ( MONNPDES ) report for June 2023 (2705591) was due on 01-AUG-23 |
|
Violation |
B |
Report |
| 1118476 |
07/02/2023 |
LREP |
Monthly SMR ( MONNPDES ) report for May 2023 (2696457) was due on 01-JUL-23 |
|
Violation |
B |
Report |
| 1117905 |
06/02/2023 |
LREP |
Monthly SMR ( MONNPDES ) report for April 2023 (2686848) was due on 01-JUN-23 |
|
Violation |
B |
Report |
| 1116751 |
05/02/2023 |
LREP |
Monthly SMR ( MONNPDES ) report for March 2023 (2673572) was due on 01-MAY-23 |
|
Violation |
B |
Report |
| 1115436 |
04/02/2023 |
LREP |
Monthly SMR ( MONNPDES ) report for February 2023 (2673571) was due on 01-APR-23 |
|
Violation |
B |
Report |
| 1117292 |
03/31/2023 |
Order Conditions |
Total Coliform Monthly Median limit is 23 MPN/100 mL and reported value was 33 MPN/100 mL at EFF-002. |
added additional NaOCL |
Violation |
B |
eSMR |
| 1117291 |
03/14/2023 |
Order Conditions |
Total Coliform Single Sample Maximum limit is 240 MPN/100 mL and reported value was 1600 MPN/100 mL at EFF-002. |
added additional NaOCl |
Violation |
B |
eSMR |
| 1114578 |
03/02/2023 |
LREP |
Annual SMR ( MONNPDES ) report for 2022 (1910892) was due on 01-MAR-23 |
|
Violation |
B |
Report |
| 1114577 |
03/02/2023 |
LREP |
Monthly SMR ( MONNPDES ) report for January 2023 (2673570) was due on 01-MAR-23 |
|
Violation |
B |
Report |
| 1116231 |
02/28/2023 |
DMON |
EFF-002 samples for BOD,TSS, Ammonia, Nitrate & Total Nitrogen were missed in Feb 2023. Weekly TC sample collection and analysis was missed in 3 out of 4 weeks. |
Plant Operator (OIT) was counseled and directed to submit samples to the lab in accordance with current NPDES permit. |
Violation |
B |
eSMR |
| 1116230 |
02/07/2023 |
Order Conditions |
Total Coliform 30-Day Median limit is 23 MPN/100 mL and reported value was 240 MPN/100 mL at EFF-002. |
Added additional sodium hypochlorite to augment ozone system. |
Violation |
B |
eSMR |
| 1115067 |
01/31/2023 |
Order Conditions |
Total Coliform Monthly Median limit is 23 MPN/100 mL and reported value was 355 MPN/100 mL at EFF-002. |
INSTALLED TEMPORARY SODIUM HYPOCHLORITE SYSTEM. |
Violation |
B |
eSMR |
| 1115069 |
01/24/2023 |
Order Conditions |
Total Coliform Single Sample Maximum limit is 240 MPN/100 mL and reported value was 1600 MPN/100 mL at EFF-002. |
INSTALLED TEMPORARY SODIUM HYPOCHLORITE SYSTEM. |
Violation |
B |
eSMR |
| 1115068 |
01/19/2023 |
Order Conditions |
Total Coliform Single Sample Maximum limit is 240 MPN/100 mL and reported value was 540 MPN/100 mL at EFF-002. |
INSTALLED TEMPORARY SODIUM HYPOCHLORITE INJECTION SYSTEM. |
Violation |
B |
eSMR |
| 1111306 |
12/02/2022 |
LREP |
Monthly SMR ( MONNPDES ) report for October 2022 (2628439) was due on 01-DEC-22 |
|
Violation |
B |
Report |
| 1109298 |
10/02/2022 |
LREP |
Monthly SMR ( MONNPDES ) report for August 2022 (2606839) was due on 01-OCT-22 |
|
Violation |
B |
Report |
| 1106185 |
07/02/2022 |
LREP |
Monthly SMR ( MONNPDES ) report for May 2022 (2574381) was due on 01-JUL-22 |
|
Violation |
B |
Report |
| 1106695 |
06/30/2022 |
DMON |
No INF-001 monitoring for BOD/TSS was completed. |
Contract with temp agency for a certified operator. |
Violation |
B |
eSMR |
| 1105900 |
06/02/2022 |
LREP |
Monthly SMR ( MONNPDES ) report for April 2022 (2566422) was due on 01-JUN-22 |
|
Violation |
B |
Report |
| 1106692 |
05/31/2022 |
DMON |
NO lab results for BOD/TSS due to no certified operator on staff. |
Contract with temp agency for immediate operataor. |
Violation |
B |
eSMR |
| 1102840 |
03/15/2022 |
Order Conditions |
BOD5 @ 20 Deg. C, Percent Removal Monthly Average (Mean) limit is 85 % and reported value was 76 % at EFF-002. |
Draw samples later in the day or start drawing composite samples. |
Violation |
B |
eSMR |
| 1097910 |
11/30/2021 |
Order Conditions |
Total Coliform Monthly Average (Mean) limit is 23 MPN/100 mL and reported value was 241 MPN/100 mL at EFF-002. |
shutdown discharge, cleaned tanks, installed additional screen. |
Violation |
B |
eSMR |
| 1097909 |
11/03/2021 |
Order Conditions |
Total Coliform Daily Maximum limit is 240 MPN/100 mL and reported value was 920 MPN/100 mL at EFF-002. |
shut down and installed additional screening. |
Violation |
B |
eSMR |
| 1097220 |
10/27/2021 |
Order Conditions |
Total Coliform 30-Day Average limit is 23 MPN/100 mL and reported value was 1601 MPN/100 mL at EFF-002. |
Shutdown inspected found excessive organic materials and cleaned contact chamber and upstream wetwells Installed screen in holding pond outlet well in addition to the wetland outlet box screens that were damaged by wildlife. |
Violation |
B |
eSMR |
| 1097219 |
10/27/2021 |
Order Conditions |
Total Coliform Daily Maximum limit is 240 MPN/100 mL and reported value was 1601 MPN/100 mL at EFF-002. |
Shutdown, inspected and cleaned tanks and wells of excessive organic matter that passed through damaged screens. Installed an additional screen that will not likely be damaged by wildlife. |
Violation |
B |
eSMR |
|
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|